Miami Beach Building Permits & Property Data

Heads up: Miami Beach's permit office does not publish contractor-of-record names. This page focuses on permit records and property data; market-level contractor data coverage isn't available for this city.

10,476 indexed permits · 9,400 code violations · Miami Beach, Florida.

PermitGrab Pro is a $149/mo subscription. 14-day Pro trial — choose your market first, then card required at checkout · cancel anytime before day 14.

Public-record project research, not a shared-lead marketplace. Use the permit, source date, and available fields to research the builder, project, or adjacent work before outreach. Cancel anytime in one click — no retention call.

Miami Beach building permits — key stats
Newest permit 2026-09-27

PermitGrab tracks 10,476 building permits in Miami Beach, FL as of 2026-09-27. 9,400 code violations in the same area, newest violation date 2026-09-28.

✓ Recent record dates

Record recency is based on available filing or issue dates; it does not verify publication time or collection delay.

Newest permit date:

PermitGrab Pro is a $149/mo subscription for current municipal permit, property, and code-violation records. This jurisdiction does not publish contractor-of-record data. This page focuses on the permit and property signals it does publish. 14-day Pro trial below — choose your market first, then card required at checkout · cancel anytime before day 14.

Filter Miami Beach permits by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

Free weekly permit summary for Miami Beach

One email a week with the newest Miami Beach building permits — addresses, project details, and property activity where available. Free summary only — no credit card. Pro research tools require a separate 14-day trial with a card. Available fields vary by source. Unsubscribe anytime.

10,476
Indexed Permits
—
Contractor count unavailable
9,400
Code Violations
—
Property Owners · count unavailable
2026-09-29
Last Updated
Updated recently · 2026-09-27

🔔 Get Miami Beach Permit Alerts

New permits, violations and property activity sent when new public records are available.

