| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-05-26 | Building: Alteration and Addition | 182 Memorial Dr | Demo existing lab, office and conferene room. Build new 2700 sqft conference roo… | $1,023,886 |
| 2025-07-11 | Building: Alteration and Addition | 330 Mt Auburn St | RENOVATION OF ONE EXISTING CATH LAB, PRIMARILY REPLACING EQUIPMENT AND EQUIPMENT… | $236,407 |
| 2025-01-15 | Building: Alteration and Addition | 250 Massachusetts Ave | Replace existing uninterruptible power systems (UPS) with new 400KW UPS (Penthou… | $844,290 |
| 2024-07-24 | Building: Alteration and Addition | 250 Massachusetts Ave | Work scope for this project consists of installation of a new rooftop emergency … | $1,447,468 |
| 2023-10-06 | Building: Alteration and Addition | 181 Massachusetts Ave | Work scope for this project includes minimal demo of existing electrical, new co… | $31,753 |
| 2023-08-17 | Building: Alteration and Addition | 330 Mt Auburn St | Renovation of basement level including removal of couple walls, etc, demo/ new M… | $1,626,000 |
| 2023-06-30 | Building: Alteration and Addition | 250 Massachusetts Ave | Interior Renovation consisting of minimal demo of existing interior partitions a… | $1,066,664 |
| 2023-03-21 | Building: Alteration and Addition | 330 Mt Auburn St | Demo and replace (4) cooling towers on Stanton Roof. No Fire Alarm or Sprinkler … | $439,000 |
| 2023-03-01 | Building: Alteration and Addition | 725 Concord Ave | Interior demolition and renovation to update MRI Suite. Renovations include MEP'… | $279,000 |
| 2023-03-01 | Building: Alteration and Addition | 330 Mt Auburn St | Demolition and Renovation of Radiation Therapy Suite that contains a Linac machi… | $355,000 |
| 2021-02-22 | Building: Alteration and Addition | 330 Mt Auburn St | Renovate existing Emergency Department to increase bed count and patient care/ s… | $7,475,000 |
| 2020-12-21 | Building: Alteration and Addition | 330 Mt Auburn St | Demo/ renovation for a new IT Closet, roughly 100sqft. Updated electrical, fire … | $54,200 |
| 2020-06-24 | Building: Alteration and Addition | 330 Mt Auburn St | Remove and replace existing roofing system, relocate mechanical, new electrical … | $1,204,700 |
| 2020-05-12 | Building: Alteration and Addition | 330 Mt Auburn St | Architectural upgrades to the 2nd floor of the Wyman Building (psychiatric ward)… | $193,000 |
| Building: Alteration and Addition | 330 Mt Auburn St | Renovation to South 5 including but not limited to architectural walls, new HVAC… | $850,000 | |
| Building: Alteration and Addition | 330 Mt Auburn St | Renovation of Wyman 1st floor for new GI Equipment. Includes architectural, plum… | $372,000 |