Walnut Creek Building Permits & Property Data

Heads up: The current Walnut Creek records do not yet meet PermitGrab's source-published contractor coverage threshold. This page focuses on permit records and property data; market-level contractor data coverage isn't available for this city.

1,540 indexed permits · Walnut Creek, California.

PermitGrab Pro is a $149/mo subscription. 14-day Pro trial — choose your market first, then card required at checkout · cancel anytime before day 14.

Public-record project research, not a shared-lead marketplace. Use the permit, source date, and available fields to research the builder, project, or adjacent work before outreach. Cancel anytime in one click — no retention call.

Walnut Creek building permits — key stats
Newest permit 2026-09-14

PermitGrab tracks 1,540 building permits in Walnut Creek, CA as of 2026-09-14.

Recent record dates

Record recency is based on available filing or issue dates; it does not verify publication time or collection delay.

Newest permit date:

PermitGrab Pro is a $149/mo subscription for current municipal permit, property, and code-violation records. The current records do not meet the source-published contractor-coverage threshold. This page focuses on the permit and property signals it does publish. 14-day Pro trial below — choose your market first, then card required at checkout · cancel anytime before day 14.

Filter Walnut Creek permits by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

Free weekly permit summary for Walnut Creek

One email a week with the newest Walnut Creek building permits — addresses, project details, and property activity where available. Free summary only — no credit card. Pro research tools require a separate 14-day trial with a card. Available fields vary by source. Unsubscribe anytime.

1,540
Indexed Permits
Contractor count unavailable
Property Owners · count unavailable
2026-09-17
Last Updated
Updated recently · 2026-09-14

🔔 Get Walnut Creek Permit Alerts

New permits and property activity sent when new public records are available.

📥 Export CSV 📊 Report

Published permit & code records

Permit data through 2026-09-14
This city's permit source publishes no address or project-value fields — the contractor names and phones below are complete; address/value are shown as “—”.

