| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-06-01 | Building: Alteration and Addition | 53 Bow St | Reconstruct four newly renovated dorm suites, consisitng of fthree to four bedro… | $483,059 |
| 2022-10-26 | Building: Alteration and Addition | 54 Dunster St | Renovate the finishes of the 1st floor including flooring, wall covering and cel… | $449,544 |
| 2021-07-30 | Building: Alteration and Addition | 360 Mt Auburn St | Extend the existing Elevator at the East end of the building to facilitate acces… | $194,636 |
| 2020-10-28 | Building: Alteration and Addition | 1 Francis Ave | Renovate Two (2) Bathrooms on the 1st Floor. Work includes new Floor and wall ti… | $33,102 |
| 2020-03-03 | Building: Alteration and Addition | 33 Kirkland St | Frame out 6 offices in the 1st floor old Library area, install a kitchennette wi… | $183,960 |
| 2020-01-16 | Building: Alteration and Addition | 16 Divinity Ave | Renovate four office suite. Remove counters and interior windows. Relocate doors… | $64,085 |
| Building: Alteration and Addition | 1350 Massachusetts Ave | Renovate 3000 sq feet of office space on the 3rd floor north side. Remove and d… | $257,147 | |
| Building: Alteration and Addition | 36 Concord Ave | Replace 33 existing window sashes with Marvin Infinity insert double hung units… | $75,400 | |
| Building: Alteration and Addition | 24 Everett St | Upgrade electrical building system in three story dormitory by replacing all ol… | $122,619 | |
| Building: Alteration and Addition | 50 Church St | On third floor, room 308 install one layer of Sheet rock using resilient clips a… | $52,630 | |
| Building: Alteration and Addition | 14 Story St | Remove and replace the existing glass entry door on the Alley side to match exac… | $16,096 | |
| Building: Alteration and Addition | 1100 Massachusetts Ave | Refurbish 7 offices and their associated corridor by 2nd floor by removing and … | $104,086 | |
| Building: Alteration and Addition | 2 Arrow St | Nonstructural demolition of existing acoustical ceiling, no bearing partitions a… | $913,600 | |
| Building: Alteration and Addition | 8 Harvard Yard | remove and replace walls in the attic from the existing elevator machine room to… | $102,687 | |
| Building: Alteration and Addition | 33 Kirkland St | renovate 1740 sq ft of entry/computer lab and kitchenette space on the third flo… | $108,175 | |
| Building: Alteration and Addition | 26 Oxford St | Run new Chilled Water Supply and return pipes at ceiling of 1st fl. corridors fr… | $37,388 | |
| Building: Alteration and Addition | 1350 Massachusetts Ave | Remove non-bearing metal stud walls to reconfigure existing Offices. Remove and … | $213,106 | |
| Building: Alteration and Addition | 1350 Massachusetts Ave | Frame new metal stud walls to create 2 new office spaces in Room 550, repair ACT… | $24,230 | |
| Building: Alteration and Addition | 11 Divinity Ave | Renovate an existing wet laboratory room on the 5th floor. Including new lab si… | $192,983 | |
| Building: Alteration and Addition | 1350 Massachusetts Ave | Remove non-bearing metal stud partition walls, remove existing ACT and lighting,… | $138,863 | |
| Building: Alteration and Addition | 1350 Massachusetts Ave | 8th Floor Student Financial Services Offices.Remove select non bearing metal stu… | $49,293 |
Phone numbers, websites, license status, and CSV export — for all Cambridge contractors.
Subscribe — $149/moIs this your business? Get your free verified-permits badge →