Minneapolis Building Permits & Property Data

12,793 indexed permits · 8,601 code violations · Minneapolis, Minnesota.

PermitGrab Pro is a $149/mo subscription. 14-day Pro trial — choose your market first, then card required at checkout · cancel anytime before day 14.

Public-record project research, not a shared-lead marketplace. Use the permit, source date, and available fields to research the builder, project, or adjacent work before outreach. Cancel anytime in one click — no retention call.

Minneapolis building permits — key stats
Newest permit 2026-09-18

PermitGrab tracks 12,793 building permits in Minneapolis, MN as of 2026-09-18. 8,601 code violations in the same area, newest violation date 2026-09-21.

Recent record dates

Record recency is based on available filing or issue dates; it does not verify publication time or collection delay.

Newest permit date:

PermitGrab Pro is a $149/mo subscription for current municipal permit, property, and code-violation records. The current records do not meet the source-published contractor-coverage threshold. This page focuses on the permit and property signals it does publish. 14-day Pro trial below — choose your market first, then card required at checkout · cancel anytime before day 14.

Filter Minneapolis permits by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

Free weekly permit summary for Minneapolis

One email a week with the newest Minneapolis building permits — addresses, project details, and property activity where available. Free summary only — no credit card. Pro research tools require a separate 14-day trial with a card. Available fields vary by source. Unsubscribe anytime.

12,793
Indexed Permits
8,601
Code Violations
Property Owners · count unavailable
Heads up — limited source for this city This jurisdiction publishes a permit contact or applicant, not a contractor of record. Permit and public owner data remain available where the source provides them.
2026-09-21
Last Updated
Updated recently · 2026-09-18

🔔 Get Minneapolis Permit Alerts

New permits, violations and property activity sent when new public records are available.

