| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-07-29 | Res | 5600 23RD AVE S | drain tile and wall encapsulation (MAA) | $4,942 |
| 2026-07-17 | Res | 4721 EWING AVE S | drain tile sump basket and sump pump discharge | $9,251 |
| 2026-07-17 | Res | 4043 BLAISDELL AVE | New drain tile, sump, and discharge -ACW Building Code: 2020 MNSBC/2018 IRC Ener… | $9,064 |
| 2026-07-16 | Res | 4305 45TH AVE S | INSTALL 35 FEET INTERIOR DRAIN TILE, 34 LINEAR FEERWALL ENCAP, SUMP WELL, SUMP P… | $8,100 |
| 2026-07-16 | Res | 3058 HAYES ST NE | INSTALL STRUCTURAL SUPPLEMENT engineer: 54808 - Nevison, Patrick Richard Buildin… | $11,083 |
| 2026-07-16 | Res | 4901 EWING AVE S | 21' interior drain tile, sump pump, basket, discharge | $6,350 |
| 2026-07-16 | Res | 1706 BUCHANAN ST NE | INSTALL STRUCTURAL SUPPLEMENT engineer: 54808 - Nevison, Patrick Richard Buildin… | $6,956 |
| 2026-07-16 | Res | 3721 27TH AVE S | Drain tile and sump pump, 6 waler beams (MAA) | $19,000 |
| 2026-07-08 | Res | 621 36TH ST E | basement foundation wall stabilization. engineer: nevison #54808 Building Code: … | $10,098 |
| 2026-07-02 | Res | 3640 41ST AVE S | (DMH-ProjectDox) INSTALL 50' PERIMETER DRAINTILE SYSTEM, SUMP BASKET & PUMP IN B… | $18,179 |
| 2026-07-01 | Res | 1400 42ND ST E | Interior drain tile, sump, discharge -ACW Building Code: 2020 MNSBC/2018 IRC Ene… | $10,675 |
| 2026-06-12 | Res | 4445 40TH AVE S | INSTALL STRUCTURAL SUPPLEMENT engineer: 54808 - Nevison, Patrick Richard Buildin… | $5,090 |
| 2026-06-12 | Res | 4425 34TH AVE S | CARBON STRAPS. (JJL) ENGINEER: SAFE BASEMENTS - PAT NEVISON #54808 Building Code… | $5,675 |
| 2026-06-09 | Res | 1344 KNOX AVE N | install basement egress window. Building Code: 2020 MNSBC/2018 IRC Energy Code: … | $5,779 |
| 2026-06-01 | Res | 3837 GIRARD AVE N | INSTALL STRUCTURAL SUPPLEMENT engineer: 54808 - Nevison, Patrick Richard Buildin… | $3,800 |
| 2026-05-08 | Res | 4321 16TH AVE S | 8 foundation push piers. engineer: nevison | $23,479 |
| 2026-05-08 | Commercial | 4525 BRYANT AVE S #5 | New drain tile -ACW certificate of occupancy required: no special inspections re… | $4,396 |
| 2026-05-04 | Res | 3418 OLIVER AVE N | 112' interior drain tile, sump basket, sump pump, sump lid, and discharge | $13,769 |
Phone numbers, websites, license status, and CSV export — for all Minneapolis contractors.
Subscribe — $149/mo