| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-06-25 | BACKFLOW PREMISE | 902 A ST SE | A ST DENTAL CLINIC Premise isolation backflow assembly | - |
| 2026-04-15 | ePermit | 1605 63RD AVE NE | install new 1" poly from meter to house. Will need to demo concrete in garage at… | $23,354 |
| 2026-04-13 | Building | 1605 63RD AVE NE | demo concrete in garage at main valve. Will need to areas to allow for direction… | $23,354 |
| 2025-12-02 | Building | 764 S 45TH ST | install new interior PEX piping | - |
| 2025-12-02 | Right-of-Way | 764 S 45TH ST | • Excavate a trench along the sidewalk and continue to bore under the driveway t… | $19,851 |
| 2025-12-01 | Utility Connection | 764 S 45TH ST | Replaced water line from meter to house at SFD. | $19,851 |
| 2025-12-01 | Building | 764 S 45TH ST | Interior PEX Installation | $6,726 |
| 2025-11-25 | Utility Connection | 4311 S 7TH ST | Remove and replace water line at SFD. No barricades, all on private property | $3,700 |
| 2025-11-24 | Utility Connection | 4311 S 7TH ST | Open trench replacement of sanitary sewer line at SFD. No barricades, no ROW, al… | $15,548 |
| 2025-11-21 | Utility Connection | 7049 S TRAFTON ST | Replace water line at SFD | $11,835 |
| 2025-11-21 | Building | 4311 S 7TH ST | Installation of Exterior Two-Way Clean-Out and Waste System Repipe | $15,548 |