Clearwater Building Permits & Project Research

Looking to apply for a permit with Clearwater, FL, or see its published plan-review target dates?

Official city links, checked 2026-10-07. PermitGrab publishes public permit records for research; it is not the city's permitting office.

5,062 indexed permits · 1,040 contractor names in the last 90 days · Clearwater, Florida.

PermitGrab Pro is a $149/mo subscription. 14-day Pro trial — choose your market first, then card required at checkout · cancel anytime before day 14.

Public-record project research, not a shared-lead marketplace. Use the permit, source date, and available fields to research the builder, project, or adjacent work before outreach. Cancel anytime in one click — no retention call.

Clearwater building permits — key stats
Active contractors 1,040
Newest permit 2026-11-04

PermitGrab tracks 5,062 building permits in Clearwater, FL as of 2026-11-04, including 1,040 active contractors identified from filings in the last 90 days.

✓ Recent record dates

Record recency is based on available filing or issue dates; it does not verify publication time or collection delay.

Newest permit date:

PermitGrab Pro is a $149/mo subscription for current municipal permit, property, and code-violation records. In this market, that includes contractor records from the official municipal feed. 14-day Pro trial below — choose your market first, then card required at checkout · cancel anytime before day 14.

Filter Clearwater permits by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

Free weekly permit summary for Clearwater

One email a week with the newest Clearwater building permits — contractors, addresses, and project values. Free summary only — no credit card. Pro research tools require a separate 14-day trial with a card. Available fields vary by source. Unsubscribe anytime.

5,062
Indexed Permits
1,040
Contractor names (90 days)
104
Property Owners · 2% of permit addresses
2026-11-04
Last Updated
Source date: 2026-11-04
📊 View Clearwater source-dated permit records →

🔔 Get Clearwater Permit Alerts

New permits, and contractor activity sent when new public records are available.

📥 Export CSV 📊 Report

Published permit & code records

Permit data through 2026-11-04
Address and project value are not shown in the Clearwater permit records displayed below — they appear as “—”; availability varies by record. Contractor name and phone availability also varies by record.
🔎 See for yourself — free: click any Reveal button to unmask up to 10 real contractor phone numbers. No account needed.

5,062 permits sorted by date

Project value is blank on every record displayed here, so the Value column is omitted.

