| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-04-23 | Building | 5900 Buffaloe Rd | 16 x 12 Stage, 2 ft high, 6 people max on stage. Date: April 25th, 2026 Time: 1p… | - |
| 2026-03-31 | Building | 305 W South St | **SPECIAL PROJECTS** RED HAT AMPHITHEATER - INSTALL A METAL CARPORT STYLE STRUCU… | $6,000 |
| 2026-03-31 | Building | 408 Ashe Ave | Remove exterior doors and windows and install new doors and windows | $176,350 |
| 2026-03-12 | Building | 4221 Greencastle Ct | INTERIOR RENOVATION - UNITS A, B, C & D All interior and exterior walls and part… | $293,536 |
| 2026-03-11 | Building | 1801 Summerdale Dr | 4 units: 1801-1803-1805-1807 Summerdale Dr; Interior renovation. Existing drywal… | $161,064 |
| 2026-03-06 | Building | 3801 Rock Quarry Rd | Walnut Creek Amphitheater - Bar Renovation - replace existing bar & canopy with … | $73,899 |
| 2026-03-05 | Building | 2550 Operations Way | REPLACE EXPIRED PERMIT#BLDNR-053404-2024 9096 SF SOLAR PANEL Installation of a 1… | - |
| 2026-03-04 | Building | 500 S Salisbury St | PERMANENT REPAIR OF SHIMMER WALL SUPPORT STRUCTURE AT RALEIGH CONVENTION CENTER | - |
| 2026-03-04 | Building | 8305 Camp Durant Rd | **COR PROJECT** DURANT NATURE PRESERVE STREAM RESTORATION PROJECT - The bridge w… | - |
| 2026-02-13 | Building | 2501 N Raleigh Blvd | Installation of 194.400 kW roof mounted solar The system consists of 360 X LONGI… | - |
| 2026-02-13 | Building | 7700 Burwell St | Installation of 80.46 kW roof mounted solar at 7700 Burwell St, Raleigh, NC 2761… | - |
| 2026-02-12 | Building | 500 S Salisbury St | REPAIR RESTORATION OF RALEIGH CONVENTION CENTER KITCHEN (POST FIRE) This is for … | - |
| 2026-02-02 | Building | 4201 1/2 Green Rd | Raleigh Address Assigned: 4201 ½ Green Rd to this trailer. Was not available on … | - |
| 2026-01-29 | Building | 500 S Salisbury St | TEMPORARY SHORING REPAIR OF THE ROOF STRUCTURE THAT SUPPORTS THE SHIMMER WALL FE… | - |
| 2026-01-26 | Building | 500 S Salisbury St | THIS PERMIT IS FOR THE OCCUPANCY OF THE KITCHEN HALLWAY AND BACK OF HOUSE AREAS … | - |
| 2026-01-08 | Building | 500 S McDowell St | TEMPORARY KITCHEN REQUEST FOR 80 DAYS FOR RALEIGH CONVENTION CENTER WHILE REPAIR… | - |
| 2026-01-02 | Building | 305 W South St | **COR PROJECT** Addition of a temporary office trailer #2 (24'x60') for the Red … | - |
| 2026-01-02 | Building | 500 S Salisbury St | THIS PERMIT IS TO OBTAIN OCCUPANCY FOR 300 LEVL DUE TO FIRE DAMAGE AS INDICATED … | - |
| 2025-12-15 | Building | 10321 Falls Of Neuse Rd | THIS PROJECT IS FOR EXPIRED PERMITS FOR BLDNR-020803-2023 * MAIN CASE#- ELECTRIC… | $5,570 |
| 2025-12-15 | Building | 10221 Falls Of Neuse Rd +2 more on this street | THIS PROJECT IS FOR EXPIRED PERMITS FOR * MAIN CASE#- ELECTRICAL BLDG: BLDNR-020… | - |
| 2025-12-15 | Building | 10341 Falls Of Neuse Rd | THIS PROJECT IS FOR EXPIRED PERMITS FOR BLDNR-020751-2023 * MAIN CASE#- ELECTRIC… | $77,056 |
| 2025-12-15 | Building | 514 Method Rd | **COR PRJECT** 200 Amp Service Meter address: 528 Method Rd Installation of four… | - |
| 2025-12-15 | Building | 500 S Salisbury St | REQUESTING PARTIAL OCCUPANCY PERMIT AFTER FIRE REMEDIATION AT RALEIGH CONVENTION… | - |
| 2025-11-19 | Building | 2 E South St | **SPECIAL PROJECT - OMNI HOTEL** Alteration Level 2 - Increase Business (B) Area… | $290,736 |
| 2025-10-29 | Building | 3050 N New Hope Rd | (1) 40' x 30' Mono slope Pre-Engineered Metal Shelter with outdoor teaching area… | $185,400 |
| 2025-10-09 | Building | 200 W Hargett St | **COR PROJECT** Project consists of fitting up the 14th thru 16th floors of the … | $6,307,785 |
| 2025-09-16 | Building | 5109 Country Trl | The building is a pre-engineered and pre-fabricated structure provided by LB Fos… | $14,811 |
| 2025-08-19 | Building | 770 Dawkins Dr | New construction pre-fabricated 20' restroom building (4 restroom stalls). Inspe… | $9,045 |
| 2025-08-04 | Building | 105 Pullen Rd | **COR PROJECT** Complete the fitup of the the third flood shell space. The first… | $362,001 |
| 2025-07-01 | Building | 6121 Mt Herman Rd | Retaining Wall #12 | - |
| 2025-06-11 | Building | 605 Bailey Dr | The proposed public park consists of the construction of a 1,737 SF open-air pav… | $262,583 |