Mobile Building Permits & Property Data

455 indexed permits · 10 property owners · Mobile, Alabama.

Not shared leads. Not a marketplace. Every record is a public permit filing you can verify yourself — your competitors aren't handed the same list. One closed job typically covers the whole year. Cancel anytime in one click — no retention call.

PermitGrab tracks 455 building permits in Mobile, AL, with 10 property-owner records matched to permit addresses. Updated daily.

PermitGrab is a $149/mo subscription that surfaces every Mobile building permit, contractor record, and code violation from the official municipal feed within 12-24 hours of filing — used by solar installers, roofers, HVAC contractors, real-estate investors, and insurance restoration teams to acquire leads at the moment a homeowner commits to a project. 14-day free trial below — cancel anytime in one click.

Filter Mobile leads by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

455
Indexed Permits
0
Active Contractors
52,638
Property Owners
Updated today · live from city records
📊 View Mobile live permit pulse →
Mobile had 410 new building permits filed in the last 30 days, led by 106 electrical, 71 general construction and 66 hvac.

🔔 Get Daily Mobile Permit Alerts

New permits, violations, and contractor activity delivered to your inbox.

📥 Export CSV 📊 Report

All permits

🔎 See for yourself — free: click any Reveal button to unmask up to 10 real contractor phone numbers. No account needed.

455 records — permits and code violations sorted by date

Date Type Value Address Details Contractor / Status Save
2026-05-27 HVAC/Mech 3925 WOODMONT DR MOBILE AL 36693 MEC Change-Out
2026-05-27 General Construction 7350 BRIDGEWOOD CT MOBILE AL 36695 Engineering - SFRA (Residential)
2026-05-26 Electrical 5713 DELROSE DR MOBILE AL 36609 ELE-Generator
2026-05-26 Signage 8990 COTTAGE HILL RD MOBILE AL 36695 Illuminated Sign
2026-05-26 Signage 8990 COTTAGE HILL RD MOBILE AL 36695 Illuminated Sign
2026-05-26 Signage 8990 COTTAGE HILL RD MOBILE AL 36695 Illuminated Sign
2026-05-26 General Construction 2551 GILL RD MOBILE AL 36605 Engineering - SFRA (Residential)
2026-05-26 General Construction 7665 HOWELLS FERRY RD MOBILE AL 36608 FIRE 2021 Alarm System Install
2026-05-26 General Construction 35 SCHILLINGER RD N MOBILE AL 36608 FIRE 2021 Alarm Control Panel
2026-05-26 General Construction 5920 GRELOT RD Unit: A MOBILE AL 36609 ROW - Fiber Optic Cable - Minor
2026-05-22 General Construction 950 ADAMS ST MOBILE AL 36603 FIRE 2021 Underground Fire Water Supply
2026-05-21 HVAC/Mech 3228 BROWN RD MOBILE AL 36605 MEC Change-Out
2026-05-21 Signage 4693 AIRPORT BLVD Unit: 130 MOBILE AL 36608 Illuminated Sign
2026-05-21 General Construction 1550 CRESTVIEW DR MOBILE AL 36693 BLD Renovations-No Plans
2026-05-21 Signage 4693 AIRPORT BLVD Unit: 130 MOBILE AL 36608 Illuminated Sign
2026-05-21 HVAC/Mech 1701 CHURCH ST MOBILE AL 36604 MEC Change-Out
2026-05-21 General Construction 1700 PRINCESS HELEN RD W MOBILE AL 36618 ROW - Fiber Optic Cable - Minor
2026-05-21 Roofing 1313 DAUPHIN ST Unit: B MOBILE AL 36604 BLD Re-Roof
2026-05-20 HVAC/Mech 3251 OLD SHELL RD MOBILE AL 36607 MEC Change-Out
2026-05-20 General Construction 1804 SOUTHAMPTON WAY MOBILE AL 36618 BLD Repair
2026-05-20 General Construction 307 N JACKSON ST MOBILE AL 36603 ROW - Residential Driveway / Sidewalk
2026-05-20 Fire Protection 251 ST LOUIS ST Unit: A MOBILE AL 36602 FIRE 2021 Sprinkler System Install
2026-05-19 Fence 328 SPRINGHILL WOODS DR E MOBILE AL 36608 Fence
2026-05-19 Roofing 4072 SPRINGDALE RD MOBILE AL 36609 BLD Re-Roof
2026-05-18 General Construction 7212 HAWKINS MANOR MOBILE AL 36695 Engineering - SFRA (Residential)
Page 16 of 19 ← Prev 1 2 15 16 17 18 19 Next →

No contractor lead data available for Mobile. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Mobile
Construction Activity in Mobile

New building permits in Mobile, Alabama indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Mobile Building Permits

Mobile, Alabama processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 455+ Mobile building permits — updated daily from official city sources.

