Free Sugar Land Building Permit Lookup — Recent Permits & Contractors

You can look up recent building permits and the contractors on them for Sugar Land, TX free below. 622 building permits were filed in Sugar Land in the last 30 days. The most recent permits and the most active contractors are shown free, no signup — phone numbers, the full contractor list, property-owner contacts, and CSV export are available with a PermitGrab account.

Most active permit types (last 30 days): Electrical (139), Plumbing (133), HVAC (110).

Most recent permits in Sugar Land

DateAddressPermit typeContractor
2026-06-28 6415 Cool Water Building - Building Residential Above All Roofing And Construction
2026-06-28 1511 Fall Wood Building - Mechanical Residential Critical Air
2026-06-28 3407 Hillstone Building - Building Residential The United Construction Company
2026-06-28 7606 Hampden Building - Plumbing See Record
2026-06-28 203 Lombardy Building - Mechanical Residential Chilly Breeze
2026-06-28 7622 Broken Oak Building - Electrical John Jay Electrical Services, Inc.
2026-06-27 2110 Old Legend Building - Mechanical Residential One Hour Ac & Heating
2026-06-27 6506 Planetree Building - Mechanical Residential One Hour Ac & Heating
2026-06-27 4303 Oak Trail Building - Mechanical Residential Arktikos Ac And Heating
2026-06-26 2270 Lone Star Temporary Certificate Of Occupancy Beraht Construction

Showing the 10 most recent. The full Sugar Land feed updates daily.

Most active Sugar Land contractors (by permit count)

Names shown free. Verified phone numbers and the full contractor list are available with a PermitGrab account.

Unlock phone numbers + the full Sugar Land contractor list

Free here: recent permits and the top contractor names. With a PermitGrab account you also get verified phone numbers, every active contractor (not just the top 10), property-owner contacts, CSV export, and a daily email alert for new Sugar Land permits. Flat $149/mo · 14-day trial · never resold.

Start your free 14-day trial →

See the full Sugar Land feed on the Sugar Land permits page, or learn the method in how to get contractor leads from building permits.

Start 14-Day Trial →
14-day
14-day trial