Silver Spring Building Permits & Property Data

2,903 historical permit records through 2026-10-28 · Silver Spring, Maryland.

PermitGrab Pro is a $149/mo subscription. 14-day Pro trial — choose your market first, then card required at checkout · cancel anytime before day 14.

2,903 building-permit records on file for Silver Spring, MD through 2026-10-28.

⚠ Older record dates

Newest permit date:

2,903
Indexed Permits
2026-10-31
Last source check
Source date: 2026-10-28 · newer records are not currently available

🔔 Get Silver Spring Permit Alerts

New permits and property activity sent when new public records are available.

📥 Export CSV 📊 Report

Published permit & code records

Permit data through 2026-10-28

2,903 permits sorted by date

Project value is blank on every record displayed here, so the Value column is omitted.

⇄ Swipe or scroll to see address & contractor

Date Type Address Details Contractor / Status Save
2026-02-09 Solar 2405
Owner: WIL··· 🔒
Customer Wants To Use ePlans,TEMPORARY REMOVAL AND REINSTALLATION OF 80 EXISTING… solar Solar PV —
2026-02-09 Interior Renovation 3133
Owner: NEA··· 🔒
New wall constructed across room, two doors added, Install drywall and baseboard… —
2026-02-07 Solar 1616
Owner: FAS··· 🔒
Customer Wants To Use ePlans,Installation of 27 roof mounted solar panels. solar Solar PV —
2026-02-07 Solar 1208
Owner: LAM··· 🔒
Customer Wants To Use ePlans,Installation of 24 roof mounted solar panels. solar Solar PV —
2026-02-07 Solar 1929
Owner: ROA··· 🔒
Customer Wants To Use ePlans,Installation of 40 roof mounted solar panels 15.6 k… 15.6 kW solar Solar PV —
2026-02-06 Solar 14721
Owner: CAL··· 🔒
Customer Wants To Use ePlans,Installation of roof-mounted solar panels, This is … solar Solar PV —
2026-02-06 Solar 413
Owner: BEG··· 🔒
Customer Wants To Use ePlans,INSTALL (18) ROOF-MOUNTED SOLAR PANELS FOR 7.38 KW 7.38 kW solar Solar PV —
2026-02-05 Interior Renovation 10103
Owner: ALE··· 🔒
New Second Floor Addition on existing Main Floor and extend in the Rear Interior… —
2026-02-05 HVAC 14907 REMOVE & REPLACE EX 16' X 16' OPEN DECK W/ STEPS. COMPOSITE & VINYL. SAME SIZE A… replacement HVAC replacement —
2026-02-05 Solar 11821
Owner: WAT··· 🔒
Customer Wants To Use ePlans,27 Roof mounted solar panels with energy storage battery solar Battery storage —
2026-02-05 Structural 16710
Owner: CLE··· 🔒
INTERIOR ALTERATIONS IN BASEMENT TO CREATE NEW STORAGE AND MECH ROOM. CREATE AN … —
2026-02-05 Roofing 10706
Owner: MIN··· 🔒
Screening in exist deck w/ 2ft extension, w/ new roof and upper deck above., New… 409 sq 409 roof sf New installation New roof —
2026-02-04 HVAC 2209
Owner: CLE··· 🔒
Installation of (6) SmartJack Floor Supports Replace (Triple 2 x 10) Girder Sist… replacement HVAC replacement —
2026-02-04 HVAC 813
Owner: CLE··· 🔒
Revision 1 - Increasing shed size from 10x12 to 12x12 and moving shed location 5… New installation HVAC installation —
2026-02-04 HVAC 1019
Owner: SHO··· 🔒
Deck Resurface,Repair Existing Deck HVAC repair —
2026-02-04 Structural 13504
Owner: 135··· 🔒
Installation of 7 Push Piers. —
2026-02-03 HVAC 303
Owner: PEH··· 🔒
Revision 1146122 - Scope of work to remain the same. Address change to 303 Leigh… replacement HVAC replacement —
2026-02-03 Interior Renovation 10006
Owner: GRA··· 🔒
Second Story Addition, new stairs, First Floor bathroom renovation —
2026-02-03 Solar 12014
Owner: HAW··· 🔒
Customer Wants To Use ePlans,INSTALL (17) ROOF MOUNTED SOLAR PANELS, 7.31 KW 7.31 kW solar Solar PV —
2026-02-03 Interior Renovation 104
Owner: GRE··· 🔒
Interior work only,1st floor renovation only. Kitchen remodel. New electrical an… —
2026-02-02 HVAC 12049 Interior work only,Modification of an existing raised deck structure to accommod… New installation HVAC installation —
2026-02-02 HVAC 1358
Owner: TUC··· 🔒
Interior work only,underpinning construction of the crawlspace and repairs —
2026-02-02 Landscaping & Exterior — Customer Wants To Use ePlans,Construct a new SFD with finished lower level, six … —
2026-02-02 Interior Renovation 9506 Remodel Interior, Kitchen —
2026-02-02 General Construction 1609
