2025-12-29
Roofing
$770,095
—
-- |COMMENTS: REROOF WITH THERMOPLASTIC MEMBRANE 2070 SQS | |
replacement
Re-roof
—
☆ Save
2025-12-29
HVAC/Mech
$17,808
—
INSTALL 100000 BTU FURNACE --|STATE ELECTRICAL LICENSE: 6800 | -- |COMMENTS: A …
furnace
replacement
HVAC replacement
—
☆ Save
2025-12-29
Roofing
$87,301
—
-- |COMMENTS: REROOF WITH THERMOPLASTIC MEMBRANE 37 SQS | |
replacement
Re-roof
—
☆ Save
2025-12-29
Fire Protection
$18,187
—
BUILDINGONLINE |BIBBEO LTD PAINT BOOTH HOOD FIRE SUPPRESSION SYSTEM
fire suppression
—
☆ Save
2025-12-29
Fire Protection
$3,700
—
BUILDINGONLINE | PENDANT AT SOUTHLANDS LEASING OFFICE - FIRE SPRINKLER - ADD 1 A…
sprinkler
—
☆ Save
2025-12-29
Electrical
$3,000
—
-- |COMMENTS: THE SERVICE IS UPGRADING TO 200 AMP| THE SERVICE TYPE IS UNDERGROU…
200A
×2
—
☆ Save
2025-12-29
Structural
$11,400
—
BUILDINGONLINE | STRUCTURAL REPAIR
—
☆ Save
2025-12-29
Plumbing
$18,240
—
BUILDINGONLINE | OOS SEWER REPAIR IN BASEMENT UNDER SLAB
line work
—
☆ Save
2025-12-29
General Construction
$8,000
—
BUILDINGONLINE | DECK REBUILD AND REINFORCE 14 X 13
FINISHED SQ FT 2354 PROPOSE…
—
☆ Save
2025-12-29
Plumbing
$9,669
—
INSTALL WATER HEATER 55 GAL -- |COMMENTS: 55-GAL HIGH EFFICIENCY ELECTRIC ON DEM…
55 gal water heater
electric
New installation
Water heater
—
☆ Save
2025-12-27
Roofing
$8,000
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 23 SQS | |
shingle
tear off
replacement
Re-roof
—
☆ Save
2025-12-27
Plumbing
$2,316
—
INSTALL WATER HEATER 40 GAL
40 gal water heater
standard
New installation
Water heater
—
☆ Save
2025-12-26
HVAC/Mech
$16,000
—
BUILDINGONLINE |BASEMENT FINISH 915 SF - TWO OPEN COMMONS ROOMS, OFFICE, FULL BA…
—
☆ Save
2025-12-26
Fire Protection
$2,100
—
BUILDINGONLINE | LOWES FIRE ALARM PANEL UPGRADE
service panel
fire alarm
Panel service
—
☆ Save
2025-12-26
Signage
—
—
XCEL ENERGY - (52) POTHOLES FOR DESIGN
—
☆ Save
2025-12-26
HVAC/Mech
—
—
COMCAST - TCP ONLY TO ACCESS EXISTING POLE
—
☆ Save
2025-12-26
General Construction
—
—
COMCAST - TCP ONLY FOR WORK ON PRIVATE PROPERTY
—
☆ Save
2025-12-26
Signage
$15,325
—
AERO 70 | INSTALL ONE DOUBLE SIDED ILLUMINATED MULTI-TENANT MONUMENT SIGN (EX-C.…
—
☆ Save
2025-12-26
Signage
$57,250
—
APS TRANSPORTATION SERVICES - INSTALL AN 8' MONUMENT SIGN WITH ELECTRONIC MESSAG…
—
☆ Save
2025-12-26
HVAC/Mech
$7,949
—
INSTALL 70000 BTU FURNACE -- |COMMENTS: FURNACE LOCATED ON BASEMENT |
furnace
New installation
HVAC installation
—
☆ Save
2025-12-26
Electrical
—
—
BUILDINGONLINE |MISC ELECTRICAL WORK ADD 6 LIGHTS IN KITCHEN, ADD POWER FOR FAUX…
—
☆ Save
2025-12-26
HVAC/Mech
$17,500
—
BUILDINGONLINE | HEAT PUMP INSTALL
heat pump
New installation
HVAC installation
—
☆ Save
2025-12-26
Plumbing
$3,118
—
INSTALL WATER HEATER 30 GAL --|UNIT: 101 |
30 gal water heater
standard
New installation
Water heater
—
☆ Save
2025-12-26
HVAC/Mech
$1,800
—
XCEL ENERGY - (5'X5') STREET CUT AND PATCHBACK; (2) POTHOLES; 50LF BORE TO REPAI…
HVAC repair
—
☆ Save
2025-12-26
Roofing
