| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-05-21 | Building | 917 E 66TH ST | replacing hp/ah | $16,120 |
| 2026-05-18 | Utility Connection | 913 N 6TH ST | Emergency side sewer spot repair, no work or staging in ROW. | - |
| 2026-05-15 | Building | 6533 S K ST | Replacing gas furnace, ac and low volt wiring for tstat | $9,822 |
| 2026-05-12 | Building | 5614 31ST ST NE | Replacing gas furnace, ac and low volt wiring for tstat | $11,087 |
| 2026-05-12 | Building | 1212 S PROSPECT ST | Adding 4-zone mini split to home | $20,925 |
| 2026-04-07 | Building | 3616 S 7TH ST | gas furnace replacement, low voltage wiring for thermostat at SFD | $8,000 |
| 2026-03-26 | SEWER - PARTIAL LINE REPLACEMENT | 8511 216TH ST SW | Side sewer spot repair | - |
| 2026-03-11 | SEWER - PARTIAL LINE REPLACEMENT | 21208 96TH AVE W | SIDE SEWER - Side sewer spot repair with liner install of up to 15'. | - |
| 2026-02-24 | Building | 3807 S 9TH ST | Install water heater at SFD | $2,500 |
| 2026-02-23 | SINGLE FAMILY-MECHANICAL-REPAIR OR REPLACEMENT | 20428 82ND AVE W | FURNACE | - |
| 2026-02-18 | Utility Connection | 6239 S MASON AVE | Open trench repair of sanitary sewer line at SFD pending field approval of the C… | $20,370 |
| 2026-02-06 | Utility Connection | 6707 S MONROE ST # A | Repair of sanitary sewer line at SFD. Open trench method. No barricades, no ROW … | $13,607 |
| 2026-01-30 | Building | 5521 BROWNS POINT BLVD | Whole Home Re-pipe of SFD. | $30,438 |
| 2026-01-27 | Utility Connection | 4829 YAKIMA AVE | REPAIR SANITARY SEWER at SFD - Open Trench Method, No work on the ROW, or PAtch … | - |
| 2025-12-03 | Building | 4514 36TH ST NE | Remove and replace gas furnace and low volt wiring for tstat at SFD. | $8,061 |
| 2025-11-26 | Utility Connection | 2921 S PROCTOR ST # A | Open trench repair of sanitary sewer pending CIPP approval by inspector at tripl… | - |
| 2025-11-25 | Building | 7021 GOLDEN GIVEN RD | Remove/replace gas furnace and low volt wiring for tstat at SFD | $9,825 |
| 2025-11-25 | Building | 5244 BAY PL NE | Remove/replace gas furnace and low volt wiring for tstat at SFD | $7,044 |
| 2025-11-24 | Building | 605 E 91ST ST | Replacing Tub Drain, partial home Water re-pipe at SFD. | $1,901 |
| 2025-11-24 | Building | 414 S 60TH ST | Remove/replace air handler at SFD | $6,054 |
| 2025-11-21 | Building | 5702 N 33RD ST # 3A | Remove and replace furnace and add Heat Pump at SFD | $16,103 |
Phone numbers, websites, license status, and CSV export — for all Edmonds contractors.
Subscribe — $149/mo