📥 Export CSV 📊 Report

Published permit & code records

Permit data through 2026-09-27

10,476 permits sorted by date

⇄ Swipe or scroll to see address & contractor

Date Type Value Address Details Contractor / Status Save
2026-09-08 General Construction — 2100 COLLINS AVE
Owner: CIT··· 🔒
This will be a corporate team building event for Think Hospitality. It will be t… ×2 —
2026-09-08 HVAC/Mech — 1330 WEST AVE Unit: 1904 Unit:1904 BCR2605110 ----- Replacement of exhaust fans in bathrooms, fan coil an… replacement HVAC replacement —
2026-09-08 General Construction — 1445 ALTON RD
Owner: VLA··· 🔒
Commercial commercial —
2026-09-08 General Construction — 720 E DI LIDO DR
Owner: MIK··· 🔒
walk in —
2026-09-08 General Construction — — Installation of a 249.75 LF of new Living seawall with one-bead riprap commercial —
2026-09-08 Electrical — 1234 EUCLID AVE Unit: 2 BCR2302726 // UNIT #: 2 // UPDATE ELECTRICAL DRAWINGS TO REFLECT EXISTING FIELD … —
2026-09-08 Windows/Doors — 947 LENOX AVE Unit: 603 BC2628621---Replacement of Windows/Doors —
2026-09-08 Plumbing — 755 JEFFERSON AVE
Owner: JEF··· 🔒
Pre Master Plans bc2423056// IRRIGATION System —
2026-09-08 Electrical — 1830 MERIDIAN AVE
Owner: AME··· 🔒
PO-C2600399/Pool ladder bonding connection —
2026-09-08 General Construction — 5681 PINE TREE DR
Owner: 568··· 🔒
ELR2605926---TEMP FOR CONSTRUCTION MASTER BR 2611509 —
2026-09-08 HVAC/Mech — 1330 WEST AVE Unit: 3101 BCR2403600 // Unit 3101 // mechanical sub —
2026-09-08 General Construction — 80 S S HIBISCUS DR
Owner: 80 ··· 🔒
"TECO PEOPLES GAS - New Gas Service installation to comply with the Florida Publ… —
2026-09-08 Plumbing — 1776 JAMES AVE Unit: 5B BCR2605154 --- Plumbing per plans, tub to shower replacement, vanity replacement… tankless replacement Water heater —
2026-09-08 Roofing — 1300 LENOX AVE
Owner: FIF··· 🔒
RE-ROOFING NEW ROOFING TILES replacement Re-roof —
2026-09-08 HVAC/Mech — 945 79 TER
Owner: LAI··· 🔒
REQUEST FOR 180-DAY EXTENSION OF MECHANICAL SUB-PERMIT MEC2504798. ASSOCIATED ME… —
2026-09-08 HVAC/Mech — 1201 20 ST Unit: PH08 ACC2607494-----A/C Exact Change Out —
2026-09-08 Demolition — 5208 ALTON RD
Owner: BOM··· 🔒
Thunder Demolition: Total demolition of existing SFR at 5208 Alton Rd. —
2026-09-08 General Construction — 5600 COLLINS AVE
Owner: REF··· 🔒
LOBBY BATHROOM REMODEL —
2026-09-08 Windows/Doors — 4595 MERIDIAN AVE
Owner: RIC··· 🔒
BR2611985 ----INSTALL NEW WINDOWS (11 OPENING) —
2026-09-08 HVAC/Mech — 1032 MICHIGAN AVE
Owner: MLB··· 🔒
Interior Remodeling - 5 Units This includes, building, plumbing, electrical, mec… 5 units commercial —
2026-09-08 Plumbing — 1330 WEST AVE Unit: 1904 BCR2605110/Unit 1904 // Replace existing floor, addition and elimination of door… replacement —
2026-09-08 General Construction — 5775 COLLINS AVE PRR-2026-3058 All permit applications, issued permits, inspection records, , TCO… —
2026-09-08 Roofing — 4800 LAKEVIEW DR
Owner: SAN··· 🔒
re roof steep slope metal roof metal replacement Re-roof —
2026-09-08 HVAC/Mech — 4550 JEFFERSON AVE
Owner: JEF··· 🔒
TCO - BR2206961 - SINGLE FAMILY RESIDENCE New Single Family Residence RV2423420 … residential New construction —
2026-09-07 Roofing — 1787 NORMANDY DR
Owner: HUM··· 🔒
shop-drawing – floor and roof joists —
2026-09-07 General Construction — 1130 OCEAN DR
Owner: CIT··· 🔒
COMMERICAL FOR The City of Miami Beach and The Greater Miami Convention & Visito… —
2026-09-07 Structural — 795 LAKEVIEW DR
Owner: STE··· 🔒
Architectural, MEP, Civil, and Structural Plans from 2022 renovation and additio… —
2026-09-07 HVAC/Mech — 752 EUCLID AVE Unit: 10 Exact Ac Change ut commercial —
2026-09-07 Plumbing — 1034 JEFFERSON AVE
Owner: JEF··· 🔒
PLC2613545-------------REMOVE AND REPLACE EXISTING 76-GALLON, 199,000 BTU GAS WA… 199,000 BTU like for like replacement HVAC changeout —
2026-09-07 Roofing — 441 E E RIVO ALTO DR
Owner: ATL··· 🔒
BR2409169 - Rooftop Railing - MTCI Private Provider Review and Inspections- BSPR… —
2026-09-07 General Construction — 2035 WASHINGTON AVE Unit: ROW CG SUNNY ISLES LLC - 400 BLK OF 21 STREET —
2026-09-07 General Construction — 401 71ST ST
Owner: PUM··· 🔒
BC2628618 (----------------Suncoco Conversion- Reface pole sign, new canopy fasc… —
2026-09-07 General Construction — 211 E E RIVO ALTO DR
Owner: NEL··· 🔒
all floor plans, survey, elevations —
2026-09-07 Temporary — 1759 PURDY AVE
Owner: SUN··· 🔒
BC2627642/temp power —
2026-09-07 Fire Protection — 90 ALTON RD Unit: 1712 Modification of existing fire sprinkler system within unit 1712, including reloc… sprinkler —
2026-09-07 Roofing — 1401 MERIDIAN AVE Unit: ROW T & S Roofing System: Occupy city ROW to close the sidewalk and parking Lane at … —
2026-09-07 Plumbing — 1849 JAMES AVE
Owner: DEC··· 🔒
Change of use of 34-unit apt buildings to 46-unit hotel, convert two bathrooms t… line work New installation —
2026-09-07 General Construction — 551 MICHIGAN AVE Unit: 125 Copy of the current Certificate of Occupancy of the building. —
2026-09-07 General Construction — 1425 COLLINS AVE
Owner: 142··· 🔒
Mail Express —
2026-09-07 General Construction — 1000 S S POINTE DR Unit: 2901 Permit extension for master permit: BCR2504148 —
2026-09-07 HVAC/Mech — 1460 MARSEILLE DR
Owner: MAH··· 🔒
We are requesting copies of all architectural drawings for this house. All docum… —
2026-09-07 General Construction — 1735 MERIDIAN AVE 1735 MERIDIAN AVE,Unit 701, Miami Beach, FL 33139 —
2026-09-07 Roofing — 830 9 ST
Owner: DCC··· 🔒
REROOF FLACK DECKS USING TPO SYSTEM tpo replacement Re-roof —
2026-09-07 Fire Protection — 4300 ALTON RD
Owner: MOU··· 🔒
ADD/RLC 47 FIRE SPRINKLERS sprinkler —
2026-09-07 Windows/Doors — — SK8 ICON South Beach Roller Skate Social Event. A community-focused outdoor roll… —
2026-09-06 Fence — 1375 N N BISCAYNE POINT RD
Owner: 137··· 🔒
BR2611983----------------New construction of a two story single family residence… 2-story residential —
2026-09-06 Fire Protection — 3790 ROYAL PALM AVE
Owner: YEH··· 🔒
SBH JEWISH COMMUNITY FESTIVAL —
2026-09-05 General Construction — 7929 ABBOTT AVE Unit: ROW PUBLIC WORK - 7900 BLK ABBOT AVE, 300-400 BLK OF 80TH STREET —
2026-09-05 General Construction — 6801 COLLINS AVE Private engagement proposal on the open sand. Four people total: the couple, one… —
Page 53 of 210 ← Prev 1 2 … 52 53 54 209 210 Next →
Permit Types in Miami Beach
Construction Activity in Miami Beach

