| 2026-06-18 | - | 7228 168TH PL | IN THE FRONT YARD DIG DOWN 3FT TO REMOVE BROKEN 6 45, MAKE REPAIR AND ADD A 6 CL… | $4,000 |
| 2026-06-09 | - | 7938 164TH PL | INSTALL NEW BATHTUB, SURROUND, AND SHOWER TRIM. | $10,000 |
| 2026-06-03 | - | 17555 OAKWOOD DR | EMERGENCY SEWER REPAIR TO SHEARED OFF. IN THE FRONT YARD AT THE FOUNDATION DIG 4… | $4,200 |
| 2026-06-03 | - | 8955 178TH ST | EMERGENCY SEWER REPAIR NO SERVICE . IN THE FRONT YARD 5FT OFF THE FOUNDATION DIG… | $4,200 |
| 2026-05-29 | - | 10327 HILLTOP DRIVE | IN THE FRONT YARD DIG DOWN ABOUT 10FT TO THE BROKEN 6 CLAY SEWER, REMOVE SECTION… | $9,500 |
| 2026-05-26 | - | 11225 159TH STREET | INSTALL 3 ADA GRAB BARS. INSTALL WALL COUNT LAVATORY SINK AND FAUCET WITH MIXING… | $1,500 |
| 2026-05-20 | - | 15167 HIAWATHA TRAIL | DIG 6 DEEP IN FRONT YARD TO INSTALL NEW 6 SDR PVC CLEANOUT. | $3,500 |
| 2026-05-13 | - | 18429 LAKEVIEW CIRCLE EAST | REMOVING ASPHALT/ CONCRETE TO DIG DOWN 5.5 TO SEPARATED 4-6 CONNECTION ON MAIN S… | $6,000 |
| 2026-05-13 | - | 8135 TUDOR LN | IN THE BACK YARD TRENCH OUT ABOUT 55 FOR SUMP PUMP DISCHARGE LINE USING 4SDR AND… | $4,700 |
| 2026-05-12 | - | 9968 CONSTITUTION DRIVE | REMOVE TEE AND REPLACE WITH COUPLING, CAP OFF LINES GOING IN GROUND. | $300 |
| 2026-05-11 | - | 9214 137TH STREET | REMOVE T CONNECTING THE SPRINKLER SYSTEM FROM THE MAIN WATER SUPPLY, REMOVE ALL … | $450 |
| 2026-04-24 | - | 8026 WHEELER DRIVE, ORLAND PARK, IL 60462 | REPLACE 55 OF SUMP PUMP DISCHARGE LINE INTO THE STORM BASIN AND TIE INTO THE GUT… | $4,500 |
| 2026-04-24 | - | 8026 WHEELER DRIVE | REPLACE 55 OF SUMP PUMP DISCHARGE LINE INTO THE STORM BASIN AND TIE INTO THE GUT… | $4,500 |
| 2026-04-23 | - | 8306 TANBARK DR | IN THE FRONT YARD AT THE FOUNDATION DIG ABOUT 4.5 FT DEEP TO THE SHEAR OFF, INST… | $4,000 |
| 2026-04-23 | - | 8306 TANBARK DR, TINLEY PARK, IL 60477 | IN THE FRONT YARD AT THE FOUNDATION DIG ABOUT 4.5 FT DEEP TO THE SHEAR OFF, INST… | $4,000 |
| 2026-04-15 | - | 17942 CHERRYWOOD LN | RESIDENTIAL PLUMBING | $4,800 |
| 2026-04-03 | - | 10640 BLUE HERON DRIVE | EXCAVATE EXTERIOR SUMP DISCHARGE UP TO BASIN ABOUT 30 AND RE-PIPE IN SDR. | $3,500 |
| 2026-03-30 | - | 8541 144TH PLACE, ORLAND PARK, IL 60462 | DIG DOWN 6.5-7 TO INSTALL 10 OF 6 SDR TO REPAIR BROKEN CLAY TILE. | $7,000 |
