2026-03-06
HVAC/Mech
$32,000
—
BUILDINGONLINE | BASEMENT FINISH APPROX 1403SF: FAMILY ROOM, GYM, HALF BATHROOM,…
—
☆ Save
2026-03-06
Signage
$5,500
—
ARC THRIFT STORE-INSTALL (1) ILLUMINATED WALL SIGN (CHANNEL LETTERS) FRONT ELEVA…
—
☆ Save
2026-03-06
HVAC/Mech
$7,750
—
INSTALL 75000 BTU FURNACE WITH AC UNIT --|STATE ELECTRICAL LICENSE: 3968 | -- |…
2.5 tons
13 SEER
AC, furnace
replacement
HVAC replacement
—
☆ Save
2026-03-06
Roofing
$12,000
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 23 SQS | |
shingle
tear off
replacement
Re-roof
—
☆ Save
2026-03-06
Electrical
$1,800
—
-- |COMMENTS: RUN POWER TO 120V |
120V
—
☆ Save
2026-03-06
Electrical
$5,000
—
BUILDINGONLINE | THE STABLES PHASE 1 TEMP ELECTRICAL FOR CONSTRUCTION | SCOPE OF…
—
☆ Save
2026-03-06
Roofing
$10,650
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 20 SQS | |
shingle
tear off
replacement
Re-roof
—
☆ Save
2026-03-06
Signage
$2,622
—
GARS MASALA MAGIC | INSTALL ONE ILLUMINATED CHANNEL LETTER WALL SIGN ON FRONT (N…
—
☆ Save
2026-03-06
Roofing
$8,171
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 13 SQS | |
shingle
tear off
replacement
Re-roof
—
☆ Save
2026-03-06
Electrical
$1,170
—
CENTURYLINK - TRENCH 5LF FOR 2' CONDUIT, PLACE NEW LID ON HH AND NEW FDH
—
☆ Save
2026-03-06
General Construction
$150,000
—
BUILDINGONLINE |OAK RIDGE APT. BLDG 12 - UNITS L103, L203/L207
—
☆ Save
2026-03-06
General Construction
$94,000
—
CONCRETE PAVING - 7516SF ON MONAGHAN RD
—
☆ Save
2026-03-06
Plumbing
$1,000
—
STREET CUT (1) 5 X 3 AND PATCHBACK FOR SEWER REPAIR
line work
×3
—
☆ Save
2026-03-06
Plumbing
$4,083
—
INSTALL WATER HEATER 50 GAL
50 gal water heater
standard
New installation
Water heater
—
☆ Save
2026-03-06
HVAC/Mech
—
—
CITY PROJECT - STREET CUT (1) 35 X 40 AND PATCHBACK FOR EMERGENCY BRIDGE DECK RE…
replacement
HVAC replacement
—
☆ Save
2026-03-06
Plumbing
$2,906
—
BUILDINGONLINE | WATER HEATER REPLACEMENT LIKE FOR LIKE 40 GAL 38K BTU
40 gal water heater
standard
replacement
Water heater
—
☆ Save
2026-03-06
HVAC/Mech
$23,565
—
INSTALL 90000 BTU FURNACE WITH AC UNIT --|STATE ELECTRICAL LICENSE: 206797 | --…
4 tons
AC, furnace
New installation
HVAC installation
—
☆ Save
2026-03-06
Battery Storage
$19,500
—
BUILDINGONLINE | ARCHER BATTERY INSTALL
battery
New installation
Battery storage
—
☆ Save
2026-03-05
Roofing
$6,750
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 15 SQS | |
shingle
tear off
replacement
Re-roof
—
☆ Save
2026-03-05
Electrical
$7,175
—
BUILDINGONLINE | RIEAN CAZENAVE 125 AMP ELEC PANEL SWAP UPGRADE W/DEDICATED CIRC…
125A
replacement
—
☆ Save
2026-03-05
Plumbing
$4,883
—
BUILDINGONLINE |RIEAN CAZENAVE 50 GALLON ELE WATER HEATER
50 gal water heater
standard
Water heater
—
☆ Save
2026-03-05
Electrical
$5,500
—
BUILDINGONLINE | WINDLER FILING PA 7 NEIGHBORHOOD E TEMPORARY METER PEDESTAL
—
☆ Save
2026-03-05
Signage
$241,000
—
QTS DATA CENTER-INSTALL (3) ILLUMINATED WALL SIGNS (CHANNEL LETTERS) ON FRONT AN…
—
☆ Save
2026-03-05
General Construction
$12,000
—
BUILDINGONLINE | DECK PROJECT 36' 9.12" X 13'
—
