Wilmington Building Permits & Property Data

Heads up: The current Wilmington records do not yet meet PermitGrab's source-published contractor coverage threshold. This page focuses on permit records and property data; market-level contractor data coverage isn't available for this city.

7,947 indexed permits · Wilmington, North Carolina.

PermitGrab Pro is a $149/mo subscription. 14-day Pro trial — choose your market first, then card required at checkout · cancel anytime before day 14.

Public-record project research, not a shared-lead marketplace. Use the permit, source date, and available fields to research the builder, project, or adjacent work before outreach. Cancel anytime in one click — no retention call.

Wilmington building permits — key stats
Newest permit 2026-10-02

PermitGrab tracks 7,947 building permits in Wilmington, NC as of 2026-10-02.

✓ Recent record dates

Record recency is based on available filing or issue dates; it does not verify publication time or collection delay.

Newest permit date:

PermitGrab Pro is a $149/mo subscription for current municipal permit, property, and code-violation records. The current records do not meet the source-published contractor-coverage threshold. This page focuses on the permit and property signals it does publish. 14-day Pro trial below — choose your market first, then card required at checkout · cancel anytime before day 14.

Filter Wilmington permits by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

Free weekly permit summary for Wilmington

One email a week with the newest Wilmington building permits — addresses, project details, and property activity where available. Free summary only — no credit card. Pro research tools require a separate 14-day trial with a card. Available fields vary by source. Unsubscribe anytime.

7,947
Indexed Permits
—
Contractor count unavailable
—
Property Owners · count unavailable
2026-10-05
Last Updated
Updated recently · 2026-10-02

🔔 Get Wilmington Permit Alerts

New permits and property activity sent when new public records are available.

