| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-06-23 | Building: Alteration and Addition | 107 First St | Waterproofing at Garage Wall Abutting Sidewalk | $38,500 |
| 2025-10-18 | Building: Alteration and Addition | 10 Rogers St | Elevation Repairs st Engineer's Direction | $1,085,800 |
| 2024-10-18 | Building: Alteration and Addition | 75 Cambridge Pkwy | Replace Sealants at Front Elevation & Install Auto-Traffic Coating at Main Garag… | $942,200 |
| 2024-10-18 | Building: Alteration and Addition | 10 Rogers St | Replace EPDM Assembly & Concrete Paver System | $505,000 |
| 2024-08-28 | Building: Alteration and Addition | 10 ROGERS ST, Unit 210 | Replace Brick Paver & EPDM Assembly at Terrace with Concrete Pavers & Sloped EPD… | $25,000 |
| 2024-03-12 | Building: Alteration and Addition | 75 Cambridge Pkwy | Replace Building Sealants at Rear Terraces & Replace Traffic Coating at Ground F… | $860,000 |
| 2023-10-03 | Building: Alteration and Addition | 361 Harvard St | Replace existing roof with R-30 & PVC Assembly | $211,650 |
| 2023-07-11 | Building: Alteration and Addition | 83 Cambridge Pkwy | Replace Sealant Joints at Garden Elevation North Facing | $217,020 |
Phone numbers, websites, license status, and CSV export — for all Cambridge contractors.
Subscribe — $149/moIs this your business? Get your free verified-permits badge →