Arlington Building Permits & Contractor Data

3,040 permits tracked

Updated recently · 2026-04-24
Get full access to Arlington contractor leads
Phone numbers, websites, and daily new-permit alerts. Cancel anytime.
See Pricing — $149/mo Free Alerts ↓
Arlington had 516 new building permits filed in the last 30 days, led by 250 general construction, 85 hvac and 51 windows & doors. The average project value is $459,668.

🔔 Get SI Daily Arlington Permit Alerts

New permits, violations, and contractor activity delivered to your inbox. Free — no credit card.

Clear filters 📥 CSV 📊 Report
Showing 0 permits for SI

Recent Building Permits in Arlington

Latest permits filed with the Arlington building department

📥 Download CSV

Building Activity in Arlington

3,040 records — permits and code violations sorted by date

📥 CSV
Date Type Address Details Contractor / Status
2026-04-24 RP 4721 PRAIRIE CREST LANE 2021 I-Codes / 2020 NEC New Construction – SFR One Hour Protected Overhangs wher…
2026-04-24 RP 2405 AUTUMN OAKS TRAIL 2021 IRC Foundation Repair only **Must Call for a Final Inspection** Stamped eng…
2026-04-24 CO 309 N MESQUITE ST Transportation and Warehousing
2026-04-24 RP 6610 WICKLOW STREET Window / Door Change Outs Only 2021 IECC No MEP’s Leave sticker attached for Fin…
2026-04-24 CO 1821 E DIVISION STREET No Building Permit
2026-04-24 SI 1827 SW GREEN OAKS BOULEVARD 149 New
2026-04-24 RP 808 BUTTERCUP LANE New Construction
2026-04-24 FE 4719 HAWTHORN HILLS LANE CREATED BY 24-067311 PL
2026-04-24 SI 4700 S COOPER STREET New
2026-04-24 RP 2309 SHADYDALE DRIVE 2021 IRC Foundation Repair only **Must Call for a Final Inspection** Stamped eng…
2026-04-24 RP 8012 HAT CREEK COURT 2021 IRC Foundation Repair only **Must Call for a Final Inspection** Stamped eng…
2026-04-24 CO 2201 E LAMAR BOULEVARD 100 Professional, Scientific, and Technical Services
2026-04-23 CO 3871 S COOPER ST Retail Trade
2026-04-23 RP 400 SOMMERVILLE CT 2021 I-Codes / 2020 NEC Residential remodel of Master Bathroom scope of work to …
2026-04-23 SI 985 N COOPER ST New
2026-04-23 SI 985 N COOPER ST New
2026-04-23 RP 8101 GLENN DAY DRIVE New Construction
2026-04-23 RP 3627 CHAMBERLAND DRIVE 2021 IRC Foundation Repair only **Must Call for a Final Inspection** Stamped eng…
2026-04-23 RP 500 CORBIN DRIVE 2021 IRC Foundation Repair only **Must Call for a Final Inspection** Stamped eng…
2026-04-23 RP 6225 COOL SPRINGS DRIVE Window / Door Change Outs Only 2021 IECC No MEP’s Leave sticker attached for Fin…
2026-04-23 RP 1808 JACKSON DRIVE Window / Door Change Outs Only 2021 IECC No MEP’s Leave sticker attached for Fin…
2026-04-23 FE 4811 SW GREEN OAKS BOULEVARD Pool Barrier: Gates must be self-closing and self-latching and open away from th…
2026-04-23 CO 4000 FIVE POINTS BOULEVARD Suite 101 The issuance of this CO is granted for operation and occupancy of the reflected …
2026-04-23 RP 703 BERT DRIVE 2021 I-Codes / 2020 NEC Installing a 22kw standby generator with a transfer swit…
2026-04-23 CP 1908 E PIONEER PARKWAY 2021 IBC Foundation Repair only **Must Call for a Final Inspection** Stamped eng…
Page 1 of 122 · 3,040 total 1 2 121 122 Next →

No contractor lead data available for Arlington. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Arlington — 3,040 permits by category
Construction Activity in Arlington

New building permits in Arlington, Texas indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Arlington Building Permits

Arlington, Texas processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 3040+ Arlington building permits with data updated daily from official city sources.

Every new construction project in Arlington requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Arlington.

How Contractors Use Arlington Permit Data

HVAC contractors, electricians, plumbers, and roofers in Arlington use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Arlington building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Arlington electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Arlington Contractor Guides

In-depth resources for contractors working in Arlington

2026-03-25

Arlington Building Permits: The Contractor's Guide to Construction Leads in Texas' Sports & Entertainment Hub

Arlington is in growth mode. Positioned between Dallas and Fort Worth as the region's third-largest ...

Read guide →
Nearby Texas Cities — explore building permits in other Texas cities

Turn Arlington permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. Free tier for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Arlington Building Permits

How many building permits does PermitGrab track in Arlington?

PermitGrab currently tracks 3040 building permits in Arlington, Texas. Data is pulled daily from the official municipal open-data source and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Arlington permit data?

Most cities refresh their open-data portals on a 24-hour cadence, so new permits typically appear in PermitGrab within 1–3 days of filing. Arlington is collected on every daemon cycle; if the upstream source has a known delay we note it on the page.

How can contractors find construction leads in Arlington?

Contractors find leads in Arlington by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the free trial?

The 14-day free trial includes full Pro access to Arlington — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. No credit card required.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.