| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-05-29 | General Construction | PARK AVENUE SOUTH | General construction modifications taking place on the 4th floor as per plans fi… | $70,005 |
| 2026-05-29 | Mechanical Systems | PARK AVENUE SOUTH | General mechanical modifications taking place on the 4th floor as per plans file… | $20,010 |
| 2026-05-28 | Mechanical Systems | BROADWAY | Mechanical work on the 33rdf floor (Alliance for Downtown) as indicated on drawi… | $59,995 |
| 2026-05-28 | General Construction | EAST 76 STREET | Demolition of interior partitions along with existing finishes. | $5,128 |
| 2026-05-28 | General Construction | BROADWAY | Construction work on the 33rd floor (Alliance for Downtown) as indicated on draw… | $617,838 |
| 2026-05-22 | Mechanical Systems | PARK AVENUE | Mechanical modifications taking place on the 4th floor as per plans filed herewi… | $30,000 |
| 2026-05-22 | General Construction | PARK AVENUE | Architectural modifications taking place on the 4th and 5th floors as per plans … | $559,650 |
| 2026-05-15 | General Construction | EAST 76 STREET | Demolition of interior partitions along with existing finishes. | $10,257 |
| 2026-05-13 | General Construction | WEST 57 STREET | General construction work to include removal of interior partitions on floors 25… | $715,059 |
| 2026-05-13 | Structural | WEST 57 STREET | Structural work on floors 25 & 26 (marketing floors 29 & 30). Filed in conjuncti… | $106,613 |
| 2026-05-13 | General Construction | EAST 76 STREET | Demolition of interior partitions along with existing finishes. | $20,514 |
| 2026-05-11 | General Construction | EAST 76 STREET | Demolition of interior partitions along with existing finishes. | $20,514 |
| 2026-04-30 | Mechanical Systems | ROCKEFELLER PLAZA | Alterations of low-pressure ductwork distribution and installation of Fan Coil U… | $453,929 |
| 2026-04-28 | General Construction | ROCKEFELLER PLAZA | Interior alteration work within an existing office space, including removal and … | $1,425,592 |
| 2026-04-27 | Mechanical Systems | WEST 33 STREET | Mechanical work associated with Alt-CO to partially convert existing office buil… | $4,340,000 |
| 2026-04-24 | Mechanical Systems | AVENUE OF THE AMERICAS | Filing herewith mechanical demolition work as per plans filed herewith. (39th to… | $49,434 |
| 2026-04-24 | General Construction | AVENUE OF THE AMERICAS | Filing herewith interior demolition on the 41st to 44th FL. (39th to 42nd FL. Co… | $449,320 |
| 2026-04-21 | General Construction | MADISON AVENUE | Minor interior demolition of existing office space, including the removal of par… | $23,000 |
| 2026-04-20 | Structural | AVENUE OF THE AMERICAS | Structural, foundation, earthwork on the cellar and 1st floor as indicated on d… | $294,971 |
| 2026-04-17 | Mechanical Systems | 5 AVENUE | #9000 - Lighting and Mechanical modifications in Retail space for Popmart. No c… | $400,050 |
| 2026-04-16 | Mechanical Systems | HUDSON YARDS | Filing herewith for removal, I installation, and modification of the existing me… | $1,467,500 |
| 2026-04-16 | Mechanical Systems | LEXINGTON AVENUE | Modifications to the existing system to accommodate new layout. | $30,051 |
| 2026-04-15 | General Construction | AVENUE OF THE AMERICAS | TTD - 42C/44M - FILING HEREWITH ALT 1 CREATING A HORIZONTAL EGRESS/ AREA OF REFU… | $100,000 |
| 2026-04-15 | Structural | HUDSON YARDS | Filing herewith for Structural work as per plans. This includes the support of … | $18,500 |
| 2026-04-14 | General Construction | HUDSON YARDS | Filling herewith for interior demolition and installation of non-load bearing pa… | $9,415,000 |
| 2026-04-09 | Structural | 5 AVENUE | #9000 - Structural modifications in Popmart space. No change to egress, use, or… | $100,000 |
| 2026-04-08 | General Construction | WEST 33 STREET | EXISTING 13 STORY BRICK FACADE BUILDING, CHANGE OF USE FROM OFFICE TO RESIDENTIA… | $10,202,000 |
| 2026-04-06 | General Construction | 5 AVENUE | #9000 - Interior renovations of Retail spaces for PopMart. No change in egress,… | $499,984 |
| 2026-04-02 | General Construction | 3 AVENUE | Architectural modifications taking place on the 1st and 19th floors as per plans… | $1,150,500 |
| 2026-04-01 | General Construction | PARK AVENUE | Minor demolition with installation of new partitions, doors, suspended ceilings … | $1,289,470 |
| 2026-03-31 | Mechanical Systems | PARK AVENUE | Modification to the existing HVAC system on the 22nd floor (ACP Office) as per p… | $341,810 |
| 2026-03-31 | General Construction | DELANCEY STREET | Fit out of existing office space. No change in use, egress or occupancy. | $1,076,955 |
| 2026-03-31 | Mechanical Systems | DELANCEY STREET | Modifications and redistribution of existing mechanical systems. No change in us… | $302,865 |
| 2026-03-25 | General Construction | VESEY STREET | Relocation of conduit | $100,000 |
| 2026-03-24 | Mechanical Systems | VESEY STREET | Ductwork modifications in conjunction with conduit installation. | $10,000 |
| 2026-02-25 | General Construction | PARK AVENUE | Removal and construction of interior partitions, doors and ceilings as shown on … | $999,515 |
| 2025-12-19 | Structural | WEST 33 STREET | Structural modifications for new mechanical equipment, canopy, lofts, and bulkhe… | $987,000 |
| 2025-12-03 | Mechanical Systems | BRYANT PARK | MECHANICAL WORK ON 25TH & 26TH FLOORS AS SHOWN ON PLANS FILED HEREWITH. NO CHANG… | $1,080,738 |
| 2025-11-12 | General Construction | BRYANT PARK | GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 25TH & 26TH FL… | $6,399,158 |
| 2025-06-30 | General Construction | 5 AVENUE | JOB WAS ACCEPTED TO HUB AT CONSULTATION ON 7/18/23. PROPOSED CHANGE OF USE FROM … | $19,013,759 |
| 2025-06-26 | Mechanical Systems | 7 AVENUE | DEMOLITION OF EXISTING VAVS, DUCTWORK AND PIPING SERVING EXISTING SPACE. INSTALL… | $50,300 |
| 2025-05-28 | General Construction | MAIN STREET | CUNY QUEENS HALL LIBRARY Renovation to existing office suites, removal of existi… | $5,100,000 |
| 2025-05-16 | Mechanical Systems | 5 AVENUE | MECHANICAL WORK IN CONJUNCTION WITH ALT-CO #M00895355-I1. | $3,420,260 |
| 2025-05-13 | Structural | MAIN STREET | PROVIDING STRUCTURAL FRAMING, WHICH INCLUDESWALL PLATES AND POST-INSTALLED ANCHO… | $300,000 |
| 2025-05-02 | Mechanical Systems | MAIN STREET | CUNY QUEENS HALL LIBRARY Renovation Branch ductwork to be reconfigured to accomm… | $1,200,000 |
Phone numbers, websites, license status, and CSV export — for all New York City contractors.
Subscribe — $149/mo