| 2026-08-04 | Revision | - | The panel layout was changed at install for easier installation. | - |
| 2026-08-04 | Revision | - | TEMPORARY BARRICADE | - |
| 2026-08-04 | Revision | - | Fire Sprinkler Plan Review | - |
| 2026-08-04 | Revision | - | Delition of the Casita Spa | - |
| 2026-08-04 | Revision | - | Stem Wall/Spalling acceptance | - |
| 2026-08-04 | Revision | - | EOR approved Steel shop drawings | - |
| 2026-08-03 | Revision | - | Sancta Fix letter | - |
| 2026-08-03 | Revision | - | RFI 200 COR Typical Ladder Detail Sump Pump Arrangement | - |
| 2026-08-03 | Revision | - | Field bulletin for inspection conformance | - |
| 2026-08-03 | Revision | - | concrete mix design | - |
| 2026-08-03 | Revision | - | Exterior Wall Insulation Revision. Burglar Bar Details. | - |
| 2026-08-03 | Revision | - | RFI 167 New Bridge Bent Plate Stitch Weld Detail | - |
| 2026-08-02 | Revision | - | Electrical Service Panel | - |
| 2026-08-01 | Revision | - | Bulletin 2 | - |
| 2026-07-31 | Revision | - | Updated grading plans to add retaining wall | - |
| 2026-07-31 | Revision | - | Revision to the main Live Theater Structural permit for SSI 021 for the duct sup… | - |
| 2026-07-31 | Revision | - | NCR W-01 Clearance | - |
| 2026-07-31 | Revision | - | Work under this application is limited to the erection of a temporary Constructi… | - |
| 2026-07-30 | Revision | - | Revision to the main GT Build Out (BD25-48317) Permit for 084413-GT1140 to Addre… | - |
| 2026-07-29 | Revision | - | Revision to the Electrical Single Line to match field conditions (per inspector … | - |
| 2026-07-29 | Revision | - | Revision 1 General Revisions | - |
| 2026-07-29 | Revision | - | 1. Plans have been updated to interconnect to the secondary 125A main breaker. 2… | - |
| 2026-07-28 | Revision | - | updated grading and horzontal contral plans approved by CCPW | - |
| 2026-07-28 | Revision | - | Electrical and Plumbing Revision - Add power/data and a waterline | - |
| 2026-07-28 | Revision | - | Change in Breaker placement | - |
| 2026-07-24 | Revision | - | Deferred Railing Submittal | - |
| 2026-07-24 | Revision | - | Removing 4" from floorplan Fire Only | - |
| 2026-07-24 | Revision | - | Deferred Truss Submittal | - |
| 2026-07-23 | Revision | - | Landscape revision. IECC compliance. | - |
| 2026-07-23 | Revision | - | Revision to the LR Podium for Design Rev. 22 | - |
| 2026-07-23 | Revision | - | Revised site plan to show one 24' gate and two 16' gates. new structural calcula… | - |
| 2026-07-23 | Revision | - | RFI # 113 NCR W-06, W-07 & W-08 26 x 26 cut out on shearwall response | - |
| 2026-07-23 | Revision | - | Removing sign from scope | - |
| 2026-07-17 | Revision | - | Added stone veneer and EIFS wall finish along with 6” concrete curb | - |
| 2026-07-16 | Revision | - | REV3 Structural only | - |
| 2026-07-16 | Revision | - | Revision to the main LT Structural (BD25-03167) permit for UL Firestop Judgement… | - |
| 2026-07-16 | Residential Building New SFR Tract Home | - | NEW SFR LOT | - |
| 2026-07-16 | Revision | - | Rebar Splice en lieu of Welded Connection | - |
| 2026-07-16 | Revision | - | Handrail Deferred submittal | - |
| 2026-07-16 | Revision | - | Engineering Material | - |
| 2026-07-16 | Revision | - | Unapproved Steel Fabricator | - |