⇄ Swipe or scroll to see address & contractor

Date Type Address Details Contractor / Status Save
2026-06-12 General Construction
Source type: Building - Construction Permit
— Building - Construction Permit —
2026-06-12 Electrical
Source type: Building - Construction Permit
— 150 Amp panels replacement inside garage and outside 150A replacement —
2026-06-12 Interior Renovation
Source type: Building - Construction Permit
— MASTER AND UPSTAIR BATHROOM REMODEL Homeowner permit
2026-06-12 Landscaping & Exterior
Source type: Building - Construction Permit
— Online Permit - Concrete Driveway corrections as well as sloped walkway replacem… 502A replacement —
2026-06-12 Electrical
Source type: Building - Over the Counter Permit
— 150 Amp panel replacement inside garage and outside 150A replacement —
2026-06-12 Solar
Source type: Building - Over the Counter Permit
— Lovekamp - New Solar PV Install solar —
2026-06-12 Plumbing
Source type: Building - Over the Counter Permit
— Online Permit - reinstall existing gas water heater to code gas —
2026-06-12 General Construction
Source type: Building/Enforcement/Stop Work Order/SWO
— Possible stucco work without a permit —
2026-06-12 Fire Protection
Source type: Building - Fire
— Installing underground fire line —
2026-06-12 HVAC
Source type: Building - Plan Amendment Application (Online)
— HVAC equal changeout 2head minispit replacement —
2026-06-11 Plumbing
Source type: Building - Over the Counter Permit
— Online Permit - 28GAL ELEC WATER HEATER REPLACEMENT standard replacement FLORIDA DELTA MECHANICAL INC
📞 (•••) •••-••••
2026-06-11 General Construction
Source type: Building - Plan Amendment Application (Online)
— Online Permit - Revisions to Plans SERITAGE SRC FINANCE LLC
📞 (•••) •••-••••
2026-06-11 Demolition
Source type: Building - Construction Permit
— Online Permit - Demolition of concrete sidewalk along N Ft Harrison Ave side of … COURNOYER CONSTRUCTION INC
📞 (•••) •••-••••
2026-06-11 Windows & Doors
Source type: Building - Construction Permit
— Online Permit - replacing 16 windows and 2 sliding glass doors, size for size an… DOORS, LLC
Contact details pending
2026-06-11 Roofing
Source type: Building - Construction Permit
— Online Permit - ROOF MOUNTED PV SOLAR SYSTEM INSTALLATION —
2026-06-11 HVAC
Source type: Building - Construction Permit
— Online Permit - HVAC equal changeout 2head minispit & ductwork replacement replacement COOL COMFORT HEATING AND COOLING, LLC
📞 (•••) •••-••••
2026-06-11 Electrical
Source type: Building - Construction Permit
— Online Permit - REPLACE CLOTH WIRING PANEL UPGRADE 150A TO 200A 150A service panel replacement HPA II BORROWER 2021-1 LLC
📞 (•••) •••-••••
2026-06-11 HVAC
Source type: Building - Over the Counter Permit
— Online Permit - Install 1.5-2 Ton Condo System (Air Handler,Condenser) 2 tons AC New installation —
2026-06-11 Landscaping & Exterior
Source type: Building - Construction Permit
— Online Permit - REPLACE 101LF OF EXISTING 4' HIGH CHAINLINK FENCE WITH 4' HIGH B… —
2026-06-11 HVAC
Source type: Building - Construction Permit
— REMOVE AND REPLACE 33SQ OF SHINGLES replacement —
2026-06-11 HVAC
Source type: Building - Over the Counter Permit
— Online Permit - ECO 5 ton 18 seer heat pump split system (Air Handler,Condenser) 5 tons 18 SEER AC, heat pump —
2026-06-11 Interior Renovation
Source type: Building - Construction Permit
— Online Permit - Bathroom Remodel —
2026-06-11 Signage
Source type: Building - Construction Permit
— Online Permit - Interior commercial business office tenant remodel, with typical… fire protection W R I COUNTRYSIDE CENTRE LLC
2026-06-11 Plumbing
Source type: Building - Over the Counter Permit
— Online Permit - Install low 30 gallon water heater standard New installation —
2026-06-11 General Construction
Source type: Building - Plan Amendment Application (Online)
— Online Permit - We went from TJI system to System 42 Trusses —
2026-06-11 Plumbing
