| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-05-27 | Mechanical Systems | CARROLL STREET | PROPOSED MECHANICAL WORK AT MEDGAR EVERS COLLEGE PHASE 2- ELECTRICAL DISTRIBUTIO… | $34,006 |
| 2026-01-07 | Mechanical Systems | GUY R BREWER BOULEVARD | MECH WORK ON CEL, BAS, & 4TH FL OF 5 STORY BUILDING CONSISTING OF REPLACE OF VAV… | $104,000 |
| 2025-08-22 | Construction Fence | 107 STREET | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 34-52 107 STREET QUEENS, NY 1136… | $10,000 |
| 2025-08-21 | Supported Scaffold | 107 STREET | INSTALLATION OF PIPE SCAFFOLD AT 34-52 107 STREET QUEENS, NY 11368 AS INDICATED … | $10,000 |
| 2025-04-28 | Construction Fence | 150 AVENUE | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 124Q AT 129-15 150 AVENUE,QU… | $20,000 |
| 2025-04-03 | Mechanical Systems | GREENWICH STREET | Provide new Fire Smoke Dampers, Smoke Dampers and Duct Smoke Detectors. | $66,259 |
| 2025-03-28 | Construction Fence | EAST NEW YORK AVENUE | K722, INSTALLATION OF 380 LINEAR FEET OF CHAIN LINK FENCE TO ENCLOSE THE OPFFICE… | $15,000 |
| 2025-03-26 | Mechanical Systems | EAST NEW YORK AVENUE | K722, INSTALLATION OF A TEMPORARY MOBILE CHILLER TRAILER CONNECTED TO EXISTING B… | $50,000 |
| 2025-03-20 | Sidewalk Shed | EAST NEW YORK AVENUE | K094, INSTALLATION OF +/- 59 LINEAR FEET OF SIDEWALK SHED IN CONJUNCTION WITH DO… | $20,000 |
| 2025-03-19 | Supported Scaffold | EAST NEW YORK AVENUE | K722, INSTALLATION OF +/- 80 SF OF SUPPORTED SCAFFOLD IN CONJUNCTION WITH DOB # … | $15,000 |
| 2025-02-07 | Mechanical Systems | 94 STREET | REMOVAL OF EXISTING FAN COIL. INSTALL NEW AIR CONDITIONING SYSTEM AND RELATED DU… | $52,500 |
| 2024-12-20 | General Construction | EAST 163 STREET | Remove (1) air cooled split system/install new cooled split system, temporary re… | $180,000 |
| 2024-10-29 | Construction Fence | WEIRFIELD STREET | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 239Q AT 17-15 WEIRFIELD STRE… | $20,000 |
| 2024-09-24 | Mechanical Systems | TELLER AVENUE | REMOVE EXISTING AIR HANDLING UNIT AND INSTALL NEW AHU INCLUDING ASSOCIATED DUCTW… | $279,999 |
| 2024-09-17 | Mechanical Systems | WEST 177 STREET | Selective demo/removal of existing ductwork/valves/controls, install (1) VRF (DO… | $112,000 |
| 2024-07-17 | Mechanical Systems | FIRST AVENUE | Cooling systems for elevator machine rooms | $450,000 |
| 2024-06-06 | Construction Fence | RIVERDALE AVENUE | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 446K AT 76 RIVERDALE AVENUE… | $10,000 |
| 2024-05-11 | Mechanical Systems | EAST GUN HILL ROAD | X425_Swimming Pool, Reinforcing Support Elements, and Locker Room Upgrade | $8,112,259 |
| 2024-04-29 | Mechanical Systems | HANNAH STREET | *HUB CONSULTATION ACCEPTED* Herewith filing Mechanical Work in conjunction with … | - |
| 2024-04-29 | Mechanical Systems | WILLOUGHBY AVENUE | K162-NEW ROOF TOP AIR SOURC HEAT PUMP , MAKE UP AIR UNIT, ELECTRIC HEATING UNITS… | $10,000,000 |
| 2024-04-29 | Mechanical Systems | 89 AVENUE | PS 306 (Q262): Replace 4 rooftop HVAC units with new heat pump HVAC equipment. … | $1,950,000 |
| 2024-04-25 | Construction Fence | PAGE AVENUE | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 6R AT 555 PAGE AVENUE, STATE… | $20,000 |
| 2024-04-25 | Structural | EAST 22 STREET | Replacement and repair of damaged concrete floor slab | $351,960 |
| 2024-04-23 | Mechanical Systems | WILLOUGHBY AVENUE | Remove portions of existing ductwork abandoned in place as related to new fire r… | $154,090 |
| 2024-04-23 | Mechanical Systems | EAST 22 STREET | Removal and replacement of a toilet room and janitor's closet. PAA description i… | $123,600 |
