Spokane Building Permits & Contractor Leads

Live municipal building-permit feed for Spokane, Washington.

PermitGrab tracks 0 active contractors who pulled 2,942 building permits in Spokane, WA. Updated daily.

PermitGrab is a $149/mo subscription that surfaces every Spokane building permit, contractor record, and code violation from the official municipal feed within 12-24 hours of filing — used by solar installers, roofers, HVAC contractors, real-estate investors, and insurance restoration teams to acquire leads at the moment a homeowner commits to a project. 14-day free trial below — cancel anytime in one click.

Filter Spokane leads by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

2,942
Indexed Permits
0
Active Contractors
22
Property Owners
Updated recently · 2026-06-08
📊 View Spokane live permit pulse →
Spokane had 2238 new building permits filed in the last 30 days, led by 563 plumbing, 556 electrical and 478 hvac.

🔔 Get Daily Spokane Permit Alerts

New permits, violations, and contractor activity delivered to your inbox.

📥 Export CSV 📊 Report

All permits

2,942 records — permits and code violations sorted by date

Date Type Value Address Details Contractor / Status Save
2026-05-29 General Construction 3843 S WALDEN ST New SFR - One family house detached
2026-05-29 Fence 1637 E ROCKWELL AVE New Residential Fence - Contractor
2026-05-29 General Construction 5303 N WALL ST New Residential Deck - Owner/Builder
2026-05-29 Plumbing 6108 N STEVENS ST CREATED AS PART OF Z25-712BLA 06/02 - 06/04 Alley closure for water and sewer connections - DIG
2026-05-29 Electrical 4805 W FRANCIS AVE Electric Permit- Residential Addition & Alteration- Bleam Residence- Owner-Build…
2026-05-29 HVAC/Mech 2714 N MAYFAIR ST WSDOT Repipe
2026-05-29 Roofing 3314 E CLEVELAND AVE Reroof Jared Prevost Residential House
2026-05-29 HVAC/Mech 5024 N ADAMS ST Furnace swap out and AC Add On
2026-05-29 HVAC/Mech 5017 N LACEY ST Replaced the gas furnace
2026-05-29 Roofing 5732 N C ST Replace/Install Windows Carol Johnson Residential House
2026-05-29 HVAC/Mech 1604 E GORDON AVE Christina Cotter
2026-05-29 Electrical 7730 N PANORAMA DR EV Charger Circuit
2026-05-29 HVAC/Mech 204 E ASTOR DR Black
2026-05-29 HVAC/Mech 10402 N JACQUELINE LN Doris Fankhauser
2026-05-29 Electrical 3228 W RIVERVIEW DR Elec for mini split and subpanel
2026-05-29 HVAC/Mech 4805 W FRANCIS AVE Mechanical Permit- Residential Addition & Alteration- Bleam Residence- Owner-Bui…
2026-05-29 Roofing 3708 N C ST Replace/Install Windows Kat Shultis Residential House
2026-05-29 HVAC/Mech 7716 N DAKOTA ST Allen install
2026-05-29 Roofing 1520 E DECATUR AVE Reroof Residential House
2026-05-29 Roofing 628 S COWLEY ST Stars gas piping to new roof top units
2026-05-29 Electrical 1604 E GORDON AVE circuit to AC
2026-05-29 Electrical 1906 N ASH ST led upgrade
2026-05-29 Plumbing 1117 E GORDON AVE Sewer repair/relay
2026-05-29 HVAC/Mech 3928 S SHERMAN ST Frager
2026-05-29 Electrical 4714 E TRENT AVE Replace circuit for conveyor motor
Page 33 of 118 ← Prev 1 2 32 33 34 117 118 Next →

No contractor lead data available for Spokane. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Spokane
Construction Activity in Spokane

New building permits in Spokane, Washington indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Spokane Building Permits

Spokane, Washington processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 2942+ Spokane building permits — updated daily from official city sources.

Every new construction project in Spokane requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Spokane.

How Contractors Use Spokane Permit Data

HVAC contractors, electricians, plumbers, and roofers in Spokane use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Spokane building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Spokane electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Reviewed by Marcus Reeves · Page data current as of · Sources: official Spokane open data portal.

Who pulled permits in Spokane this week?

PermitGrab tracks 0 active contractors in Spokane, with new permit filings indexed from the city's open data portal on every refresh.

How fresh is Spokane permit data?

Updated daily. Permit records carry filing date, address, project value, contractor name (where the source publishes it), and permit type, so a fresh row means a fresh lead.

What construction is happening in Spokane right now?

In the last 30 days, Spokane permitting activity covers 2,238 new building permits. The mix spans new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, and tenant improvements — every record is a buying signal for a different contractor or supplier persona.

Spokane Contractor Guides

In-depth resources for contractors working in Spokane

2026-03-25

Spokane Building Permits: Your Complete Guide to Washington's Inland Empire Growth Market

Spokane is Washington's largest inland city and home to one of the Pacific Northwest's most underrated construction markets. While Seattle a...

Read guide →
Nearby Washington Cities — explore building permits in other Washington cities

Turn Spokane permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. 14-day trial for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Who’s Building in Spokane?

Property owners with active permits or flagged parcels. Great leads for solar, insurance, home-warranty, and renovation vendors.

Property Address Owner Source
1501 20TH ST NW C/O*** County assessor
1501 20TH ST NW C/O*** County assessor
1501 20TH ST NW C/O*** County assessor
1501 20TH ST NW C/O*** County assessor
1501 20TH ST NW C/O*** County assessor

5+ more property owners

Unlock full address and owner details, including mailing addresses for direct outreach. 14-day trial.

Start 14-Day Trial

Frequently Asked Questions about Spokane Building Permits

How many building permits does PermitGrab track in Spokane?

PermitGrab currently tracks 2942 building permits in Spokane, Washington. Data is pulled directly from the official municipal open-data source on every collection cycle and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Spokane permit data?

PermitGrab collects Spokane on every daemon cycle. Its municipal source is currently updated daily, so new permits appear here within 1–3 days of the source publishing them. The count above reflects the complete current record from that source.

How can contractors find construction leads in Spokane?

Contractors find leads in Spokane by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Spokane — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Spokane permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Code violations in Spokane = motivated sellers. Out-of-state landlord + active citation = top of the wholesale call list.
Contractors & subs
Every Spokane GC who pulled a permit this week is sourcing labor and materials right now. Phone numbers included.
Home service companies
A Spokane addition or remodel signals an HVAC, plumbing, or warranty upsell window. Reach owners while the project is fresh.
Solar installers
Roof permits and electrical upgrades in Spokane are the highest-intent solar lead signals. Owner-occupant filter built in.
Insurance agents
Spokane renovations trigger updated dwelling-coverage limits. Get the address-level signal before the renewal cycle does.
Material suppliers
Lumber, drywall, roofing, fixtures — every Spokane permit is a parts list. Build a route by job type and value tier.
Developers & new construction
Ground-up builds in Spokane mean a long runway of subcontractor and material orders. Sort new-construction permits by project value and reach the GC before the trades are locked.
Free resources

More on Spokane & U.S. construction activity

U.S. Construction Permit Pulse
Our 90-day data report: permit volume by metro, hottest trades, and average project values. Free to read and cite.
Free permit tools
Live permit checker, national pulse dashboard, and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients you track live Spokane permit activity — copy one line of HTML for your website.
Start 14-Day Trial →
14-day
14-day trial