| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-10-01 | Electrical Permit | 4522 AVENUE F | Upgrading the electrical service main distribution panel and revenue meter mast. | - |
| 2026-09-28 | Electrical Permit | 2905 OAK CREST AVE | 5.28 kW roof mounted solar electric system | - |
| 2026-09-25 | Electrical Permit | 2008 WESTRIDGE DR BLDG B | 7.36 kW roof mounted solar PV system with energy storage | - |
| 2026-09-10 | Electrical Permit | 5613 SHOALWOOD AVE | Roof mounted solar | - |
| 2026-09-10 | Electrical Permit | 5811 RISING HILLS DR | 8.28kw roof mounted solar system | - |
| 2026-09-03 | Electrical Permit | 2708 SCENIC DR | Express: rooftop solar electric panels tilted up | - |
| 2026-09-02 | Electrical Permit | 8207 ASMARA DR | Replace main panel. Mark Pride 512-9705292 | - |
| 2026-09-02 | Electrical Permit | 5007 DUVAL ST | Pre-wire for solar | - |
| 2026-09-02 | Electrical Permit | 1010 E APPLEGATE DR | Adding energy storage system to existing PV system | - |
| 2026-08-31 | Electrical Permit | 4108 LAWLESS ST | Hard-wired installation of customer-supplied Emporia Pro Level 2 EV Charger. Ch… | - |
| 2026-08-12 | Electrical Permit | 12603 EUROPA LN | Install Transfer Switch | - |
| 2026-08-11 | Electrical Permit | 1010 E APPLEGATE DR | Installation of transfer switch with 150 amp main on service with existing 150 a… | - |
| 2026-08-11 | Electrical Permit | 5216 BASSWOOD LN | Installation of transfer switch with 150 amp main on service with existing 150 a… | - |
| 2026-08-11 | Electrical Permit | 5219 MOON SHADOW DR | Replace meter with 200A and panel with 200A | - |
| 2026-08-03 | Electrical Permit | 6112 HIGHLAND HILLS DR | Install additional 3.22 kW DC rooftop solar system to existing residential | - |
| 2026-07-30 | Electrical Permit | 12603 EUROPA LN | Install new 14.96 kW DC rooftop solar system and 15.0 kWh energy storage system … | - |
| 2026-07-27 | Electrical Permit | 1303 RUTH AVE | Replace meter and mast | - |
| 2026-07-23 | Electrical Permit | 1309 CHICON ST | Rooftop Solar Line-Side Tap Interconnection for Existing Multi-Family Building … | - |
| 2026-07-23 | Electrical Permit | 3966 SENDERO DR | 4.14 kW rooftop solar installation to replace existing | - |
| 2026-07-21 | Electrical Permit | 1018 W MILTON ST | Install additional 1.84 kW DC rooftop solar system to existing residential | - |
| 2026-07-17 | Electrical Permit | 2109 GRISWOLD LN | Prewire for Solar | - |
| 2026-07-10 | Electrical Permit | 1811 BELFORD DR | Install new 8.80 kW DC rooftop solar system and 15.0 kWh energy storage system t… | - |
| 2026-07-09 | Electrical Permit | 200 THE CIRCLE | Install additional 8.74 kW DC rooftop solar system to existing residential | - |
| 2026-07-08 | Electrical Permit | 13649 RUTLEDGE SPUR BLDG 2 | SMART housing. Rooftop Solar. Line side tap interconnection. | - |
| 2026-07-08 | Electrical Permit | 2105 PARKER LN UNIT HP2 | QT PV - Rooftop Solar. Line side tap interconnection for Existing Multi-Family B… | - |
| 2026-07-08 | Electrical Permit | 2105 PARKER LN UNIT HP3 | QT PV - Rooftop Solar for Building HP3 | - |
| 2026-07-08 | Electrical Permit | 2105 PARKER LN UNIT LEASE | QT PV - Rooftop Solar. Line side tap interconnection for Existing Multi-Family B… | - |
| 2026-07-08 | Electrical Permit | 9001 SCOTTISH PASTURES DR | Install 25.08 kW DC Solar | - |
| 2026-07-08 | Electrical Permit | 13649 RUTLEDGE SPUR BLDG LEASE | SMART Housing. Rooftop solar. Line side tap interconnection. 2025 124818 DA. | - |
| 2026-07-08 | Electrical Permit | 13649 RUTLEDGE SPUR BLDG 3 | QT PV - Rooftop Solar. Line side tap interconnection AT EXISTING MULTIFAMILY - O… | - |
| 2026-07-08 | Electrical Permit | 13649 RUTLEDGE SPUR BLDG 1 | Rooftop Solar Line Side Tap Interconnection | - |
| 2026-07-08 | Electrical Permit | 13649 RUTLEDGE SPUR BLDG 4 | QT PV - Rooftop Solar. Backfed breaker interconnection AT EXISTING MULTIFAMILY -… | - |
| 2026-07-08 | Electrical Permit | 1141 CHICON ST BLDG 1 UNIT HP3 | SMART HOUSING Rooftop Solar. No battery or energy storage. Line side tap interco… | - |
| 2026-07-07 | Electrical Permit | 1141 CHICON ST BLDG 1 | Rooftop Solar. No battery or energy storage. Two line side tap interconnection. … | - |
| 2026-06-30 | Electrical Permit | 8134 MESA DR UNIT B | Rooftop Solar Line side tap interconnection - Building B | - |
| 2026-06-30 | Electrical Permit | 12609 FLOWERING SENNA BND | Install additional 11.0 kW DC rooftop solar system to existing residential | - |
| 2026-06-24 | Electrical Permit | 1141 CHICON ST BLDG 1 | Rooftop Solar. No battery or energy storage. Two line side tap interconnection. … | - |
| 2026-06-23 | Electrical Permit | 1141 CHICON ST BLDG 1 UNIT HP3 | SMART HOUSING Rooftop Solar. No battery or energy storage. Line side tap interco… | - |
| 2026-06-22 | Electrical Permit | 1141 CHICON ST BLDG 2 | QT - Rooftop Solar. No battery or energy storage. Line side tap interconnection … | - |
| 2026-06-17 | Electrical Permit | 1018 W MILTON ST | Replace Meter can with 200A and replace panel with 200A/200A main. | - |
| 2026-06-16 | Electrical Permit | 2304 STANDISH DR | Install additional 2.64 kW DC rooftop solar system and an additional 10.0 kWh en… | - |
| 2026-06-12 | Electrical Permit | 7905 BURLESON RD BLDG TNFM2 | Add lugs in main disconnect. Shutoff required *disconnect and reconnect only* | - |
Phone numbers, websites, license status, and CSV export — for all Austin contractors.
Subscribe — $149/mo