Owner: AYE··· 🔒
Customer Wants To Use ePlans,8x12 storage shed, not to be lived in of for commer… commercial —
2026-02-02 Interior Renovation 9501
Owner: TAT··· 🔒
Add garage & screen porch, expand 2nd floor bedroom, interior alteration/renovat… —
2026-02-02 Electrical 14609
Owner: BBO··· 🔒
Customer Wants To Use ePlans Interior work only,Second-floor remodel with select… —
2026-02-02 Solar 1509
Owner: POL··· 🔒
Temporary removal and reinstallation of 43 existing roof-mounted solar panels. solar Solar PV —
2026-02-02 Solar 3609
Owner: THO··· 🔒
Customer Wants To Use ePlans,INSTALL (14) ROOF MOUNTED SOLAR PANELS, 6.02 KW 6.02 kW solar Solar PV —
2026-02-01 Solar 15044 Customer Wants To Use ePlans,Installation of a new, roof-mounted Solar photovolt… 12.76 kW solar Solar PV —
2026-02-01 Solar 2001
Owner: SOU··· 🔒
Customer Wants To Use ePlans,Installation of a new, roof-mounted Solar photovolt… 5.28 kW solar Solar PV —
2026-01-30 Solar 1202
Owner: RAJ··· 🔒
Customer Wants To Use ePlans,INSTALL (25) ROOF MOUNTED SOLAR PANELS, 10.75 KW 10.75 kW solar Solar PV —
2026-01-30 HVAC 414
Owner: ZIF··· 🔒
Two story frame addition with bedroom suites on each level, plus screened porch … —
2026-01-30 Landscaping & Exterior 16919
Owner: TRI··· 🔒
Seeking to build a 490sf rectangular deck with a estimated cost of 40,000$.,New … —
2026-01-30 Solar — Revision 1 - SWITCHED MODULES AND RACKING TO SEG-440 AND DELTA,Customer Wants To… 5.28 kW solar Solar PV —
2026-01-30 Solar 14718
Owner: RAD··· 🔒
Customer Wants To Use ePlans,INSTALL (56) ROOF MOUNTED SOLAR PANELS, 22.96 KW 22.96 kW solar Solar PV —
2026-01-30 HVAC —  Interior work only,We are doing a bathroom renovation, keeping same layout… —
2026-01-29 Solar 1719
Owner: EAS··· 🔒
Revision 1120568 - The panels count is decreasing from 27 panels to 23 panels on… 27 panels solar Solar PV —
2026-01-29 HVAC 1717
Owner: GUR··· 🔒
Attached structure with post and beam barn structure. —
2026-01-29 Landscaping & Exterior 1404
Owner: GOO··· 🔒
New Deck Installation. � Size: Approximate 320 sq.ft with 4' wide stairs. � 2.8'… —
2026-01-29 Landscaping & Exterior 9206
Owner: WAL··· 🔒
Customer Wants To Use ePlans,Screen porch addition with attached frame deck196 P… —
2026-01-29 Solar 10207 Customer Wants To Use ePlans,INSTALL (19) ROOF MOUNTED SOLAR PANELS, 8.36 KW 8.36 kW solar Solar PV —
2026-01-29 Structural 305
Owner: LEG··· 🔒
Installation of 3 Push Piers. —
2026-01-29 HVAC 15708
Owner: STI··· 🔒
Interior work only, To change current window to 5 sq ft egress window , This is … —
2026-01-28 Structural 1610
Owner: ROS··· 🔒
Remove old wood retaining wall and build new one on the same location with the s… —
2026-01-28 Landscaping & Exterior 508
Owner: HAU··· 🔒
ADU addition over existing garage, with new home office space., This is an Acces… residential New construction —
2026-01-28 General Construction 11403
Owner: MAR··· 🔒
12'x8' shed to be built at rear of property. ,New Shed —
2026-01-28 Interior Renovation 701
Owner: BUR··· 🔒
BUILD 2' EXTENSION OFF REAR OF EXISTING SFD. REMOVE INTERIOR WALLS & COMBINE KIT… —
2026-01-28 Solar 803
Owner: STE··· 🔒
Customer Wants To Use ePlans,INSTALL (36) ROOF MOUNTED SOLAR PANELS, 15.84 KW 15.84 kW solar Solar PV —
2026-01-28 Solar 2416
Owner: THA··· 🔒
Revision 1 - Changing Panels to SEG440 and Racking to Top Speed to Delta SnapNRa… 7.92 kW solar Solar PV —
Page 52 of 59 ← Prev 1 2 … 51 52 53 58 59 Next →

Historical Silver Spring permit records

The records in the table are available through 2026-10-28. They are useful for historical research; newer records are not currently available in this feed.

Nearby Maryland Cities — explore building permits in other Maryland cities

More Maryland permit data

Baltimore permits Anne Arundel County permits Montgomery County permits Bethesda permits Rockville permits Gaithersburg permits Potomac permits Germantown permits Chevy Chase permits Montgomery Village permits

Comparing permit-data tools? See BuildZoom vs Shovels vs PermitGrab (2026) — how to compare market coverage, source freshness, and available record fields.

Choose your market →
Then finish
setup