| 2026-03-17 | - | 8300 JESSICA LN, TINLEY PARK, IL 60477 | IN THE FRONT YARD DIG AT FOUNDATION DOWN 4FT TO SHEARED OFF CAST IRON SEWER, REM… | $4,500 |
| 2026-03-12 | - | 8120 SHOSHONE TRL, TINLEY PARK, IL 60477 | WE WILL BE RUNNING SUMP LINES TO THE OTHER CORNER OF THE BASEMENT EXITING THROUG… | $4,800 |
| 2026-03-11 | - | 8740 167TH PLACE, ORLAND PARK, IL 60462 | REMOVE LAMINATE FLOORING TRIM TO BREAK UP THE FLOOR REMOVE 8 OF BROKEN 2 GALVANI… | $3,500 |
| 2026-03-09 | - | 10234 HAWTHORNE DRIVE, ORLAND PARK, IL 60462 | BREAK UP CONCRETE FLOOR IN KITCHEN TO REPLACE 20 OF 2 GALVANIZED PIPE WITH 2 PVC… | $6,500 |
| 2026-02-27 | - | 16411 90TH AVENUE, ORLAND PARK, IL 60462 | REPAIR SEWER ON THE NORTH SIDE OF THE HOUSE 30 OFF THE FOUNDATION, DIG 4 TO REPL… | $4,000 |
| 2026-02-26 | - | 13614 IDLEWILD DRIVE, ORLAND PARK, IL 60462 | RE-PIPE WATER LINES DRAINAGE FOR THE WHOLE HOUSE. | $17,000 |
| 2026-02-24 | - | 6131 LAURA LN, , IL 60477 | ON THE LEFT SIDE OF THE PROPERTY, WITHIN 5 OF THE FOUNDATION WE WILL DIG DOWN 4.… | $4,250 |
| 2026-02-23 | - | 13566 86TH AVENUE, ORLAND PARK, IL 60462 | REPAIR SEWER LINE 8 DEPTH WITHIN 5 OF FRONT OF FOUNDATION ADD A CLEANOUT USING S… | $7,500 |
| 2026-02-17 | - | 8300 BLUE SPRUCE CT, TINLEY PARK, IL 60477 | EMERGENCY SANITARY SEWER REPAIR CUSTOMER HAS NO SERVICES. IN THE FRONT YARD 20FT… | $5,000 |
| 2026-02-16 | - | 13526 IDLEWILD DRIVE, ORLAND PARK, IL 60462 | RE-PIPE KITCHEN SINK LINE, CUT VENT STACK IN DOWNSTAIRS BATHROOM, DISCONNECT SEC… | $4,500 |
| 2026-02-12 | - | 6632 174TH PL, , IL 60477 | RUN NEW COPPER LINE FROM THE B-BOX TO THE HOUSE WATER METER | $1 |
| 2026-02-10 | - | 10662 GOLF ROAD, ORLAND PARK, IL 60462 | REPAIR SEPARATED SEWER LINE AND REPLACE CLEANOUT. | - |
| 2026-01-13 | - | 13869 REDWOOD DRIVE, ORLAND PARK, IL 60462 | DIG 4 DEEP AT THE FOUNDATION TO REPAIR SANITARY SEWER LINE WITH 6 SDR PVC. | - |
| 2026-01-12 | - | 6419 167TH ST, TINLEY PARK, IL 60477 | IN THE BACKYARD STARTING 1FT OFF THE FOUNDATION DIG DOWN 6FT DEEP TO REPAIR THE … | $4,000 |
| 2025-12-30 | - | 9107 151ST ST, ORLAND PARK, IL 60462 | DIG 4 FROM REAR OF BUILDING TO REPAIR A BREAK INSTALL 4 SCHEDULE 40 PVC CLEANOUT… | - |