| 2024-04-22 | Mechanical Systems | BRITTON AVENUE | Mechanical work associated with alteration of existing building. No change to us… | $438,850 |
| 2024-04-19 | Mechanical Systems | 86 AVENUE | Provide new exhaust fans and gravity ventilators, reinstall condensing unit afte… | $2,000,000 |
| 2024-04-19 | Mechanical Systems | EAST 117 STREET | Removal of existing oil fired steam heating plant, heating and ventilation units… | - |
| 2024-04-19 | Mechanical Systems | EAST NEW YORK AVENUE | Replace existing (1) chiller and (1) condensing unit and associated equipment wi… | $3,999,900 |
| 2024-04-15 | General Construction | EAST NEW YORK AVENUE | Remove existing dunnage at roof and provide new dunnage. Provide new concrete e… | $3,999,900 |
| 2024-04-12 | Construction Fence | AMSTERDAM AVENUE | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR HS 490M AT 122 AMSTERDAM AVENUE… | $20,000 |
| 2024-03-28 | Mechanical Systems | LAYTON AVENUE | Remove & reinstall fans, vents, condensing units and related piping on new prefa… | $115,218 |
| 2024-01-29 | Structural | 137 AVENUE | STRUCTURAL STEEL DUNNAGE IN CONJUNCTION WITH HVAC UPGRADE | $100,000 |
| 2024-01-24 | Mechanical Systems | 137 AVENUE | HVAC UPGRADE | $1,500,000 |
| 2024-01-22 | General Construction | 137 AVENUE | NEW CEILING AND MINOR PARTITION ALTERATIONS IN CONJUNCTION WITH HVAC UPGRADE | $400,000 |
| 2024-01-09 | Mechanical Systems | AMSTERDAM AVENUE | MECHANICAL WORK TO THE SECOND AND THIRD FLOOR OF CUNY SOPHIE DAVIS BIOMEDICAL SC… | $250,000 |
| 2024-01-09 | General Construction | EAST 67 STREET | M480: Install new ventilation connected to the existing mechanical equipment in … | $2,399,985 |
| 2024-01-08 | General Construction | AMSTERDAM AVENUE | GENERAL CONSTRUCTION WORK TO THE SECOND AND THIRD FLOOR OF CUNY SOPHIE DAVIS BIO… | $300,000 |
| 2023-10-27 | Foundation | WYCKOFF STREET | THE SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO THE CONSTRUCTION OF NEW STEEL F… | $3,000,000 |
| 2023-10-04 | Mechanical Systems | WEST 56 STREET | Coordination of trades and obtaining permits and approvals | $22,000 |
| 2023-09-11 | Mechanical Systems | WEST 164 STREET | Work includes replacement of existing rooftop exhaust fans/ventilators, Install … | $204,990 |
| 2023-09-06 | Structural | OCEAN TERRACE | REPLACE CHILLERS AND DEFECTIVE VENTILATION UNITS AND CONTROLS. REPLACE OUTDOOR E… | $4,200,000 |
| 2023-09-04 | General Construction | OCEAN TERRACE | Replace suspended ceilings, louvers, pitch pockets at roof. Provide new fire-rat… | $250,000 |
| 2023-08-24 | Mechanical Systems | SARATOGA AVENUE | PS137: Installation of HVAC system for building addition. No change in use egres… | $434,000 |
| 2023-08-10 | Structural | 107 STREET | MINOR MODIFICATION OF EXISTING STRUCTURAL FRAMING IN CONNECTION TO THE CONVERSIO… | $45,000 |
| 2023-05-30 | Structural | GUY R BREWER BOULEVARD | Provide structural modifications to existing basement to facilitate the installa… | $9,990,000 |
| 2023-05-14 | Mechanical Systems | GUY R BREWER BOULEVARD | Replacement of five (5) central air handling units and associated return fans. | $5,220,000 |
| 2023-03-24 | Mechanical Systems | WELLER AVENUE | Remove & replace 1 Split AC system on the roof & MDF room on the 3rd floor., Re… | $500,000 |
| 2023-03-06 | Mechanical Systems | PAGE AVENUE | Installation of new chiller plant, air handling units, HVAC pump, unit ventilato… | $3,999,600 |
| 2023-03-03 | Mechanical Systems | CENTER STREET | Modification to the existing Mechanical system in the Men's & Women's bathroom. … | $36,747 |