☆ Save
2026-03-05
Plumbing
$4,895
—
INSTALL WATER HEATER 40 GAL -- |COMMENTS: 40 GAL 40K BTU WATER HEATER REPLACEMEN…
40 gal water heater
standard
replacement
Water heater
—
☆ Save
2026-03-05
Roofing
$9,350
—
-- |COMMENTS: T/O 1 LAYER AND REROOF WITH ASPHALT 22 SQS | |
shingle
tear off
replacement
Re-roof
—
☆ Save
2026-03-05
Structural
$86,000
—
BUILDINGONLINE | BASEMENT FINISH 800SF - BEDROOM, BATHROOM, FAMILY ROOM W/WET BA…
—
☆ Save
2026-03-05
Solar
$17,424
—
BUILDINGONLINE | RESIDENTIAL SOLAR PV SYSTEM
solar
Solar PV
—
☆ Save
2026-03-05
Electrical
—
—
BUILDINGONLINE |INSTALL 240V 50A HARDWIRED CHARGEPOINT HOME FLEX EV CHARGER IN T…
50A
240V
EV charger
New installation
—
☆ Save
2026-03-05
Plumbing
$10,000
—
BUILDINGONLINE |INSTALL NEW TANKLESS WATER HEATER NAVIAN 240A2 199BTU
tankless
New installation
Water heater
—
☆ Save
2026-03-05
Plumbing
$2,670
—
INSTALL WATER HEATER 40 GAL -- |COMMENTS: 40 GAL GAS 38K BTU WATER HEATER REPLAC…
40 gal water heater
gas
replacement
Water heater
—
☆ Save
2026-03-05
Fire Protection
—
—
—
—
☆ Save
2026-03-05
HVAC/Mech
$19,000
—
BUILDINGONLINE RAHMA DECK REPLACEMENT 230 SQ FT.
replacement
HVAC replacement
—
☆ Save
2026-03-05
HVAC/Mech
$1,000
—
STREET CUT - 5'X3' AND PATCHBACK FOR EMERGENCY FULL LINE REPLACEMENT
replacement
HVAC replacement
—
☆ Save
2026-03-05
Plumbing
$3,061
—
INSTALL WATER HEATER 40 GAL
40 gal water heater
standard
New installation
Water heater
—
☆ Save
2026-03-05
Plumbing
$6,003
—
BUILDINGONLINE | WATER HEATER REPLACEMENT 40 GALLONS
40 gal water heater
standard
replacement
Water heater
—
☆ Save
2026-03-05
HVAC/Mech
$22,213
—
INSTALL 60000 BTU FURNACE WITH AC UNIT --|STATE ELECTRICAL LICENSE: 010178 | --…
2 tons
AC, furnace
New installation
HVAC installation
—
☆ Save
2026-03-05
Solar
$34,882
—
BUILDINGONLINE | SOLAR PANEL INSTALLATION
solar
Solar PV
—
☆ Save
2026-03-05
Signage
$42,741
—
BUCKLEY YARD - (1) 6'6" ILLUMINATED MONUMENT SIGN 77.65SF ***PER PLANNING APPRO…
—
☆ Save
2026-03-05
Fire Protection
$9,950
—
STATE FARM TI |FIRE SPRINKLER & STANDPIPE | ADD 6 AND RELOCATE 12 HEADS FOR TI
…
sprinkler, standpipe
New installation
—
☆ Save
2026-03-05
Plumbing
$2,700
—
BUILDINGONLINE | WATER HEATER40 GAL 40K
—
☆ Save
2026-03-05
Plumbing
$4,045
—
BUILDINGONLINE | REPLACE GAS WATER HEATER TO ELECTRIC WATER HEATER 38 GAL
**** S…
38 gal water heater
gas
replacement
Water heater
—
☆ Save
2026-03-05
General Construction
—
—
BUILDINGONLINE |DULCE EVENT CENTER - NO WORK CHANGE OF OCCUPANCY
—
☆ Save
2026-03-05
Electrical
—
—
BUILDINGONLINE | RESIDENTIAL EV CHARGER INSTALL
EV charger
New installation
—
☆ Save
2026-03-05
Plumbing
$2,200
—
BUILDINGONLINE | WATER HEATER REPLACEMENT LIKE FOR LIKE, 38 GAL ELECTRIC 45000 W…
38 gal water heater
electric
replacement
Water heater
—
☆ Save
2026-03-05
Fire Protection
$10,000
—
BUILDINGONLINE | MI PUEBLO WAREHOUSE FIRE SPRINKLER
sprinkler
—
☆ Save
2026-03-05
Fire Protection
$5,000
—
BUILDINGONLINE | MAZAYA FOODS
—
☆ Save
2026-03-05
HVAC/Mech
—
—
XCEL ENERGY - TCP ONLY TO BORE IN BACKYARD EASEMENTS NO WORK IN ROW
—
☆ Save