Free Austin Building Permit Lookup — Recent Permits & Contractors

You can look up recent building permits and the contractors on them for Austin, TX free below. 4,413 building permits were filed in Austin in the last 30 days. The most recent permits and the most active contractors are shown free, no signup — phone numbers, the full contractor list, property-owner contacts, and CSV export are available with a PermitGrab account.

Most active permit types (last 30 days): Electrical (1268), Plumbing (1129), HVAC (1039).

Most recent permits in Austin

DateAddressPermit typeContractor
2026-06-28 5112 Ravensdale Ln Building Permit 2450 South Briggs, Llc
2026-06-28 4516 Seton Center Pkwy Unit 360 Electrical Permit Austin Capital Electric Llc
2026-06-28 5701 Lakemoore Dr Electrical Permit Led Es Electric
2026-06-28 4516 Seton Center Pkwy Unit 330 Electrical Permit Austin Capital Electric Llc
2026-06-28 1207 Perez St Bldg 2 Electrical Permit Chavez Electric
2026-06-28 1207 Perez St Bldg 1 Electrical Permit Chavez Electric
2026-06-28 1708 Collier St Bldg 2 Electrical Permit Lp General Services Contractor
2026-06-28 503 South Park Dr Electrical Permit Power-Up Electrical
2026-06-28 1708 Collier St Bldg 1 Electrical Permit Lp General Services Contractor
2026-06-28 7008 Beckett Rd Electrical Permit Watts Up Electric Llc.

Showing the 10 most recent. The full Austin feed updates daily.

Most active Austin contractors (by permit count)

Names shown free. Verified phone numbers and the full contractor list are available with a PermitGrab account.

Unlock phone numbers + the full Austin contractor list

Free here: recent permits and the top contractor names. With a PermitGrab account you also get verified phone numbers, every active contractor (not just the top 10), property-owner contacts, CSV export, and a daily email alert for new Austin permits. Flat $149/mo · 14-day trial · never resold.

Start your free 14-day trial →

See the full Austin feed on the Austin permits page, or learn the method in how to get contractor leads from building permits.

Start 14-Day Trial →
14-day
14-day trial