📥 Export CSV 📊 Report

Published permit & code records

Permit data through 2026-09-18

12,793 permits sorted by date

⇄ Swipe or scroll to see address & contractor

Date Type Value Address Details Status Save
2026-07-28 Plumbing 425 12TH AVE SE
Owner: VIC··· 🔒
METER MOVE Q2 - 2026 BATCH 15
2026-07-28 Plumbing 613 32ND ST W
Owner: REA··· 🔒
METER MOVE Q2 - 2026 BATCH #13
2026-07-28 HVAC/Mech 5104 15TH AVE S
Owner: MAT··· 🔒
Relocate and replace upper level, revent main replacement
2026-07-28 Plumbing 4201 2ND AVE S
Owner: SAM··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 Plumbing 2406 31ST AVE S
Owner: NAO··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 Plumbing 2725 DUPONT AVE S
Owner: 272··· 🔒
METER MOVE Q2 - 2026 BATCH 17
2026-07-28 Plumbing 4205 10TH AVE S
Owner: DIA··· 🔒
METER MOVE Q2 - 2026 BATCH 15
2026-07-28 Plumbing 2617 DUPONT AVE S
Owner: SAL··· 🔒
METER MOVE Q2 - 2026 BATCH 17
2026-07-28 HVAC/Mech 1825 CLINTON AVE
Owner: EAR··· 🔒
INSTALL/ REPLACE DAIKIN FURNACE AND AIR CONDITIONER furnace replacement
2026-07-28 Plumbing 318 FRANKLIN AVE W
Owner: DAN··· 🔒
METER MOVE Q2 - 2026 BATCH #14
2026-07-28 Plumbing 5815 CLINTON AVE
Owner: JON··· 🔒
main valve replacement inside house replacement
2026-07-28 Plumbing 4218 FREMONT AVE S
Owner: BRI··· 🔒
gas to new 40,000 btu fireplace
2026-07-28 Plumbing 419 FRANKLIN AVE W
Owner: LHF··· 🔒
METER MOVE Q2 - 2026 BATCH #14
2026-07-28 HVAC/Mech 4221 21ST AVE S
Owner: ERI··· 🔒
Installing a one head ductless mini split system mini-split
2026-07-28 HVAC/Mech 2110 BRYANT AVE S
Owner: BRU··· 🔒
Provide four new main gas lines, provide proper reconnection to the main house c… New installation HVAC installation
2026-07-28 Plumbing 3319 26TH ST E
Owner: MAR··· 🔒
METER MOVE Q2 - 2026 BATCH 18
2026-07-28 Plumbing 2117 22ND ST E
Owner: TRE··· 🔒
METER MOVE Q2 - 2026 BATCH 17
2026-07-28 Plumbing 1930 GIRARD AVE S
Owner: FRE··· 🔒
METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 210 5TH AVE SE
Owner: LEO··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 Plumbing 3233 HARRIET AVE
Owner: KAT··· 🔒
METER MOVE Q2 - 2026 BATCH #11
2026-07-28 Plumbing 2450 BLAISDELL AVE
Owner: MNE··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 Plumbing 1422 MORGAN AVE N
Owner: LIN··· 🔒
METER MOVE Q2 - 2026 BATCH #12
2026-07-28 Roofing 4444 33RD AVE S
Owner: DEB··· 🔒
vent bath fan out roof
2026-07-28 Plumbing 2720 DUPONT AVE S
Owner: MIC··· 🔒
METER MOVE Q2 - 2026 BATCH 17
2026-07-28 Plumbing 3132 HARRIET AVE
Owner: DAV··· 🔒
METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 907 WEST BROADWAY
Owner: 905··· 🔒
METER MOVE Q2 - 2026 BATCH #14
2026-07-28 Plumbing 3511 39TH ST E
Owner: PRE··· 🔒
Kitchen remodel, gas line to range. line work
2026-07-28 Plumbing 2005 QUEEN AVE S
Owner: MAT··· 🔒
Replace Gas Dryer replacement
2026-07-28 Plumbing 2101 GRAND ST NE
Owner: ROB··· 🔒
METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 1322 SUMMIT AVE
Owner: JEA··· 🔒
METER MOVE Q2 - 2026 BATCH #12
2026-07-28 Plumbing 210 33RD ST W
Owner: DAN··· 🔒
METER MOVE Q2 - 2026 BATCH #13
2026-07-28 Plumbing 3128 HARRIET AVE
Owner: CHR··· 🔒
METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 116 32ND ST W
Owner: CHE··· 🔒
METER MOVE Q2 - 2026 BATCH #13
2026-07-28 Plumbing 1917 IRVING AVE S
Owner: BRI··· 🔒
METER MOVE Q2 - 2026 BATCH #12
2026-07-28 Plumbing 1116 7TH ST SE
Owner: DIN··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 Plumbing 1001 36TH ST W
Owner: MAU··· 🔒
Replace Gas Range replacement
2026-07-28 Plumbing 1019 6TH ST SE
Owner: ROM··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 HVAC/Mech 4000 WENTWORTH AVE
Owner: MIC··· 🔒
Mini-split mini-split
2026-07-28 Plumbing 516 28TH ST W
Owner: SAR··· 🔒
METER MOVE Q2 - 2026 BATCH #13
2026-07-28 Plumbing 3043 HARRIET AVE
Owner: LOR··· 🔒
METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 3204 HARRIET AVE
Owner: JON··· 🔒
METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 1785 DUPONT AVE S
Owner: MIC··· 🔒
METER MOVE Q2 - 2026 BATCH 17
2026-07-28 Plumbing 2708 BRYANT AVE S
Owner: VED··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 Plumbing 509 28TH ST W
Owner: ERI··· 🔒
METER MOVE Q2 - 2026 BATCH #13
2026-07-28 Plumbing 1421 WASHINGTON AVE S
Owner: FIR··· 🔒
METER MOVE Q2 - 2026 BATCH #14
2026-07-28 Plumbing 3113 HARRIET AVE
Owner: CHE··· 🔒
METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 3012 26TH ST E
Owner: CHA··· 🔒
METER MOVE Q2 - 2026 BATCH 18
2026-07-28 Plumbing 1919 GIRARD AVE S METER MOVE Q2 - 2026 BATCH #10
2026-07-28 Plumbing 2616 2ND AVE S
Owner: UPP··· 🔒
METER MOVE Q2 - 2026 BATCH 16
2026-07-28 Plumbing 1924 IRVING AVE S
Owner: MAT··· 🔒
METER MOVE Q2 - 2026 BATCH #12
Page 103 of 256 ← Prev 1 2 102 103 104 255 256 Next →

The public source does not publish reliable contractor-of-record names for Minneapolis. The source identifies a permit contact but not the contractor of record. Property-owner and permit details are still available below.

Permit Types in Minneapolis
Construction Activity in Minneapolis

New building permits in Minneapolis, Minnesota show where construction activity is occurring. Filter the public records by trade, date, address, and project value to research active projects and property activity. Contractor lead coverage is not currently available for this city.

About Minneapolis Building Permits

Minneapolis, Minnesota processes building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 12793+ Minneapolis building permits — newest permit date: 2026-09-18 from official city sources.

Each record can show the project address, scope, permit type, and value where the city publishes them. The source-published contractor records do not meet the coverage threshold for this city. PermitGrab does not represent this as contractor-contact coverage. Where property-owner records are available, they are matched to permit addresses separately.

How to use Minneapolis permit data

Filter the current records by trade, date, address, or project value to research construction activity. The most useful workflow in this market is verifying the project signal first, then using the property data that is actually available for that address.

PermitGrab methodology · Page data current as of · Source: Construction Code Services Permits - City of Minneapolis.

Who appears in Minneapolis permit records?

PermitGrab indexes 12,793 building permits in Minneapolis. New records appear as they are available from the source.

How fresh is Minneapolis permit data?

