Silver Spring Building Permits & Contractor Leads

Live municipal building-permit feed for Silver Spring, Maryland.

PermitGrab tracks 0 active contractors who pulled 1,168 building permits in Silver Spring, MD as of 2026-06-09. Updated periodically.

Up to date · Updated daily • newest record from 2d ago

PermitGrab is a $149/mo subscription that surfaces every Silver Spring building permit, contractor record, and code violation from the official municipal feed within 12-24 hours of filing — used by solar installers, roofers, HVAC contractors, real-estate investors, and insurance restoration teams to acquire leads at the moment a homeowner commits to a project. 14-day free trial below — cancel anytime in one click.

Filter Silver Spring leads by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

1,168
Indexed Permits
0
Active Contractors
2026-06-09
Last Updated
Updated recently · 2026-06-08
📊 View Silver Spring live permit pulse →
Silver Spring had 247 new building permits filed in the last 30 days, led by 126 electrical, 42 hvac and 31 solar.

🔔 Get Daily Silver Spring Permit Alerts

New permits, violations, and contractor activity delivered to your inbox.

📥 Export CSV 📊 Report

All permits

1,168 records — permits and code violations sorted by date

Date Type Value Address Details Contractor / Status Save
2026-01-17 Solar 10702 Revision 1 - Installation of 24 roof mounted solar panels. ,Customer Wants To Us…
2026-01-16 General Construction 1704 Customer Wants To Use ePlans,Build 2 level deck,New Deck
2026-01-16 Solar 11668 Customer Wants To Use ePlans,Installation of a new, roof-mounted Solar photovolt…
2026-01-16 Solar 2001 Customer Wants To Use ePlans,INSTALL (13) ROOF MOUNTED SOLAR PANELS, 5.72 KW
2026-01-16 Roofing 12214 Constructing new deck new roof area 312
2026-01-15 General Construction 2002 Installation of 3 IntelliJacks, and 18 LNFT Supplemental S4 Beam.
2026-01-15 General Construction 2313 Installation of a pre fab 8x8 storage shed in backyard,New Shed
2026-01-15 Solar 13124 Customer Wants To Use ePlans,Installation of 28 solar panels mounted and flush w…
2026-01-14 Solar 14305 Customer Wants To Use ePlans,Install 6kw (15 panels) roof mounted solar PV syste…
2026-01-14 Demolition 9115 Customer Wants To Use ePlans Interior work only,SCOPE OF WORK INCLUDES MINOR DEM…
2026-01-14 Demolition 1520 REPLACEMENT EXISTING WOOD RETAINING WALL BY CMU RETAINING WALL. AT ANY POINT, TH…
2026-01-14 Solar 1116 Customer Wants To Use ePlans,Installation of 59 roof mounted solar panels with e…
2026-01-13 General Construction 810 Replacing the existing 10 x 20 deck with stairs to grade on the rear of the home…
2026-01-13 HVAC/Mech 810 Interior work only, Replace in kind all mechanical electrical plumbing, drywall,…
2026-01-13 General Construction 1420 Build a deck of 16x12 with landing staircase.,New Deck
2026-01-12 General Construction 1304 Customer Wants To Use ePlans,Basement and first-floor addition including new&nbs…
2026-01-09 General Construction 10602 Customer Wants To Use ePlans,Install an 8x10 storage shed, not to be lived in or…
2026-01-09 Solar 511 Customer Wants To Use ePlans,TEMPORARY REMOVAL AND REINSTALLATION OF 43 EXISTING…
2026-01-08 Solar 410 Customer Wants To Use ePlans,INSTALL (20) ROOF MOUNTED SOLAR PANELS, 8.10 KW
2026-01-07 General Construction 2806 We are requesting for permit to be given for the front porch to be modified to g…
2026-01-07 General Construction 16430 Tearing down the screen porch. Rebuilding a family room on exact same footprint.
2026-01-07 Roofing 10124 TO RENOVATE AN EXISTIGN GARAGE TO CHANGE THE ROOF (SAME DIMENSIONS AND PITCH) AN…
2026-01-07 General Construction 4000 build new deck in back of the house 14.5'x15', DECK DETAILSDECK- 217CUSTOMER HAD…
2026-01-07 Solar 14000 Customer Wants To Use ePlans,Rooftop Mounted PV Solar Energy System � System Siz…
2026-01-07 General Construction 1518 Kitchen renovation, add small 12 x 12 pantry, converting garage into a gym.add-1…
2026-01-06 General Construction 3015 New 10' x 10' shed that is 9'7""Tall
2026-01-06 Solar 9316 Customer Wants To Use ePlans,Installation of a 3.28 kW roof mounted solar system…
2026-01-06 General Construction 13211 Apply for a new deck, 500 sf, adjacent to the house, on the back side of the lot…
2026-01-06 Roofing 10606 REPAIR FRAMING DAMAGE ON SCREEN PORCH ROOF AND MAIN ROOF FROM TREE FALL. MAIN RO…
2026-01-06 Solar 2608 Revision 0000 - Installation of a new, roof-mounted Solar photovoltaic electric …
2026-01-06 Solar 506 Customer Wants To Use ePlans,Installation of a new, roof-mounted Solar photovolt…
2026-01-06 Solar 1511 Customer Wants To Use ePlans,Installation of 17.6kw (40) roof-mounted solar modu…
2026-01-05 Solar 11420 Customer Wants To Use ePlans,Install (37) Roof Mounted Solar Panels. System Size…
2026-01-02 General Construction 10109  Interior work only,finish part of basement laundry room area
2025-12-31 Solar 1709 Customer Wants To Use ePlans,Solar Shingles: Residential Roof-Integrated PV/ Sys…
2025-12-31 Solar 2700 Revision 1 - Installation of 40 roof mounted solar panels. ,Customer Wants To Us…
2025-12-31 General Construction 16121 Revision 1 - Extend the deck 2 feet to the right,Customer Wants To Use ePlansCon…
2025-12-31 General Construction 266 New Deck, Size: 20ft x 16ft + 4ft x 5ft landing and L-shape stairs. Approximate …
2025-12-30 General Construction 1504 This is Final Only Permit application for the old permit 881044.
2025-12-30 Solar 11810 Customer Wants To Use ePlans,Temporary removal and reinstallation of 52 existing…
2025-12-30 Solar 1904 Customer Wants To Use ePlans,Temporary removal and reinstallation of 20 existing…
2025-12-30 Solar 12704 Customer Wants To Use ePlans,Temporary removal and reinstallation of 30 existing…
2025-12-30 General Construction 140 Adding a small addition on three sides of 1st floor of the rear of home
2025-12-29 Demolition 132 Demolishing old deck and building new wood/composite deck with hot tub area,New …
2025-12-29 General Construction 12408 Customer Wants To Use ePlans,Remove the existing rear upper and lower rear decks…
2025-12-26 Solar 1709 Revision 0000 - Installation of a new, roof-mounted Solar photovoltaic electric …
2025-12-26 Solar 816 Customer Wants To Use ePlans,Installation of a 9.43 kW roof mounted solar system…
2025-12-24 General Construction 13319  ""Build new 12x18 freestanding deck with trex decking and vinyl rail"" Fie…
2025-12-24 Solar 13814 Revision 1 - Reduce solar panel count. Install (24) Roof Mounted Solar Panels. S…
2025-12-24 Solar 708 Customer Wants To Use ePlans,Install (56) Roof Mounted Solar Panels. System Size…
Page 19 of 24 ← Prev 1 2 18 19 20 23 24 Next →