📥 Export CSV 📊 Report

Published permit & code records

Permit data through 2026-10-02

7,947 permits sorted by date

⇄ Swipe or scroll to see address & contractor

Date Type Value Address Details Contractor / Status Save
2026-08-13 General Construction — — FLOODPLAIN/CHANGE OUT 3-TON SPLIT HEAT PUMP WITH 7.5 KW AND DUCTWORK. residential —
2026-08-13 General Construction — — The existing residential well servicing water to my home has stopped drawing wat… residential —
2026-08-13 General Construction — — remove old wiring and add wiring for 16 lights and 9 recpt. useing existing circ… residential —
2026-08-13 General Construction — — 36000btu package heat pump change out, Thermostat replacement and 8kw electric h… residential —
2026-08-13 General Construction — — REPLACE 2.5 TON PACKAGE UNIT - NO DUCTWORK - SAME SIZE - SAME LOCATION residential —
2026-08-13 Electrical $227,639 — Complete house wiring/ 200 AMPS/ General remodel - Full gut complete renovation 200A —
2026-08-13 General Construction — — FLOODPLAIN/ set lp tank and hp line to generator above ground tank residential —
2026-08-13 General Construction — — Goodman 3-1/2 Ton High-Efficiency Split System Heat Pump - 16.2 SEER2 - R-32. 8K… residential —
2026-08-13 General Construction — 3RD temporary for rally point —
2026-08-13 General Construction — — ABC building inspection for location currently holding ABC permits. Fire will be… commercial —
2026-08-13 General Construction — — FLOODPLAIN/D. O'Brien/Meade - Change out, like for like - Upstairs System: Insta… residential —
2026-08-13 General Construction — — Replacement of 2.5 Ton heat pump split system w/10kw heat strips residential —
2026-08-13 Electrical $4,879 — 240 amps/ Motts 17/18 - Construction of new well filter building. 240A New installation —
2026-08-13 General Construction — — FLOODPLAIN/4T Pkg HP w/10kw to existing duct & line voltage residential —
2026-08-13 General Construction — — Change out 1.5 ton heat pump and matching air handler with 5kw heat strips. commercial —
2026-08-13 General Construction — — ABC building inspection needed for new restaurant. Fire will be contacted and ha… commercial —
2026-08-13 General Construction — — *Includes materials, equipment, labor & required permits for the following: *Ins… commercial —
2026-08-13 General Construction — — Add 12K BTU mini split to garage residential —
2026-08-13 Plumbing $1,713,212 — Furnish labor, equipment, and materials necessary to complete the plumbing scope… —
2026-08-13 General Construction — — HVAC change out of a 1.5 ton split system, 5 KW's, 18,000 BTU residential —
2026-08-13 General Construction — — Installing from the existing gas line system a portable generator stub. residential —
2026-08-13 General Construction — — HVAC change out of a 5 ton split system, 10 KW's, 60,000 BTU residential —
2026-08-13 General Construction — — Applying for a new State ABC Permit commercial —
2026-08-13 Solar $25,615 — Installation of 29-panel, 10.121kW-AC rooftop solar PV system. 200A main service… 10.121 kW solar Solar PV —
2026-08-13 General Construction — — FLOODPLAIN/Wire existing residential boat dock 50amp 240volt sub panel Wire one … residential —
2026-08-13 General Construction — — change-out (one) 5 Ton PKG heat pump "like for like" 15kw commercial —
2026-08-13 Electrical $145,406 — New construction upfit retail bookstore with on-site beer & wine. —
2026-08-13 General Construction — — ROUGH IN NATURAL GAS LINE FOR KITCHEN APPLIANCES commercial —
2026-08-13 General Construction — — change out 3 ton split systems; 5 kw heat strips; no ductwork commercial —
2026-08-13 General Construction — — Change out 2 ton heat pump only. Serves the far east 1st floor corridor. commercial —
2026-08-13 General Construction — — FLOODPLAIN_Obrien to change out all accessible ductwork in the crawlspace. residential —
2026-08-13 General Construction — — Replace existing system with a 2 Ton 5kw multi stage heat pump split system. residential —
2026-08-12 General Construction — — HVAC change out of a 2 ton split system, 5 KW's, 24,000 BTU residential —
2026-08-12 Electrical $70,806 — Add an interior sub-panel in the new laundry room. Provide completely new wiring… —
2026-08-12 General Construction — — FLOODPLAIN - DORADO PLUMBING LLC - Relocate water heater and repair drain line u… residential —
2026-08-12 Electrical $3,500 — wire back porch for: 3 outlets 4 switches 1 celling fan 1 flood light —
2026-08-12 Electrical $38,602 — Add lights and fan to front porch//Extend the front porch the width of the house… —
2026-08-12 General Construction — — Change out of 4 24k mini split systems. commercial —
2026-08-12 General Construction — — Michael and son HVAC - Install a 1.5 ton split heat pump system with 5KW electri… residential —
2026-08-12 General Construction — — Out of water ×2 —
2026-08-12 Electrical $55,145 — Replacing vinyl siding, Beams and floor joists in the bathroom floor. Removing A… —
2026-08-12 General Construction — — FLOODPLAIN_Power pole for sign and irrigation commercial —
2026-08-12 General Construction — 7TH 200 amp service change out to a meter base combo commercial —
2026-08-12 General Construction — — CHANGE OUT LIKE FOR LIKE installing new ductwork in attic replacing all accessib… residential —
2026-08-12 General Construction — — HVAC CHANGE OUT, REMOVE AND REPLACE EXISTING SYSTEM. AIRHANDLER ONLY, RECONNECT … residential —
2026-08-12 General Construction — — FLOODPLAIN//Install 250 gallon underground propane tank and install gas piping t… residential —
2026-08-12 General Construction — — Changeout - like for like 3 Ton Split Hp with 7.5kw - attic ahu residential —
2026-08-12 General Construction — — installing a new dryer duct thru ceiling residential —
2026-08-12 General Construction — — FLOODPLAIN/ Installing whole home generator with 200 amp ATS residential —
Page 49 of 159 ← Prev 1 2 … 48 49 50 158 159 Next →
Permit Types in Wilmington
Construction Activity in Wilmington

New building permits in Wilmington, North Carolina show where construction activity is occurring. Filter the public records by trade, date, address, and project value to research active projects and property activity. Contractor lead coverage is not currently available for this city.