Source type: Building - Over the Counter Permit
— Online Permit - 40GAL ELEC WATER HEATER REPLACEMENT standard replacement —
2026-06-11 Interior Renovation
Source type: Building - Construction Permit
— Master bathroom R&R. Remove tub and replace new. Remove toilet and replace new. … —
2026-06-11 Windows & Doors
Source type: Building - Construction Permit
— Online Permit - Remove and replace existing windows and doors. Impact Resistant-… —
2026-06-11 Roofing
Source type: Building - Construction Permit
— Online Permit - removing existing shingle roof down to deck, replacing bad decki… shingle New installation —
2026-06-11 General Construction
Source type: Building - Construction Permit
— Online Permit - SWO2025-04036 Code Compliance Municipal Code Enforcement Board C… —
2026-06-11 Plumbing
Source type: Building - Over the Counter Permit
— Online Permit - Install tankless gas water heater with connections and piping in… tankless New installation —
2026-06-11 Plumbing
Source type: Building - Over the Counter Permit
— Online Permit - Remove existing water heater and install like for like 40 gallon… standard replacement —
2026-06-11 HVAC
Source type: Building - Over the Counter Permit
— Online Permit - ECO 3 TON AC (Air Handler,Condenser) 3 tons AC —
2026-06-11 Electrical
Source type: Building - Over the Counter Permit
— Online Permit - 200 Amp Main Electrical Panel Ugrade (Upgrade Service) 200A —
2026-06-11 General Construction
Source type: Building - Over the Counter Permit
— Online Permit - Reinstall existing w/h to code. —
2026-06-11 General Construction
Source type: Building - Over the Counter Permit
— Building - Over the Counter Permit —
2026-06-11 Windows & Doors
Source type: Building - Plan Amendment Application (Online)
— Online Permit - Change to interior layout of house. No loadbearing walls affecte… —
2026-06-11 HVAC
Source type: Building - Over the Counter Permit
— Online Permit - Equal change out of air handler and condenser (Air Handler,Conde… AC replacement —
2026-06-11 HVAC
Source type: Building - Construction Permit
— Online Permit -PP FOR INSPECTIONS 5 TON UNIT WITH 5KW HVAC CHANGEOUT--LIKE FOR L… 5 tons replacement —
2026-06-11 HVAC
Source type: Building - Construction Permit
— Online Permit - Replacing 11 windows, size for size and impact. —
2026-06-11 General Construction
Source type: Building - Plan Amendment Application (Online)
— Online Permit - Revison to plans —
2026-06-11 HVAC
Source type: Building - Construction Permit
— Online Permit - Installing 100' of 6' tall chainlink-black fence & moving gate l… —
2026-06-11 HVAC
Source type: Building - Construction Permit
— Online Permit - A/C Change Out: Remove Trane 20 ton and install Daikin 20 tons AC replacement —
2026-06-11 HVAC
Source type: Building - Over the Counter Permit
— Online Permit - Equal change out. Install Carrier 4 ton two stage heat pump w/ 8… 4 tons AC, heat pump replacement —
2026-06-11 HVAC
Source type: Building - Construction Permit
— Online Permit - INSTALL 606 LF OF 6' HIGH PVC FENCING GOOD SIDE FACING OUT New installation HVAC installation —
2026-06-11 HVAC
Source type: Building - Over the Counter Permit
— Online Permit - HVAC ECO (Air Handler,Condenser) AC —
2026-06-11 Electrical
Source type: Building - Over the Counter Permit
— Online Permit - Add Circuits in Kitchen (Add Outlets/Circuits) —
2026-06-11 Roofing
Source type: Building - Construction Permit
— Online Permit - (UNDER300K,1945) Tear off and reroof single family shingle roof shingle tear off replacement —
2026-06-11 Electrical
Source type: Building - Over the Counter Permit
— Online Permit - Wire and power up existing boat lift (Add Outlets/Circuits) —
2026-06-11 Plumbing
Source type: Building - Over the Counter Permit
— Online Permit - Install Expansion Tank on Water Heater standard New installation —
Page 96 of 102 ← Prev 1 2 … 95 96 97 101 102 Next →
Permit Types in Clearwater
Construction Activity in Clearwater

