2026-06-11
Plumbing
—
—
TPR VCI RISE
—
☆ Save
2026-06-11
Plumbing
—
—
PLUMBING FOR TPRS26-00003 1 TOILET , 1 SHOWER , 1 SINK
—
☆ Save
2026-06-11
HVAC/Mech
—
—
2-22 TON MULTI ZONE MINI SPLIT, 1-24 TON MULTI ZONE MINI SPLIT, 1- 8 TON MULTI Z…
22 tons
mini-split
—
☆ Save
2026-06-11
HVAC/Mech
—
—
1-10 TON AC PACKAGE UNIT (REPLACEMENT)
10 tons
AC
replacement
HVAC replacement
—
☆ Save
2026-06-11
HVAC/Mech
—
—
3.5 TON SPLIT SYSTEM CONVERSION
3.5 tons
—
☆ Save
2026-06-11
Plumbing
—
—
1 BACKFLOW, 1 CONTROL VALVE, 19 DRIPS
—
☆ Save
2026-06-11
Fence
—
—
7' PRIVACY FENCE INSIDE PROPERTY LINE
—
☆ Save
2026-06-11
Electrical
—
—
3 TON SPLIT
3 tons
—
☆ Save
2026-06-11
Electrical
—
—
1-2TON SPLIT CONVERSION
2 tons
—
☆ Save
2026-06-11
HVAC/Mech
—
—
THE PROJECT SCOPE CONSISTS IN AN INTERIOR RENOVATION OF AN EXISTING PNC BRANCH. …
—
☆ Save
2026-06-11
Roofing
—
—
800 AMP SERVICE UPGRADE FOR 9715A, 9715B, 9717, 9719 AND 9721 CARNEGIE (ALL UNDE…
800A
service panel
Panel service
—
☆ Save
2026-06-11
Electrical
—
—
ATTACHED TO BCTI26-00024//////
—
☆ Save
2026-06-11
Electrical
—
—
BRINGING THE SERVICE UP TO CODE
—
☆ Save
2026-06-11
HVAC/Mech
—
—
adding 3 walls and 4 doors to an existing call center. minor modifications to el…
—
☆ Save
2026-06-11
Electrical
—
—
5-TON SPLIT UNIT CONVERSION 200AMPS SERVICE UPGRADE
200A
service panel
Panel service
—
☆ Save
2026-06-11
HVAC/Mech
—
—
TPRN TEXAS RB BUILDERS
—
☆ Save
2026-06-11
General Construction
—
—
Placement of storage container for residential ACCESSORY USE only 10'X40' in the…
residential
—
☆ Save
2026-06-11
General Construction
—
—
Residential Addition
—
☆ Save
2026-06-11
HVAC/Mech
—
—
MECHANICAL FOR BCTI25-00365 1-2 TON MINI SLIT SYSTEM
2 tons
—
☆ Save
2026-06-11
Temporary
—
—
CONSTRUCTION TRAILERS - OFFICE
—
☆ Save
2026-06-11
General Construction
—
6009 RUIDOSO DOWNS
New Residential
residential
New construction
—
☆ Save
2026-06-11
General Construction
—
1853 WAR PATH
New Residential
residential
New construction
—
☆ Save
2026-06-11
General Construction
—
14556 TIERRA NECTAR
New Residential
residential
New construction
—
☆ Save
2026-06-11
Plumbing
—
—
GAS LINE FOR AC UNIT NEW PERMIT FOR BPLG25-01169
line work
New installation
—
☆ Save
2026-06-11
HVAC/Mech
—
—
5-TON SPLIT UNIT CONVERSION
5 tons
—
☆ Save
2026-06-11
Commercial Shell
—
—
TENANT IMPROVEMENT FOR RESTAURANT, 1570 S.F. (FIRST TENANT)
—
☆ Save
2026-06-11
HVAC/Mech
—
—
1-2 TON AC MINI SPLIT (REPLACEMENT)
2 tons
AC, mini-split
replacement
HVAC replacement
—
☆ Save
2026-06-11
Electrical
—
—
200 AMPS SERVICE UPGRADE
200A
service panel
Panel service
—
☆ Save
2026-06-11
Roofing
—
—
A new residential dwelling to be built. Approximately 7,605 sq. ft. under roof w…
7,605 roof sf
New installation
New roof
—
☆ Save
2026-06-11
Plumbing
—
—
1-3 PAKCAGUE UNIT
—
☆ Save
2026-06-10
Plumbing
—
—
INSTALL GREASE TRAP
—
☆ Save
2026-06-10
HVAC/Mech
—
—
1 - 3.5 TON SPLIT CONVERSION
3.5 tons
—
☆ Save
2026-06-10
HVAC/Mech
—
—
5Ton
5 tons
—
☆ Save
2026-06-10
Fence
—
—
RAISE ROCKWALL IN STREET SIDE REAR WITH 2FT PILLARS 6FT MAX NEW ROCKWALL STREET …
—
☆ Save
2026-06-10
HVAC/Mech
—
—
HORSE STABLES
—
☆ Save
2026-06-10
Plumbing
—
—
Install Drip System
—
☆ Save
2026-06-10
Plumbing
—
—
1 - 3 TON UNIT
3 tons
—
☆ Save
2026-06-10
Structural
—
—
TRUMON DAVIDSON
—
☆ Save
2026-06-10
HVAC/Mech
—
—
1-2 TON PKG UNIT
2 tons
—
☆ Save
2026-06-10
Pool/Spa
—
—
NEW FIBERGLASS SWIMMING 10X20 IN THE REAR YARD
—
☆ Save
2026-06-10
General Construction
—
—
NEW DRIVEWAY UP TO 24FT MAX 2.5FT FROM RIGHTSIDE PROPERTY LINE NEW CONCRETE ON D…
—
☆ Save
2026-06-10
General Construction
—
—
MASTER PLAN 1613 A
1613A
—
☆ Save
2026-06-10
HVAC/Mech
—
—
BMEC TO BRAD26-00028 (2 TON PACKAGE UNIT, 5 OPENINGS, 1 TON MINISPLIT) A PROPOSE…
2 tons
mini-split
New installation
—
☆ Save
2026-06-10
Windows/Doors
—
—
remove and replace 7 windows - like for like (no structural changes)
like for like
replacement
HVAC changeout
—
☆ Save
2026-06-10
General Construction
—
—
REPAVING THE EXISTING ASPHALT SURFACE.
—
☆ Save
2026-06-10
Roofing
—
—
Reroof Permit
replacement
—
☆ Save
2026-06-10
Plumbing
—
—
ALA KEFK
—
☆ Save