About Wilmington Building Permits

Wilmington, North Carolina processes building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 7947+ Wilmington building permits — newest permit date: 2026-10-05 from official city sources.

Each record can show the project address, scope, permit type, and value where the city publishes them. The source-published contractor records do not meet the coverage threshold for this city. PermitGrab does not represent this as contractor-contact coverage. Where property-owner records are available, they are matched to permit addresses separately.

How to use Wilmington permit data

Filter the current records by trade, date, address, or project value to research construction activity. The most useful workflow in this market is verifying the project signal first, then using the property data that is actually available for that address.

PermitGrab methodology · Page data current as of · Source: 2 public source feeds.

Who appears in Wilmington permit records?

PermitGrab indexes 7,947 building permits in Wilmington. New records appear as they are available from the source.

How fresh is Wilmington permit data?

The most recent permit indexed for Wilmington is dated 2026-10-02. Newest permit date: 2026-10-05. Permit records carry filing date, address, project value, and permit type, plus contractor name where the source publishes it. Use a recent published record for project research; it does not show bid availability or a request for service.

What construction appears in Wilmington permit records?

Wilmington permit activity covers 7,947 indexed permits. The records can cover new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, or tenant improvements. Their usefulness for a contractor or supplier depends on the published project details, timing, and service area.

How to look up Wilmington building permits

Search recent Wilmington, NC building permits by address, and permit type in the table above — pulled from the Wilmington building department's public permit records. New filings appear here as they are published. Filter by trade or search an address to look up a specific permit. For this week's filing volume, see the Wilmington Permit Pulse.

Nearby North Carolina Cities — explore building permits in other North Carolina cities

Monitor Wilmington permit & property activity

Email alerts when new public records are available for new permits and property activity. Source-published contractor coverage is not currently available for this city. Owner information is shown only where it can be matched from available public records.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Wilmington Building Permits

How many building permits does PermitGrab track in Wilmington?

PermitGrab currently tracks 7947 building permits in Wilmington, North Carolina. Data is pulled directly from the official municipal source on every collection cycle and includes permit number, address, permit type, status, estimated value, and contractor information where the source publishes it.

How fresh is the Wilmington permit data?

PermitGrab checks the official source on each collection cycle. The source date and its observed update cadence are shown above, so you can judge the data’s recency before acting on it.

How can contractors find construction leads in Wilmington?

Contractors can research Wilmington activity by filtering current permits by trade, location, and project type. Source-published contractor coverage is not currently available for this city. Property information is shown only where public records can be matched.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Wilmington — CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Source-published contractor coverage is not currently available for this city. Property information is available only where public records can be matched. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Wilmington permit data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Home service companies
An addition or remodel can be useful project context for HVAC, plumbing, or warranty outreach. Review the project signal before outreach.
Solar installers
Roof permits and electrical upgrades in Wilmington provide project context for solar-market research. Filter by the current project signal and verify ownership separately.
Insurance agents
Wilmington renovations can identify properties for a policy-review workflow. Confirm coverage needs independently before contacting a property owner.
Material suppliers & manufacturer reps
Choose a product-line research workflow, then use published job type, description, and value fields where available for territory and demand research. A permit is not a materials order, purchase signal, or open bid.
Developers & new construction
Sort source-published new-construction records by project value and type to research active projects and property activity.
Free resources

More on Wilmington & U.S. construction activity

Free permit tools
Permit lookup tools and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients Wilmington permit activity from public records — copy one line of HTML for your website.

More North Carolina permit data

Charlotte permits Raleigh permits Mecklenburg County permits Cary permits Fayetteville permits Asheville permits Pinehurst permits Greensboro permits Waxhaw permits New Bern permits

Comparing permit-data tools? See BuildZoom vs Shovels vs PermitGrab (2026) — how to compare market coverage, source freshness, and available record fields.

Choose your market →
Then finish
setup