Every new construction project in Mobile requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Mobile.

How Contractors Use Mobile Permit Data

HVAC contractors, electricians, plumbers, and roofers in Mobile use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Mobile building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Mobile electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Reviewed by Marcus Reeves · Page data current as of · Sources: official Mobile open data portal.

Who pulled permits in Mobile this week?

PermitGrab indexes 455 building permits in Mobile, with new filings from the city's permit feed on every refresh. Each permit is matched against 10 property-owner records for direct outreach.

How fresh is Mobile permit data?

Updated daily. Permit records carry filing date, address, project value, contractor name (where the source publishes it), and permit type, so a fresh row means a fresh lead.

What construction is happening in Mobile right now?

In the last 30 days, Mobile permitting activity covers 410 new building permits. The mix spans new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, and tenant improvements — every record is a buying signal for a different contractor or supplier persona.

Three plays that win in Mobile

Lists are for mailing. Phones are for closing.

📞

The same-day call

Filter Mobile to your trade each morning. Every fresh permit shows the contractor with a verified phone — call the GC to sub, call the owner to upsell the next phase, while competitors are still printing postcards.

🕵️

The competitor watch

Search any competitor's name and see every job they pulled in Mobile — where they're working, what they're charging the city in declared value, and which neighborhoods they own. Pitch the follow-on work at each address.

🚨

The motivated-seller list

Code violations matched to property owners. An owner facing a citation is the warmest restoration, repair, or wholesale-offer lead there is — and no marketplace sells this list.

Run these plays in Mobile — $149/mo

Mobile Contractor Guides

In-depth resources for contractors working in Mobile

2026-03-24

How Smart Contractors Use Building Permits to Find $100K+ Projects

Every year, billions of dollars in construction work are filed through building permits across the United States. Property owners are planni...

Read guide →
2026-03-15

How to Find Construction Leads in 2026: A Data-Driven Approach

How to Find Construction Leads in 2026: A Data-Driven Approach Every contractor needs a pipeline of new work. The question isn't whether you...

Read guide →
2026-03-10

What Is a Building Permit? A Contractor's Guide to Using Permit Data

What Is a Building Permit? A Contractor's Guide to Using Permit Data If you work in construction, you know building permits are part of the ...

Read guide →
Nearby Alabama Cities — explore building permits in other Alabama cities

Turn Mobile permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. 14-day trial for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Who’s Building in Mobile?

Property owners with active permits or flagged parcels — with absentee-owner and portfolio-size intel. Great leads for solar, insurance, home-warranty, and renovation vendors.

Property Address Owner Owner Intel Source
WILLIAMS CREEK MAS*** 16 properties County assessor
AIRPORT RD WIL*** County assessor
5475 TIMBERLANE DR MAS*** County assessor
440 WILLIAMS ST MAR*** County assessor
2800 BERKLEY AVE BOA*** 12 properties County assessor

5+ more property owners

Unlock full address and owner details, including mailing addresses for direct outreach. 14-day trial.

Start 14-Day Trial

Frequently Asked Questions about Mobile Building Permits

How many building permits does PermitGrab track in Mobile?

PermitGrab currently tracks 455 building permits in Mobile, Alabama. Data is pulled directly from the official municipal open-data source on every collection cycle and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Mobile permit data?

PermitGrab collects Mobile on every daemon cycle. Its municipal source is currently updated daily, so new permits appear here within 1–3 days of the source publishing them. The count above reflects the complete current record from that source.

How can contractors find construction leads in Mobile?

Contractors find leads in Mobile by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Mobile — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Mobile permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Code violations in Mobile = motivated sellers. Out-of-state landlord + active citation = top of the wholesale call list.
Contractors & subs
Every Mobile GC who pulled a permit this week is sourcing labor and materials right now. Phone numbers included.
Home service companies
A Mobile addition or remodel signals an HVAC, plumbing, or warranty upsell window. Reach owners while the project is fresh.
Solar installers
Roof permits and electrical upgrades in Mobile are the highest-intent solar lead signals. Owner-occupant filter built in.
Insurance agents
Mobile renovations trigger updated dwelling-coverage limits. Get the address-level signal before the renewal cycle does.
Material suppliers
Lumber, drywall, roofing, fixtures — every Mobile permit is a parts list. Build a route by job type and value tier.
Developers & new construction
Ground-up builds in Mobile mean a long runway of subcontractor and material orders. Sort new-construction permits by project value and reach the GC before the trades are locked.
Free resources

More on Mobile & U.S. construction activity

U.S. Construction Permit Pulse
Our 90-day data report: permit volume by metro, hottest trades, and average project values. Free to read and cite.
Free permit tools
Live permit checker, national pulse dashboard, and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients you track live Mobile permit activity — copy one line of HTML for your website.
Start 14-Day Trial →
14-day
14-day trial