The most recent permit indexed for Minneapolis is dated 2026-09-18. Newest permit date: 2026-09-18. Permit records carry filing date, address, project value, and permit type, plus a permit contact where the source publishes it. Use a recent published record for project research; it does not show bid availability or a request for service.

What construction appears in Minneapolis permit records?

Minneapolis permit activity covers 12,793 indexed permits alongside 8,601 active code violations. The records can cover new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, or tenant improvements. Their usefulness for a contractor or supplier depends on the published project details, timing, and service area.

How to look up Minneapolis building permits

Search recent Minneapolis, MN building permits by address, and permit type in the table above — pulled from the Minneapolis building department's public permit records. New filings appear here as they are published. Filter by trade or search an address to look up a specific permit. For this week's filing volume, see the Minneapolis Permit Pulse.

Minneapolis Field Reports & Contractor Guides

Source-dated research and practical resources for contractors working in Minneapolis

Historical analysis · 2026-06-25

Minneapolis, MN Roofing Permit Leads: 428 Active Roofers, Phones Included (2026)

Historical market analysis and methodology for Minneapolis. Current permit activity and available source fields are shown on this page.

Read guide →
Historical analysis · 2026-06-16

Top Contractors in Minneapolis by Permit Volume (2026)

Historical market analysis and methodology for Minneapolis. Current permit activity and available source fields are shown on this page.

Read guide →
Historical analysis · 2026-06-16

Minneapolis Construction Activity Report — June 2026

Historical market analysis and methodology for Minneapolis. Current permit activity and available source fields are shown on this page.

Read guide →
Historical analysis · 2026-06-16

Busiest HVAC Contractors in Minneapolis (2026)

Historical market analysis and methodology for Minneapolis. Current permit activity and available source fields are shown on this page.

Read guide →
Historical analysis · 2026-06-17

HVAC & Plumbing Permit Leads in Minneapolis: 2,600 Mechanical Permits in 90 Days (2026)

Historical market analysis and methodology for Minneapolis. Current permit activity and available source fields are shown on this page.

Read guide →
Historical analysis · 2026-06-21

Minneapolis, MN Contractor List With Phone Numbers: Fresh Permit Leads (2026)

Historical market analysis and methodology for Minneapolis. Current permit activity and available source fields are shown on this page.

Read guide →
Historical analysis · 2026-06-25

Minneapolis, MN Plumbing Permit Leads: 424 Active Plumbers, Phones Included (2026)

Historical market analysis and methodology for Minneapolis. Current permit activity and available source fields are shown on this page.

Read guide →
Nearby Minnesota Cities — explore building permits in other Minnesota cities

Monitor Minneapolis permit & property activity

Email alerts when new public records are available for new permits and property activity. Source-published contractor coverage is not currently available for this city. Owner information is shown only where it can be matched from available public records.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Minneapolis Building Permits

How many building permits does PermitGrab track in Minneapolis?

PermitGrab currently tracks 12793 building permits in Minneapolis, Minnesota. Data is pulled directly from the official municipal source on every collection cycle and includes permit number, address, permit type, status, estimated value, and contractor information where the source publishes it.

How fresh is the Minneapolis permit data?

PermitGrab checks the official source on each collection cycle. The source date and its observed update cadence are shown above, so you can judge the data’s recency before acting on it.

How can contractors find construction leads in Minneapolis?

Contractors can research Minneapolis activity by filtering current permits by trade, location, and project type. Source-published contractor coverage is not currently available for this city. Property information is shown only where public records can be matched.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Minneapolis — CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Source-published contractor coverage is not currently available for this city. Property information is available only where public records can be matched. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Minneapolis permit data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Review published code-enforcement records with property context where linkage is available. A violation is a research signal, not evidence that an owner intends to sell.
Home service companies
An addition or remodel can be useful project context for HVAC, plumbing, or warranty outreach. Review the project signal before outreach.
Solar installers
Roof permits and electrical upgrades in Minneapolis provide project context for solar-market research. Filter by the current project signal and verify ownership separately.
Insurance agents
Minneapolis renovations can identify properties for a policy-review workflow. Confirm coverage needs independently before contacting a property owner.
Material suppliers & manufacturer reps
Choose a product-line research workflow, then use published job type, description, and value fields where available for territory and demand research. A permit is not a materials order, purchase signal, or open bid.
Developers & new construction
Sort source-published new-construction records by project value and type to research active projects and property activity.
Free resources

More on Minneapolis & U.S. construction activity

Free permit tools
Permit lookup tools and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients Minneapolis permit activity from public records — copy one line of HTML for your website.

More Minnesota permit data

Saint Paul permits Rochester permits Shakopee permits Maplewood permits Olmsted County permits

Comparing permit-data tools? See BuildZoom vs Shovels vs PermitGrab (2026) — how to compare market coverage, source freshness, and available record fields.

Choose your market →
Then finish
setup