No contractor lead data available for Silver Spring. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Silver Spring
Construction Activity in Silver Spring

New building permits in Silver Spring, Maryland indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Silver Spring Building Permits

Silver Spring, Maryland processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 1168+ Silver Spring building permits — updated periodically from official city sources.

Every new construction project in Silver Spring requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Silver Spring.

How Contractors Use Silver Spring Permit Data

HVAC contractors, electricians, plumbers, and roofers in Silver Spring use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Silver Spring building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Silver Spring electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Reviewed by Marcus Reeves · Page data current as of · Sources: official Silver Spring open data portal.

Who pulled permits in Silver Spring this week?

PermitGrab tracks 0 active contractors in Silver Spring, with new permit filings indexed from the city's open data portal on every refresh.

How fresh is Silver Spring permit data?

The most recent permit indexed for Silver Spring is dated 2026-06-08. Updated daily • newest record from 2d ago. Permit records carry filing date, address, project value, contractor name (where the source publishes it), and permit type, so a fresh row means a fresh lead.

What construction is happening in Silver Spring right now?

In the last 30 days, Silver Spring permitting activity covers 247 new building permits. The mix spans new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, and tenant improvements — every record is a buying signal for a different contractor or supplier persona.

Nearby Maryland Cities — explore building permits in other Maryland cities

Turn Silver Spring permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. 14-day trial for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Silver Spring Building Permits

How many building permits does PermitGrab track in Silver Spring?

PermitGrab currently tracks 1168 building permits in Silver Spring, Maryland. Data is pulled directly from the official municipal open-data source on every collection cycle and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Silver Spring permit data?

PermitGrab collects Silver Spring on every daemon cycle. Its municipal source is currently updated periodically, so new permits appear here within 1–3 days of the source publishing them. The count above reflects the complete current record from that source.

How can contractors find construction leads in Silver Spring?

Contractors find leads in Silver Spring by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Silver Spring — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Silver Spring permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Code violations in Silver Spring = motivated sellers. Out-of-state landlord + active citation = top of the wholesale call list.
Contractors & subs
Every Silver Spring GC who pulled a permit this week is sourcing labor and materials right now. Phone numbers included.
Home service companies
A Silver Spring addition or remodel signals an HVAC, plumbing, or warranty upsell window. Reach owners while the project is fresh.
Solar installers
Roof permits and electrical upgrades in Silver Spring are the highest-intent solar lead signals. Owner-occupant filter built in.
Insurance agents
Silver Spring renovations trigger updated dwelling-coverage limits. Get the address-level signal before the renewal cycle does.
Material suppliers
Lumber, drywall, roofing, fixtures — every Silver Spring permit is a parts list. Build a route by job type and value tier.
Developers & new construction
Ground-up builds in Silver Spring mean a long runway of subcontractor and material orders. Sort new-construction permits by project value and reach the GC before the trades are locked.
Free resources

More on Silver Spring & U.S. construction activity

U.S. Construction Permit Pulse
Our 90-day data report: permit volume by metro, hottest trades, and average project values. Free to read and cite.
Free permit tools
Live permit checker, national pulse dashboard, and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients you track live Silver Spring permit activity — copy one line of HTML for your website.
Start 14-Day Trial →
14-day
14-day trial