Golden Electrical Market Overview
Golden's electrical permit activity is currently slowing, with 34 permits filed in the last 30 days compared to 55 in the prior 30-day window. On average, 29.8 electrical permits are filed per month here based on the last six months of data.
Recent Electrical Permits in Golden
| Date | Address | Description | Status |
|---|---|---|---|
| 2026-09-18 | 300 DeFRANCE DRIVE | Installing a gas line from meter to generator 1-30... | Pending |
| 2026-09-17 | 1680 F STREET | 1. Hand excavate trench from utility meter bank to... | Inspection Phase |
| 2026-09-16 | 2130 BONVUE DRIVE | Xcel Energy identified a pressure drop during repl... | Closed - Complete |
| 2026-09-16 | 222 PIKE STREET | Install 200 Amp Load Center. Panel Installation: I... | Fees Due |
| 2026-09-15 | 228 BERTHOUD WAY | Replace most windows Add bedroom and bathroom to b... | Additional Info Required |
| 2026-09-15 | 310 C STREET | swapping out gas for 40 gallon electric water heat... | Inspection Phase |
| 2026-09-14 | 1103 MILLER PLACE | Circuit Disconnect and Whip Exterior Service Outle... | Inspection Phase |
| 2026-09-14 | Address pending | Residential Electrical Permit | Filed |
| 2026-09-14 | 1115 MILLER PLACE | Install New 220V Circuit - Disconnect and Whip - S | Inspection Phase |
| 2026-09-09 | 1862 PARFET ESTATES DRIVE | install SS 120K BTU 96% 5 Ton Furnace & 4 Ton 13.4 | Inspection Phase |
Choose this market for a free trial to see all Electrical permits in Golden
Research Golden Electrical project activity
Access matching electrical permit records, available public-source details, and alerts when newer records are published.
Choose this market for a free trial →