New building permits in Miami Beach, Florida show where construction activity is occurring. Filter the public records by trade, date, address, and project value to research active projects and property activity. This jurisdiction does not publish contractor-of-record names in its permit feed.

About Miami Beach Building Permits

Miami Beach, Florida processes building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 10476+ Miami Beach building permits — newest permit date: 2026-09-29 from official city sources.

Each record can show the project address, scope, permit type, and value where the city publishes them. Miami Beach does not publish contractor business names in this feed. PermitGrab does not represent this as contractor-contact coverage. Where property-owner records are available, they are matched to permit addresses separately.

How to use Miami Beach permit data

Filter the current records by trade, date, address, or project value to research construction activity. The most useful workflow in this market is verifying the project signal first, then using the property data that is actually available for that address.

PermitGrab methodology · Page data current as of · Source: Public permit portal.

Who appears in Miami Beach permit records?

PermitGrab indexes 10,476 building permits in Miami Beach. New records appear as they are available from the source.

How fresh is Miami Beach permit data?

The most recent permit indexed for Miami Beach is dated 2026-09-27. Newest permit date: 2026-09-29. Permit records carry filing date, address, project value, and permit type, plus contractor name where the source publishes it. Use a recent published record for project research; it does not show bid availability or a request for service.

What construction appears in Miami Beach permit records?

Miami Beach permit activity covers 10,476 indexed permits alongside 9,400 active code violations. The records can cover new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, or tenant improvements. Their usefulness for a contractor or supplier depends on the published project details, timing, and service area.

How to look up Miami Beach building permits

Search recent Miami Beach, FL building permits by address, and permit type in the table above — pulled from the Miami Beach building department's public permit records. New filings appear here as they are published. Filter by trade or search an address to look up a specific permit. For this week's filing volume, see the Miami Beach Permit Pulse.

Nearby Florida Cities — explore building permits in other Florida cities

Monitor Miami Beach permit & property activity

Email alerts when new public records are available for new permits and property activity. This jurisdiction’s feed does not publish contractor contacts. Owner information is shown only where it can be matched from available public records.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Miami Beach Building Permits

How many building permits does PermitGrab track in Miami Beach?

PermitGrab currently tracks 10476 building permits in Miami Beach, Florida. Data is pulled directly from the official municipal source on every collection cycle and includes permit number, address, permit type, status, estimated value, and contractor information where the source publishes it.

How fresh is the Miami Beach permit data?

PermitGrab checks the official source on each collection cycle. The source date and its observed update cadence are shown above, so you can judge the data’s recency before acting on it.

How can contractors find construction leads in Miami Beach?

Contractors can research Miami Beach activity by filtering current permits by trade, location, and project type. This jurisdiction does not publish contractor-of-record names. Property information is shown only where public records can be matched.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Miami Beach — CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. This city’s municipal feed does not publish contractor contacts. Property information is available only where public records can be matched. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Miami Beach permit data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Review published code-enforcement records with property context where linkage is available. A violation is a research signal, not evidence that an owner intends to sell.
Home service companies
An addition or remodel can be useful project context for HVAC, plumbing, or warranty outreach. Review the project signal before outreach.
Solar installers
Roof permits and electrical upgrades in Miami Beach provide project context for solar-market research. Filter by the current project signal and verify ownership separately.
Insurance agents
Miami Beach renovations can identify properties for a policy-review workflow. Confirm coverage needs independently before contacting a property owner.
Material suppliers & manufacturer reps
Choose a product-line research workflow, then use published job type, description, and value fields where available for territory and demand research. A permit is not a materials order, purchase signal, or open bid.
Developers & new construction
Sort source-published new-construction records by project value and type to research active projects and property activity.
Free resources

More on Miami Beach & U.S. construction activity

Free permit tools
Permit lookup tools and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients Miami Beach permit activity from public records — copy one line of HTML for your website.

More Florida permit data

Miami-Dade County permits Orlando Metro permits Orlando permits Tampa permits DeFuniak Springs permits Polk County permits Ocala permits Cape Coral permits Fort Lauderdale permits Brevard County permits

Comparing permit-data tools? See BuildZoom vs Shovels vs PermitGrab (2026) — how to compare market coverage, source freshness, and available record fields.

Choose your market →
Then finish
setup