1,540 permits sorted by date

Date Type Value Address Details Contractor / Status Save
2026-07-03 HVAC/Mech
Owner: GRE··· 🔒
installing 2 ton up flow gas system like for like 2 tons replacement ×2
2026-07-03 HVAC/Mech
Owner: GRE··· 🔒
installing 5 ton up flow gas system like for like 5 tons replacement ×2
2026-07-03 Plumbing
Owner: GRE··· 🔒
ONLINE - Water Heater Replacement standard replacement ×2
2026-07-02 HVAC/Mech
Owner: GRE··· 🔒
200-amp to 400-amp 2-meter main panel for 1859 AND 1859A, as shown in diagram/pl… 1859A
2026-07-02 Signage
Owner: GRE··· 🔒
Replace (2) Retrofit Windows in Bedroom. Same Size, Same Location. (Egress Met)
2026-07-02 Signage
Owner: GRE··· 🔒
kitchen bathroom windows deck
2026-07-02 Signage
Owner: GRE··· 🔒
Rot repair of balcony.
2026-07-02 Signage
Owner: GRE··· 🔒
replace glass doors in kitchen,dining room and master bedroom.
2026-07-02 Signage
Owner: GRE··· 🔒
Kitchen and bathroom remodeling. Removal of non-structural wall between the livi…
2026-07-02 Roofing
Owner: GRE··· 🔒
tear-off asphalt shgls install asphalt shgls shingle tear off replacement
2026-07-02 Signage
Owner: GRE··· 🔒
Installation of temporary power pole to be used in conjunction with B25138
2026-07-02 Signage
Owner: GRE··· 🔒
THESE DOCUMENTS ARE FOR PERMITTING THE DEMOLITION AND CONSTRUCTION OF REMODELED …
2026-07-02 Fire Protection
Owner: GRE··· 🔒
Commercial Express Review - Temporary installation of two (N) analyzer into the … fire alarm
2026-07-02 Signage
Owner: GRE··· 🔒
Building New Construction, Additions, Alterations or Sign ×2
2026-07-02 HVAC/Mech
Owner: GRE··· 🔒
2.5 Ton Upflow Heat Pump & Air Handler Replacement 2.5 tons heat pump replacement
2026-07-02 HVAC/Mech
Owner: GRE··· 🔒
Replace AC AC replacement ×2
2026-07-02 Signage
Owner: GRE··· 🔒
complete remodel = kitchen,bathroom, flooring,windows door replacement, front do…
2026-07-02 HVAC/Mech
Owner: GRE··· 🔒
Upgrading 100 AMP fuse panel to 200 AMP MSP, new service mast, new grounding, wh… New installation HVAC installation
2026-07-02 General Construction
Owner: GRE··· 🔒
2G
2026-07-01 Signage
Owner: GRE··· 🔒
Using existing light circuit install 8 can lights in the garage.
2026-07-01 HVAC/Mech
Owner: GRE··· 🔒
Replace 100A main breaker with 125A main breaker. The existing wire is big enoug… replacement
2026-07-01 Roofing
Owner: GRE··· 🔒
BLDG #2 - "THE PLAZA" - Remove existing Shingles on upper elevation and replace … shingle replacement
2026-07-01 General Construction
Owner: GRE··· 🔒
Estimate - Building ×3
2026-07-01 Signage
Owner: GRE··· 🔒
outside patio work
2026-07-01 Signage
Owner: GRE··· 🔒
Apartment: 101. Add a new washer and a ventless dryer, and install a dedicated c…
2026-07-01 Signage
Owner: GRE··· 🔒
Apartment: 224, Add a new washer and a ventless dryer, and install a dedicated c…
2026-07-01 Solar
Owner: GRE··· 🔒
ONLINE - Sub Panel Replacement 50A EV Charging Circuit w/DCC-12 for future elect… 50A replacement
2026-07-01 Structural
Owner: GRE··· 🔒
Added a pier
2026-07-01 Roofing
Owner: GRE··· 🔒
MULTI-FAMILY RE-ROOF - PHASE 2C - BLDG 4: units 1912, 1916 1920, 1924 & 1928 ASP… replacement
2026-07-01 Roofing
Owner: GRE··· 🔒
MULTI-FAMILY RE-ROOF - PHASE 2C - BLDG 3: units 1933 & 1937 ASPEN RIDGE COURT. replacement
2026-07-01 Roofing
Owner: GRE··· 🔒
BLDG 1 - Units 583, 585, 587 & 589 Monarch Ridge Dr. Complete removal of the exi… New installation New roof
2026-07-01 Signage
Owner: GRE··· 🔒
office TI. New partitions, conference rooms and offices.
2026-07-01 Roofing
Owner: GRE··· 🔒
MULTI-FAMILY RE-ROOF - PHASE 2C - BLDG 2: units 1913, 1915 1919, 1925 & 1929 ASP… replacement
2026-07-01 HVAC/Mech
Owner: GRE··· 🔒
installing 3 ton down flow system like for like 3 tons replacement
2026-07-01 HVAC/Mech
Owner: GRE··· 🔒
WATER HEATER CHANGE OUT LIKE FOR LIKE IN SAME LOCATION, 40 GAL - NAT GAS - IN CL… replacement
2026-07-01 Roofing
Owner: GRE··· 🔒
BLDG #3 "LIBERTY" - Remove existing shingles on upper elevation only and replace… shingle replacement
2026-07-01 Roofing
Owner: GRE··· 🔒
BLDG #1 - "THE HERITAGE" - Remove existing Shingles on upper elevation and repla… shingle replacement
2026-07-01 Roofing
Owner: GRE··· 🔒
MULTI-FAMILY RE-ROOF - PHASE 2C - BLDG 5: units 1900, 1906 & 1908 ASPEN RIDGE CO… replacement
2026-07-01 Solar
Owner: GRE··· 🔒
Install a new Presidential T/L Solaris Cool roof New installation New roof
2026-07-01 Solar
Owner: GRE··· 🔒
PV INSTALL 11.5KW, 10 MODULES, 1 ESS 11.5 kW 10 panels battery solar
2026-07-01 Roofing
Owner: GRE··· 🔒
BLDG #4 "FAIRMONT" - Remove existing shingles on upper elevation and replace wit… shingle replacement
2026-07-01 Fire Protection
Owner: GRE··· 🔒
Temporary installation of two (N) analyzer into the (E) vacant work area on the … fire alarm
2026-07-01 Signage
Owner: GRE··· 🔒
Remodel of primary bathroom and walk-in closet. Remove two windows in closet and…
Page 23 of 31 ← Prev 1 2 22 23 24 30 31 Next →
Permit Types in Walnut Creek
Construction Activity in Walnut Creek

New building permits in Walnut Creek, California show where construction activity is occurring. Filter the public records by trade, date, address, and project value to research active projects and property activity. Contractor lead coverage is not currently available for this city.