| 2025-12-26 | - | 8842 147TH ST, ORLAND PARK, IL 60462 | EMERGENCY SEWER REPAIR. INSTALL 4 SCHEDULE 40 PVC CLEANOUT. | - |
| 2025-12-19 | - | 13821 MAPLE AVENUE, ORLAND PARK, IL 60462 | INSTALL A PVC CLEANOUT 3.5 FEET DEEP IN FRONT YARD NOT TOUCHING CITY LIMITS, BAC… | - |
| 2025-12-09 | - | 17120 OLEANDER AVE, TINLEY PARK, IL 60477 | SANITARY SEWER REPAIR. ON THE NORTH SIDE OF THE DRIVEWAY 6FT OFF THE FOUNDATION … | $6,500 |
| 2025-12-08 | - | 14930 AVENIDA DEL ESTE ST, ORLAND PARK, IL 60462 | REPAIR BAD SECTION OF 6 CLAY TILE AND INSTALL 6 CLEANOUT. | - |
| 2025-11-25 | - | 8721 166TH PLACE, ORLAND PARK, IL 60462 | SEWER REPAIR IN FRONT YARD, 4.5 DEEP 5 BREAK SECTION INSTALL NEW 6 SDR. | - |
| 2025-11-24 | - | 8560 CEDAR ST, ORLAND PARK, IL 60462 | DIG UP BROKEN SECTION OF CLAY SEWER IN FRONT YARD REPAIR WITH 6 SDR PIPE. | - |
| 2025-11-24 | - | 17100 69TH AVE, TINLEY PARK, IL 60477 | IN THE WEST PARKING LOT BREAK OUT THE ASPHALT DIG DOWN 4.5FT TO REMOVE THE COLLA… | $5,500 |
| 2025-11-19 | - | 17339 ORIOLE AVE, TINLEY PARK, IL 60477 | WE WILL PERFORM AN EMERGENCY SEWER REPAIR CUSTOMER HAS NO SANITARY SERVICES. DIG… | $6,000 |
| 2025-11-05 | - | 17701 MULBERRY AVE, TINLEY PARK, IL 60487 | RUN ABOUT 65 FT OF GAS YELLOW POLY FOR POOL HEATER FROM GAS METER TO POOL HEATER | $2,000 |
| 2025-10-27 | - | 16439 BLOSSOM LN, TINLEY PARK, IL 60487 | IN THE FRONT YARD DIG 3FT TO SEWER LINE, INSTALL 4 OUTSIDE CLEANOUT. BACKFILL AF… | $3,500 |
| 2025-10-24 | - | 16807 OCONTO AVE, TINLEY PARK, IL 60477 | DIG AND INSTALL 4CLEAN OUT AT THE FOUNDATION REPAIRING SHEARED OFF SEWER | $3,800 |
| 2025-10-15 | - | 16938 SAYRE AVE, TINLEY PARK, IL 60477 | WE ARE GOING TO PERFORM AN EMERGENCY SANITARY SEWER REPAIR. RAW SEWAGE DUMPING I… | $10,000 |
| 2025-10-09 | - | 6551 HUBBARD LN, TINLEY PARK, IL 60477 | BREAK FLOOR AROUND THE SEWER STACK AND REPLACE BROKEN CAST IRON 90 PIPE WITH PVC… | $4,500 |
| 2025-10-07 | - | 7600 163RD PL, TINLEY PARK, IL 60477 | IN THE FRONT YARD WITHIN 5FT OF FOUNDATION DIG DOWN 4 FT TO THE MAIN SEWER, REPA… | $4,000 |
| 2025-09-25 | - | 6325 SCOTT CT, TINLEY PARK, IL 60477 | EMERGENCY DIG LIMITED SANITARY SERVICES. DIG DOWN 5FT TO THE MAIN SEWER INSTALL … | $4,250 |
| 2025-09-23 | - | 7283 174TH PL, TINLEY PARK, IL 60477 | EMERGENCY SEWER REPAIR NO SERVICE. | $10,000 |