This city's permit source publishes no address or project-value fields — the contractor names and phones below are complete; address/value are shown as “—”.
2,358
permits sorted by date
Date
Type
Value
Address
Details
Contractor / Status
Save
2026-06-04
General Construction
—
—
1,202 sf addition; (N) 715 sf covered porch; interior remodel
1,202 roof sfNew installation
—
2026-06-04
Demolition
—
—
DEMOLITION OF EXISTING ACCESSORY STRUCTURE
—
2026-06-04
Roofing
—
—
Re-roof, Tear off E wood shakes, install Class A rated underlayment and new meta…
metaltear offreplacement
—
2026-06-04
Fire Protection
—
—
New NFPA 13D, 2022 overhead fire sprinkler system
sprinkler
—
2026-06-04
Plumbing
—
—
Lot Line Adjustment Application APN 517-33-011 and 517-37-005
—
2026-06-02
General Construction
—
—
Convert existing 403 Sq ft garage to JADU.
403 roof sf
—
2026-06-02
Plumbing
—
—
INSTALLATION OF (2) 1,200 SF (MANUFACTORY BUILD ) HOUSES FOR FARM LABOR. CONSTRU…
line workNew installation
—
2026-06-02
Battery Storage
—
—
New 13.5 kWh Energy Storage System on existing single family dwelling.
—
2026-06-02
General Construction
—
—
498 sf addition to rear of existing SFR
498 roof sfNew installation
—
2026-06-01
General Construction
—
—
Plan check resubmission for bathroom remodel and home office partition wall
—
2026-05-29
Electrical
—
—
Hoover Tower 550 Jane Stanford Way replace existing elevator main line disconnec…
30Areplacement
—
2026-05-28
Plumbing
—
—
This is a deferred submittal for permit DEV25-3479 and includes the anchorage pa…
—
2026-05-28
Plumbing
—
—
ADDITION OF 523.69 SQ.FT. TO THE MAIN FLOOR CONVERT EXISTING RECREATION ROOM TO …
—
2026-05-28
Battery Storage
—
—
Install 27 kWH Energy Storage System (2 Batteries)
New installationNew roof
—
2026-05-28
Roofing
—
—
Interior remodel add (N) bathroom in (E) SFR footprint. Bathroom includes remova…
HIGHLAND CONSTRUCTION
2026-05-28
Fire Protection
—
—
SU Mitchell Sheller Lab Room A73
—
2026-05-28
Plumbing
—
—
SB 330 App for 2 lot Tentative Map with Cluster permit
—
2026-05-28
Demolition
—
—
APN 142-12-007, Address 91 Links Road, Stanford. Scope includes the selective d…
—
2026-05-28
General Construction
—
—
Convert garage to ADU to abate code violations
—
2026-05-28
Plumbing
—
—
Legalize 58 SF entry way addition, 87 SF bathroom & laundry addition, tankless w…
tanklessNew installation
—
2026-05-28
General Construction
—
—
1196 SQ FT detached ADU with attached garage
1,196 roof sf
—
2026-05-27
Demolition
—
—
The existing site includes a 5-bedroom, 3-bathroom Main House and a detached Sta…
—
2026-05-26
Plumbing
—
—
1. ADDITION OF A 498 SQFT IN THE BACKYARD OF THE HOUSE.
—
2026-05-26
Electrical
—
—
Kitchen renovation involving removal of a load bearing wall. Partial exterior si…
200Aservice panelreplacement
—
2026-05-24
Electrical
—
—
Interior remodel to install two non-load-bearing partition walls to create a new…
—
2026-05-23
Plumbing
—
—
Replace water heater following proper guidelines
standardreplacement
—
2026-05-22
General Construction
—
—
Fire Permit
—
2026-05-22
General Construction
—
—
REV - Updates to drawings to clarify phasing of work.
THE WHITING-TURNER CONTRACTING COMPANY
2026-05-22
HVAC/Mech
—
—
Replace furnace like for like 60k BTU 95% same location. Replace A/C like for li…
3 tons14 SEERAC, furnacereplacement
—
2026-05-21
General Construction
—
—
Transit Book
×20—
2026-05-21
Plumbing
—
—
attached 2 bedroom and 1 nathroom ADU at second floor
The records in the table are available through 2026-08-25. They are useful for historical research; newer records are not currently available in this feed.
Nearby California Cities — explore building permits in other California cities