About Walnut Creek Building Permits

Walnut Creek, California processes building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 1540+ Walnut Creek building permits — newest permit date: 2026-09-16 from official city sources.

Each record can show the project address, scope, permit type, and value where the city publishes them. The source-published contractor records do not meet the coverage threshold for this city. PermitGrab does not represent this as contractor-contact coverage. Where property-owner records are available, they are matched to permit addresses separately.

How to use Walnut Creek permit data

Filter the current records by trade, date, address, or project value to research construction activity. The most useful workflow in this market is verifying the project signal first, then using the property data that is actually available for that address.

PermitGrab methodology · Page data current as of · Source: Building Permits via Accela (Walnut Creek CA, pop. 70k).

Who appears in Walnut Creek permit records?

PermitGrab indexes 1,540 building permits in Walnut Creek. New records appear as they are available from the source.

How fresh is Walnut Creek permit data?

The most recent permit indexed for Walnut Creek is dated 2026-09-14. Newest permit date: 2026-09-16. Permit records carry filing date, address, project value, and permit type, plus contractor name where the source publishes it. Use a recent published record for project research; it does not show bid availability or a request for service.

What construction appears in Walnut Creek permit records?

Walnut Creek permit activity covers 1,540 indexed permits. The records can cover new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, or tenant improvements. Their usefulness for a contractor or supplier depends on the published project details, timing, and service area.

How to look up Walnut Creek building permits

Search recent Walnut Creek, CA building permits by address, and permit type in the table above — pulled from the Walnut Creek building department's public permit records. New filings appear here as they are published. Filter by trade or search an address to look up a specific permit. For this week's filing volume, see the Walnut Creek Permit Pulse.

Nearby California Cities — explore building permits in other California cities

Monitor Walnut Creek permit & property activity

Email alerts when new public records are available for new permits and property activity. Source-published contractor coverage is not currently available for this city. Owner information is shown only where it can be matched from available public records.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Walnut Creek Building Permits

How many building permits does PermitGrab track in Walnut Creek?

PermitGrab currently tracks 1540 building permits in Walnut Creek, California. Data is pulled directly from the official municipal source on every collection cycle and includes permit number, address, permit type, status, estimated value, and contractor information where the source publishes it.

How fresh is the Walnut Creek permit data?

PermitGrab checks the official source on each collection cycle. The source date and its observed update cadence are shown above, so you can judge the data’s recency before acting on it.

How can contractors find construction leads in Walnut Creek?

Contractors can research Walnut Creek activity by filtering current permits by trade, location, and project type. Source-published contractor coverage is not currently available for this city. Property information is shown only where public records can be matched.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Walnut Creek — CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Source-published contractor coverage is not currently available for this city. Property information is available only where public records can be matched. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Walnut Creek permit data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Home service companies
An addition or remodel can be useful project context for HVAC, plumbing, or warranty outreach. Review the project signal before outreach.
Solar installers
Roof permits and electrical upgrades in Walnut Creek provide project context for solar-market research. Filter by the current project signal and verify ownership separately.
Insurance agents
Walnut Creek renovations can identify properties for a policy-review workflow. Confirm coverage needs independently before contacting a property owner.
Material suppliers & manufacturer reps
Choose a product-line research workflow, then use published job type, description, and value fields where available for territory and demand research. A permit is not a materials order, purchase signal, or open bid.
Developers & new construction
Sort source-published new-construction records by project value and type to research active projects and property activity.
Free resources

More on Walnut Creek & U.S. construction activity

Free permit tools
Permit lookup tools and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients Walnut Creek permit activity from public records — copy one line of HTML for your website.

More California permit data

Los Angeles permits Sacramento County permits San Jose permits Sacramento permits San Bernardino County permits San Francisco permits Santa Clara permits Oakland permits Santa Clara County permits Kern County permits

Comparing permit-data tools? See BuildZoom vs Shovels vs PermitGrab (2026) — how to compare market coverage, source freshness, and available record fields.

Choose your market →
Then finish
setup