New building permits in Clearwater, Florida show where construction activity is being recorded. Contractors can filter the available public records by trade, date, address, and project value to research projects and plan outreach using the fields the source publishes.

About Clearwater Building Permits

Clearwater, Florida processes building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 5,062+ Clearwater building permits — newest permit date: 2026-11-04 from official city sources.

Building permits in Clearwater can document new construction, renovations, and specialty work. The fields in a public record vary by filing, but may include a project address, scope, estimated cost, or contractor name. Use the displayed source information to evaluate whether a record is useful for your market research.

How Contractors Use Clearwater Permit Data

HVAC contractors, electricians, plumbers, and roofers can use Clearwater building-permit records to research visible construction activity. A permit may signal a project that is relevant to a particular trade, but the source record does not establish that its owner is seeking a bid.

Use the published date, project details, and any named business contact to research a project before outreach. Public records are not exclusive, and outreach results depend on the market, project, and your own process.

Eligible subscribers can receive trade-filtered alerts when new records are collected. Alert timing and field coverage follow the underlying source rather than a universal schedule.

PermitGrab methodology · Page data current as of · Source: Building Permits via Accela Citizen Access.

Who appears in Clearwater permit records?

PermitGrab indexes 5,062 building permits in Clearwater. New records appear as they are available from the source. Each permit is matched against 104 property-owner records for direct outreach.

How fresh is Clearwater permit data?

The most recent permit indexed for Clearwater is dated 2026-11-04. Newest permit date: 2026-11-04. Permit records carry filing date and permit type, plus contractor name where the source publishes it; address and project value are not shown in the records currently displayed for this source. Use a recent published record for project research; it does not show bid availability or a request for service.

What construction appears in Clearwater permit records?

Clearwater permit activity covers 5,062 indexed permits. The records can cover new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, or tenant improvements. Their usefulness for a contractor or supplier depends on the published project details, timing, and service area.

1 workflow for Clearwater research

Start with the published project record.

🕵️

The project-team lookup

Search a business name to review its recorded permit activity in Clearwater and the project details the public source publishes. Use the scope, timing, and address to research complementary work; a record is not a request for bids.

Research Clearwater project activity — Pro $149/mo

How to look up Clearwater building permits

Search recent Clearwater, FL building permits by description, contractor, and permit type in the table above — pulled from the Clearwater building department's public permit records. New filings appear here as they are published. Filter by trade or search a description to look up a specific permit. For this week's filing volume and the most active contractors, see the Clearwater Permit Pulse.

Clearwater Field Reports & Contractor Guides

Source-dated research and practical resources for contractors working in Clearwater

Historical analysis · 2026-06-19

Clearwater FL Contractor Permit Leads With Phone Numbers (2026)

Historical market analysis and methodology for Clearwater. Current permit activity and available source fields are shown on this page.

Read guide →
Nearby Florida Cities — explore building permits in other Florida cities

Research Clearwater project activity

Email alerts when new public records are available for newly published permits and recorded project-team activity. Contact details are shown only where the public source publishes them. 14-day Pro trial for alerts — card required; Pro $149/mo unlocks full available records.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Clearwater Building Permits

How many building permits does PermitGrab track in Clearwater?

PermitGrab currently tracks 5,062 building permits in Clearwater, Florida. Data is pulled directly from the official municipal source on every collection cycle and includes permit number, address, permit type, status, estimated value, and contractor information where the source publishes it.

How fresh is the Clearwater permit data?

PermitGrab checks the official source on each collection cycle. The source date and its observed update cadence are shown above, so you can judge the data’s recency before acting on it.

How can contractors find construction leads in Clearwater?

Contractors find leads in Clearwater by filtering PermitGrab by trade and ZIP code, then researching the recorded contractor and project activity. Contact details appear only where a public record includes them; saved-search email alerts track new matching records as they are published.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Clearwater — CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Contractor phone and website reveals are included where source-published. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Clearwater permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Contractors & subs
Recent Clearwater contractor activity is a signal for labor and material demand. Contact details appear only where the public source publishes them.
Home service companies
An addition or remodel can be useful project context for HVAC, plumbing, or warranty outreach. Owner records are available where public data can be matched.
Solar installers
Roof permits and electrical upgrades in Clearwater provide project context for solar-market research. Owner-occupancy data is available where public records can be matched.
Insurance agents
Clearwater renovations can identify properties for a policy-review workflow. Confirm coverage needs independently before contacting a property owner.
Material suppliers & manufacturer reps
Choose a product-line research workflow, then use published job type, description, and value fields where available for territory and demand research. A permit is not a materials order, purchase signal, or open bid.
Developers & new construction
Sort source-published new-construction records by project value and type to research active projects and property activity, with contractor details where the record publishes them.
Free resources

More on Clearwater & U.S. construction activity

Free permit tools
Permit lookup tools and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients Clearwater permit activity from public records — copy one line of HTML for your website.

More Florida permit data

Miami-Dade County permits Orlando Metro permits Miami Beach permits Orlando permits Tampa permits Walton County permits Polk County permits Marion County permits Cape Coral permits Fort Lauderdale permits

Comparing permit-data tools? See BuildZoom vs Shovels vs PermitGrab (2026) — how to compare market coverage, source freshness, and available record fields.

Choose your market →
Then finish
setup