2026-05-08
Windows/Doors
$3,000
1634 Palou
replacement window trim only; replace garage door trim only. in-kind replacement…
—
☆ Save
2026-05-08
General Construction
—
187 Beaver
please update scope of work & construction cost. thanks.
—
☆ Save
2026-05-08
Roofing
$8,000
965 Brussels
re-roofing: remove and replace roofing material / existing roofing material (in-…
replacement
—
☆ Save
2026-05-08
General Construction
$18,000
326 22nd
in-kind bathroom remodel, keep tub. removing and replacing (e) tiles for the bat…
—
☆ Save
2026-05-08
General Construction
$120,000
2056 14th
1/f: new 1/2 bathroom, laundry relocated, mech relocated. 2/f: remodel kitchen, …
—
☆ Save
2026-05-08
General Construction
—
620 El Camino Del Mar
to obtain final inspection for work approved under pa# 201811286824/ 20190329658…
—
☆ Save
2026-05-08
General Construction
—
360 Pine
to obtain final inspection for pa# 200812168621. all work is complete.
—
☆ Save
2026-05-08
General Construction
$10,561
2524 03rd
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).
—
☆ Save
2026-05-07
Solar
$10,000
3647 19th
solar permit: installing 24 solar pv modules, 440 watts per module, total no. of…
10.56 kW
16 kWh battery
battery
solar
—
☆ Save
2026-05-07
HVAC/Mech
—
3250 Van Ness
as-built fa in reference to pa# 202412187063. the intent of this project is a "v…
replacement
—
☆ Save
2026-05-07
Windows/Doors
—
1555 41st
revision to pa#202604038818(202412207275), remove unpermitted skylight
—
☆ Save
2026-05-07
Plumbing
$38,728
290 Avila
remove (e) brick in backyard. digout and prepare substrate 8-10" and grade, repl…
line work
replacement
—
☆ Save
2026-05-07
HVAC/Mech
$8,000
4179 26th
revision to pa 202508062456 replace approximately 165 lf of footing along west s…
replacement
—
☆ Save
2026-05-07
Structural
$16,000
65 Garnett
remodel (e) kitchen in-kind, no structural removal. replace 1 sink & kitchen cab…
—
☆ Save
2026-05-07
General Construction
$190,000
550 California
2/fl-ref 202603318646- meps
—
☆ Save
2026-05-07
General Construction
$30,000
1473 Palou
new adu to be added per planing code 207.2.
—
☆ Save
2026-05-07
General Construction
$110,000
77 Lapham
1/f: new bedroom, office, wet bar and bathroom. relocate mech and laundry rooms.…
—
☆ Save
2026-05-07
HVAC/Mech
$500,000
3400 Mission
installation of 2 10,000 g 87 usts and 1 8,000 g 91-gas doulble wall u5ts. insta…
New installation
HVAC installation
—
☆ Save
2026-05-07
Plumbing
$80,940
1400 Geary
15th floor/unit 1504, interior remodel replace plumbing fixtures, install shower…
replacement
—
☆ Save
2026-05-07
Solar
$54,555
830 Cortland
solar permit: installing 19 solar pv modules, 440 watts per module, total no. of…
8.36 kW
13.5 kWh battery
battery
solar
—
☆ Save
2026-05-07
Commercial Shell
$410,000
364 Divisadero
tenant improvement of existing gr fl and basement. retail paint store to a resta…
commercial
New construction
—
☆ Save
2026-05-07
Windows/Doors
$650,000
172 Landers
interior remodel to both units of an existing duplex . remodel existing kitchens…
—
☆ Save
2026-05-07
HVAC/Mech
$40,000
2180 Folsom
to comply with nov 202315320 to include mechanical equipment repalcment due to f…
—
☆ Save
2026-05-07
Windows/Doors
$45,000
40 Ceres
comply 2025-010489enf & 202545835: legalize as-built family room w/ wet bar, med…
—
☆ Save
2026-05-07
Windows/Doors
$200,000
600 Townsend
