| 2026-06-08 | Gas Permit | 7110 FAULKNER RD, HANOVER 21076 | RUN NATURAL GAS TO (2) NEW MAKE-UP AIR ROOFTOP UNITS | - |
| 2026-06-08 | Plumbing Permit | 7110 FAULKNER RD, HANOVER 21076 | NEW BUILDING. PROVIDE INCOMING 8" WATER AND SEWER AND NEW FIXTURES. ADD (1)2" PR… | - |
| 2026-05-27 | MECHANICAL | 4600 FIELDSTON RD | Gas pipe installation from CNGC meter bar to new res gen | $2,437 |
| 2026-04-28 | MECHANICAL | 1203 W HOLLY ST STE 102 | Omni Property HP Replacement for MEC2023-0583 | $12,728 |
| 2026-04-03 | ELECTRICAL NONRESIDENTIAL OR MULTIFAMILY | 1622 N STATE ST | HVAC thermostat | $500 |
| 2026-03-03 | MECHANICAL | 1100 DUPONT ST | NCCU - Changeout Ductless Heat Pump | $10,349 |
| 2026-02-04 | MECHANICAL | 4756 CORONA CT | Furnace Change Out | $5,137 |
| 2026-01-16 | MECHANICAL | 3412 CRESTLINE PL | Furnace Change Out | $4,518 |
| 2026-01-13 | MECHANICAL | 2227 MIDWAY LN | Like for like changeout of MUA unit. | $20,000 |
| 2026-01-13 | ELECTRICAL NONRESIDENTIAL OR MULTIFAMILY | 2227 MIDWAY LN | Low Voltage T-stat wire | $1,000 |
| 2025-12-12 | MECHANICAL | 600 DUPONT ST STE B | Ductwork Revisions | $2,500 |
| 2025-12-04 | MECHANICAL | 2321 IRON ST | Furnace Change Out | $5,861 |
| 2025-12-01 | ELECTRICAL NONRESIDENTIAL OR MULTIFAMILY | 40 BELLWETHER WAY | Low Voltage T-stat wire | $1,000 |
| 2025-12-01 | MECHANICAL | 40 BELLWETHER WAY STE 103 | Heating, Cooling & DOAS for TI: KINGFISHER CHIROPRACTIC | $35,000 |
| 2025-11-05 | MECHANICAL | 1238 E RACINE ST | Furnace Change Out | $6,670 |
| 2025-11-04 | MECHANICAL | 805 HOME LN | Server room ductless like for like changeout | $6,000 |
| 2025-10-31 | MECHANICAL | 3321 SUSSEX DR | Furnace Change Out | $6,204 |
| 2025-10-24 | MECHANICAL | 1622 N STATE ST | Like for like replacement of pack unit and ductwork revision | $70,000 |
| 2025-10-24 | ELECTRICAL NONRESIDENTIAL OR MULTIFAMILY | 1622 N STATE ST | Low Voltage T-stat wire | $500 |
| 2025-09-29 | MECHANICAL | 809 14TH ST | Boiler Change Out | $6,889 |
| 2025-09-16 | MECHANICAL | 2211 37TH ST | Furnace Change Out and Gas Pipe Repositioning | $6,854 |
| 2025-07-24 | MECHANICAL | 3912 SILVER BEACH AVE | Install Ductless Heat Pump | $9,677 |
| 2025-07-21 | MECHANICAL | 130 42ND ST | Furnace Change Out and Heat Pump Installation | $13,086 |
| 2025-07-09 | MECHANICAL | 210 E CHESTNUT ST | Install new TYPE I hood, grease duct and MUA | $8,875 |
| Mechanical Permit | 7110 FAULKNER RD, HANOVER 21076 | Install ( 2 ) Gas Fire Make Up Air Units, ( 2 ) 60x60 Louvers, w/ gravity relief… | - |