Berkeley Roofing Permits & Property Data

Live municipal building-permit feed for Berkeley, New Jersey.

Not shared leads. Not a marketplace. Every record is a public permit filing you can verify yourself — your competitors aren't handed the same list. One closed job typically covers the whole year. Cancel anytime in one click — no retention call.

PermitGrab tracks 100 building permits in Berkeley, NJ. Updated multiple times per week.

PermitGrab is a $149/mo subscription that surfaces every Berkeley building permit, contractor record, and code violation from the official municipal feed within 12-24 hours of filing — used by solar installers, roofers, HVAC contractors, real-estate investors, and insurance restoration teams to acquire leads at the moment a homeowner commits to a project. 14-day free trial below — cancel anytime in one click.

Filter Berkeley leads by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

100
Indexed Permits
0
Active Contractors
Updated recently · 2026-06-11
📊 View Berkeley live permit pulse →
Berkeley had 100 new building permits filed in the last 30 days, led by 39 general construction, 13 hvac and 13 roofing.

🔔 Get Roofing Daily Berkeley Permit Alerts

New permits, violations, and contractor activity delivered to your inbox.

Clear filters 📥 Export CSV 📊 Report
Showing 13 permits for Roofing

All permits

🔎 See for yourself — free: click any Reveal button to unmask up to 10 real contractor phone numbers. No account needed.

13 records — permits and code violations sorted by date

Date Type Value Address Details Contractor / Status Save
2026-06-10 Roofing 899 GRIZZLY PEAK Blvd, BERKELEY CA 94708 remove and replace existing roofing with comp shingle roofing
2026-06-10 Roofing 1801 BLAKE St, COM, BERKELEY CA 94703 Re-Roof Remove existing roofing material. Install new class A fire rated comp sh…
2026-06-10 Roofing 3012 ACTON St, BERKELEY CA 94702 Removal of old roofing material and installation of 950 sqft pitched and 200 sqf…
2026-06-10 Roofing 439 ARLINGTON Ave, BERKELEY CA 94707 Overlay existing roof with modified bitumen.
2026-06-10 Roofing 2120 SACRAMENTO St, 4, BERKELEY CA 94702 REV01-Small change in roof. **No Increase in Valuation**
2026-06-09 Roofing 1205 EVELYN Ave, BERKELEY CA 94706 remove existing roof layers, install new class A comp shingles.
2026-06-09 Solar 2766 ACTON St, BERKELEY CA 94702 Tear off old roof layers, install new roof assembly. Remove and reinstall existi…
2026-06-09 Roofing 976 GRIZZLY PEAK Blvd, BERKELEY CA 94708 Roof Replacement – Asphalt composition shingles (up to 2 layers to be removed) P…
2026-06-08 Solar 1521 BLAKE St, BERKELEY CA 94703 Tear off and re roof 6 squares section only of flat roof. WE ARE NOT DOING THE S…
2026-06-08 Roofing 1337 CARLOTTA Ave, BERKELEY CA 94703 Reroof 19 sq of comp shingles, Like for like. Not in Fire zone.
2026-06-08 Roofing 2716 CEDAR St, BERKELEY CA 94708 Removal of existing roofing materials and installation of new class-A roofing as…
2026-06-08 Roofing 2616 MATHEWS St, BERKELEY CA 94702 Chimney removal. Patching of affected wall and roof.
2026-06-08 Roofing 1464 SIXTH St, 94710-1431 United States Remove and replace roofing material

No contractor lead data available for Berkeley. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Berkeley
Construction Activity in Berkeley

New building permits in Berkeley, New Jersey indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Berkeley Building Permits

Berkeley, New Jersey processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 100+ Berkeley building permits — updated multiple times per week from official city sources.

Every new construction project in Berkeley requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Berkeley.

How Contractors Use Berkeley Permit Data

HVAC contractors, electricians, plumbers, and roofers in Berkeley use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Berkeley building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Berkeley electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Reviewed by Marcus Reeves · Page data current as of · Sources: official Berkeley open data portal.

Who pulled permits in Berkeley this week?

PermitGrab indexes 100 building permits in Berkeley, with new filings from the city's permit feed on every refresh.

How fresh is Berkeley permit data?

Updated multiple times per week. Permit records carry filing date, address, project value, contractor name (where the source publishes it), and permit type, so a fresh row means a fresh lead.

What construction is happening in Berkeley right now?

In the last 30 days, Berkeley permitting activity covers 100 new building permits. The mix spans new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, and tenant improvements — every record is a buying signal for a different contractor or supplier persona.

Berkeley Contractor Guides

In-depth resources for contractors working in Berkeley

2026-03-24

How Smart Contractors Use Building Permits to Find $100K+ Projects

Every year, billions of dollars in construction work are filed through building permits across the United States. Property owners are planni...

Read guide →
2026-03-15

How to Find Construction Leads in 2026: A Data-Driven Approach

How to Find Construction Leads in 2026: A Data-Driven Approach Every contractor needs a pipeline of new work. The question isn't whether you...

Read guide →
2026-03-10

What Is a Building Permit? A Contractor's Guide to Using Permit Data

What Is a Building Permit? A Contractor's Guide to Using Permit Data If you work in construction, you know building permits are part of the ...

Read guide →
Nearby New Jersey Cities — explore building permits in other New Jersey cities

Turn Berkeley permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. 14-day trial for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Berkeley Building Permits

How many building permits does PermitGrab track in Berkeley?

PermitGrab currently tracks 100 building permits in Berkeley, New Jersey. Data is pulled directly from the official municipal open-data source on every collection cycle and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Berkeley permit data?

PermitGrab collects Berkeley on every daemon cycle. Its municipal source is currently updated multiple times per week, so new permits appear here within 1–3 days of the source publishing them. The count above reflects the complete current record from that source.

How can contractors find construction leads in Berkeley?

Contractors find leads in Berkeley by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Berkeley — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Berkeley permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Code violations in Berkeley = motivated sellers. Out-of-state landlord + active citation = top of the wholesale call list.
Contractors & subs
Every Berkeley GC who pulled a permit this week is sourcing labor and materials right now. Phone numbers included.
Home service companies
A Berkeley addition or remodel signals an HVAC, plumbing, or warranty upsell window. Reach owners while the project is fresh.
Solar installers
Roof permits and electrical upgrades in Berkeley are the highest-intent solar lead signals. Owner-occupant filter built in.
Insurance agents
Berkeley renovations trigger updated dwelling-coverage limits. Get the address-level signal before the renewal cycle does.
Material suppliers
Lumber, drywall, roofing, fixtures — every Berkeley permit is a parts list. Build a route by job type and value tier.
Developers & new construction
Ground-up builds in Berkeley mean a long runway of subcontractor and material orders. Sort new-construction permits by project value and reach the GC before the trades are locked.
Free resources

More on Berkeley & U.S. construction activity

U.S. Construction Permit Pulse
Our 90-day data report: permit volume by metro, hottest trades, and average project values. Free to read and cite.
Free permit tools
Live permit checker, national pulse dashboard, and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients you track live Berkeley permit activity — copy one line of HTML for your website.
Start 14-Day Trial →
14-day
14-day trial