project consists of modification of two (e) door swings, relocation of exterior …
—
☆ Save
2026-05-07
Windows/Doors
$42,500
732 Brannan
renovation of exterior facade: refruburisment of one storefront door, removal of…
—
☆ Save
2026-05-07
Pool/Spa
$400,000
657 Arguello
horizontal addition and new 3rd flr expanision; expansion of conditined living s…
—
☆ Save
2026-05-07
Roofing
$34,000
1932 Bush
reroofing: slope roof. remove (e) asphalt shingles to the sheathing & install ne…
shingle
New installation
—
☆ Save
2026-05-07
General Construction
$12,500
1618 Mcallister
moving (e) dormers in the same position as plans
—
☆ Save
2026-05-07
Roofing
$15,000
126 Parnassus
reroofing torch down
—
☆ Save
2026-05-07
Solar
$16,000
30 Gilroy
solar permit: installing 11 solar pv modules, 415 watts per module, total no. of…
New installation
HVAC installation
—
☆ Save
2026-05-07
Roofing
$14,000
441 Brunswick
re-roofing: remove and replace roofing material / existing roofing material (in-…
replacement
—
☆ Save
2026-05-07
General Construction
—
899 Howard
renewal for expired permit #2023-0829-5472
—
☆ Save
2026-05-07
Demolition
$1,400,000
600 Townsend
demolition of (e) non-structural partitions, non rated interior doors, and millw…
—
☆ Save
2026-05-07
Signage
$400,000
425 Hayes
ti, demo (e) + (n) partitions, fixtures, millwork, finishes. (signage deferred t…
—
☆ Save
2026-05-07
Roofing
$22,850
416 31st
re-roofing: remove and replace roofing material / existing roofing material (in-…
replacement
—
☆ Save
2026-05-07
General Construction
$67,500
1434 Yosemite
`
—
☆ Save
2026-05-07
Roofing
$7,000
50 Retiro
metal jomy roof ladder located on side property for roof servicing access only. …
—
☆ Save
2026-05-07
Pool/Spa
$150,000
779 43rd
interior remodel of (e) sfd 2nd fl - kitchen remodathroom & closet. demoe (e) de…
817 roof sf
New installation
—
☆ Save
2026-05-07
Roofing
$25,250
260 Yerba Buena
re-roofing: remove and replace roofing material / existing roofing material (in-…
replacement
—
☆ Save
2026-05-07
General Construction
—
99 Lupine
obtain final inspection for work approved under 202009285227. all work is comple…
—
☆ Save
2026-05-07
General Construction
$3,000
253 Hartford
replace approximately 2' w x 4' l damaged exterior siding on ground level, not s…
—
☆ Save
2026-05-07
Electrical
$2,000
575 Market
this project involves modification of (e) ti to include construction of new non-…
low voltage
New installation
—
☆ Save
2026-05-07
General Construction
$3,000
3664 17th
dry rot repair per sb721 report at the rear wooden staircase, about 5%. not stre…
—
☆ Save
2026-05-07
General Construction
$120,000
2095 Jerrold
maintain the existing paving(via grind & repaving with crete seal), restripe, an…
—
☆ Save
2026-05-07
HVAC/Mech
$400,000
426 Valley
convert part of garage & storage into conditioned space w/ new bedroom/bath/laun…
—
☆ Save
2026-05-07
Electrical
$50,000
1 Embarcadero Center
electrical power, lighting, and signal ref 202603238043
—
☆ Save
2026-05-07
Electrical
$15,000
1371 34th
comply with nov 202654182: legalize window replacmeen throughout dwelling. remov…
—
☆ Save
2026-05-07
Structural
$60,000
440 Davis
unit #501: rehabilitate (e) kitchen and bathroom install washer and dryer, no re…
—
☆ Save
2026-05-07
Roofing
$29,900
1120 Lake
reroofing. no hot works. no work to (e) roof strutural sheathing.
—
☆ Save