| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-05-12 | Roof | 37 Lancaster St, Cambridge, MA 02140 | Roof Replacement - Removal of all existing layers of roof coverings down to the … | - |
| 2026-05-08 | Roof | 37 Lancaster St, Cambridge, MA 02140 | Roof Replacement - Removal of all existing layers of roof coverings down to the … | $1,406,910 |
| 2026-03-16 | Building: Alteration and Addition | 130 MT AUBURN ST, Unit 511 | New finishes at 3-piece bathroom to include changing of one tub to a walk-in sho… | $152,115 |
| 2025-03-26 | Building: Alteration and Addition | 37 Lancaster St | Main House-Repairs to select South-facing window sash with associated trim work … | $146,300 |
| 2025-03-17 | Building: Alteration and Addition | 37 Lancaster St | Carriage house scope: Form & pour of structural reinforcement to one basement f… | $374,800 |
| 2024-12-17 | Building: Alteration and Addition | 9 Cutler Ave, Unit 1 | Removal of chimney from below roofline to basement (already removed above roofli… | $6,000 |
| 2024-05-31 | Building: Alteration and Addition | 10 Garden Ter | New laundry rm finishes and layout | $70,468 |
| 2023-08-28 | Building: Alteration and Addition | 19 Brewster St | removal of chimney through floors B-3 and above roofline. Associated structural … | $55,000 |
| 2023-06-20 | Building: Alteration and Addition | 10 Garden Ter | Full Bathroom Remodel | $102,590 |
| 2023-06-13 | Building: Alteration and Addition | 19 Brewster St | Move existing laundry room from 2nd flr to basement level. Remove 3-piece bathro… | $773,100 |
| 2023-05-17 | Building: Alteration and Addition | 40-42 TROWBRIDGE ST, Unit 40/1 | repairs to areas of water damage -to include 1st flr wood flooring, baseboard & … | $164,400 |
| 2022-01-14 | Building: Alteration and Addition | 26 Hubbard Park Rd | Misc. plumbing repairs throughout. Supply & install of drainage and sump pump a… | $27,797 |
| 2021-05-19 | Building: Alteration and Addition | 128 Oxford St, Unit 1/2 | Removal and replacement of 1st flr kitchen finishes & fixtures. Select rework o… | $386,029 |
| 2021-03-03 | Building: Alteration and Addition | 26 Hubbard Park Rd | inspection and relining of den fireplace chimney | $5,000 |
| 2020-01-02 | Building: Alteration and Addition | 30 Francis Ave | 3rd floor and kitchen renovation, new finishes at bathrooms, replace HVAC system… | $425,000 |
Phone numbers, websites, license status, and CSV export — for all Cambridge contractors.
Subscribe — $149/moIs this your business? Get your free verified-permits badge →