$16,890
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 27 SQS | |
shingle
tear off
replacement
Re-roof
—
☆ Save
2025-12-26
HVAC/Mech
—
—
CENTURYLINK - TCP ONLY TO BORE IN BACKYARD UTILITY EASEMENTS - NO WORK IN ROW
—
☆ Save
2025-12-26
HVAC/Mech
$10,400
—
DRIVEWAY EXTENSION IN FRONT, DRIVEWAY ADDITION ON SIDE YARD AND BACKYARD
—
☆ Save
2025-12-26
General Construction
$35,000
—
BUILDINGONLINE | GRIFFIS FITZSIMMONS CAR PORT
—
☆ Save
2025-12-26
HVAC/Mech
$1,170
—
CENTURYLINK - TRENCH 15 LF PLACE NEW HH AND PULL FIBER WITH REMAINING WORK IN PR…
New installation
HVAC installation
—
☆ Save
2025-12-26
General Construction
$6,000
—
METRONET FIBER - POTHOLES (125) FOR PLAN AND PROFILE
—
☆ Save
2025-12-26
Roofing
$15,000
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 14 SQS || |
shingle
tear off
replacement
Re-roof
—
☆ Save
2025-12-26
HVAC/Mech
$10,621
—
INSTALL 100000 BTU FURNACE -- |COMMENTS: REPLACE FURNACE WITH AN 80% EFFICIENT, …
furnace
replacement
HVAC replacement
—
☆ Save
2025-12-26
HVAC/Mech
$6,188
—
INSTALL 70000 BTU FURNACE -- |COMMENTS: INSTALL REPLACEMENT 92% SINGLE STAGE 70K…
3 tons
furnace
replacement
HVAC replacement
—
☆ Save
2025-12-26
Plumbing
$3,162
—
INSTALL WATER HEATER 50 GAL -- |COMMENTS: LIKE-FOR-LIKE 50 GALLON 40K BTU WATER …
50 gal water heater
standard
replacement
Water heater
—
☆ Save
2025-12-26
General Construction
$4,000
—
METRONET FIBER - POTHOLES (60) FOR PLAN AND PROFILE
—
☆ Save
2025-12-26
Solar
$21,341
—
BUILDINGONLINE | INSTALL SOLAR PV SYSTEM
solar
Solar PV
×2
—
☆ Save
2025-12-24
Fire Protection
$2,000
—
BUILDINGONLINE | INTERIOR LOGIC - FIRE ALARM -INSTALL 1 MONITOR MODULE
fire alarm
—
☆ Save
2025-12-24
General Construction
$4,000
—
COMCAST- BORE 380 LF, TRENCH 53 LF, WITH (19) POTHOLES AND (2) BORE PITS
—
☆ Save
2025-12-24
General Construction
$2,000
—
COMCAST - BORE APPROX 900LF TO PULL FIBER; BORE PITS (5); TRENCH 126FT; VAULTS (…
—
☆ Save
2025-12-24
HVAC/Mech
—
—
COMCAST - BORE 120LF WITH (2) POTHOLES IN SOFT SURFACE
—
☆ Save
2025-12-24
General Construction
—
—
COMCAST - BORE 20LF WITH (3) POTHOLES
—
☆ Save
2025-12-24
HVAC/Mech
$6,975
—
INSTALL 90000 BTU FURNACE
furnace
New installation
HVAC installation
—
☆ Save
2025-12-24
Roofing
$8,500
—
--|FLOOR: 2 | -- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 21 SQS | T/O 1 …
shingle
tear off
replacement
Re-roof
—
☆ Save
2025-12-24
Electrical
$7,808
—
SERVICE CHANGE- 200 AMP REPLACE
200A
replacement
—
☆ Save
2025-12-24
HVAC/Mech
$15,000
—
BUILDINGONLINE | BASEMENT FINISH APPROX 532SF: FAMILY ROOM, BEDROOM, FULL BATHRO…
—
☆ Save
2025-12-24
Solar
$24,095
—
BUILDINGONLINE | INSTALL SOLAR PV SYSTEM-ISSEL
solar
Solar PV
—
☆ Save
2025-12-24
Plumbing
$2,250
—
INSTALL WATER HEATER 40 GAL --|UNIT: 3 | -- |COMMENTS: INSTALLL REPLACEMENT 40 …
40 gal water heater
electric
replacement
Water heater
—
☆ Save
2025-12-24
Signage
$41,762
—
DUNKIN AND JIMMY JOHNS - INSTALL (4) ILLUMINATED WALL SIGN (CHANNEL LETTERS W/ C…
—
☆ Save