| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-06-10 | Utility Connection | 3508 N BENNETT ST | Open trench repair of sanitary sewer line at SFD. No barricades, all on private … | - |
| 2026-06-05 | Utility Connection | 5019 N 15TH ST | Spot Repair-Private Property (upto 4ft Deep) | - |
| 2026-06-04 | Building | 1721 S 46TH ST | Insulation of multi zone mini split system with 20 4K air handler 7K high wall a… | $40,000 |
| 2026-06-02 | Utility Connection | 3123 N FERDINAND ST | 4 Inch CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as needed | - |
| 2026-06-02 | Building | 1810 S 92ND ST | HVAC Scope of Work: • Install Bosch 2-ton heat pump system • Install (1) 1-ton 4… | $15,000 |
| 2026-06-01 | Utility Connection | 2710 S 12TH ST | Spot Repair-Private Property (upto 4ft Deep) (HS-8). | - |
| 2026-06-01 | Building | 3316 N 29TH ST | Whole House Water Repipe for 1 Bathroom Home (H-1.5). Replace all water lines fr… | $14,500 |
| 2026-05-28 | Utility Connection | 909 N WASHINGTON ST | We would dig up to 9’ deep through a 4x4’ hole to expose old concrete sewer line… | - |
| 2026-05-28 | Utility Connection | 6036 S WAPATO LAKE DR | Hand Dig - Water Main upto 50ft, 2ft Deep. Does NOT Include Hard Surface Restora… | - |
| 2026-05-27 | Building | 2108 N ANDERSON ST | We will be cutting up the concrete in the basement around the sewer stack and ou… | $12,900 |
| 2026-05-25 | Utility Connection | 1427 S 53RD ST | 4 to 6 Inch Transition CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as … | - |
| 2026-05-25 | Utility Connection | 3314 N 29TH ST | 4 to 6 Inch Transition CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as … | - |
| 2026-05-15 | Utility Connection | 1718 BRIDGEVIEW DR | 4 to 6 Inch Transition CIPP Liner (upto 100ft) - Excavate | - |
| 2026-05-12 | Building | 3305 N 8TH ST | We will be installing a floor mounted ductless mini split and Henry's bedroom up… | $9,000 |
| 2026-05-12 | Building | 418 E 50TH ST | Installation of new heat pump and air handler | $21,000 |
| 2026-05-08 | Utility Connection | 6155 S WAPATO LAKE DR | Hand Dig - Water Main upto 50ft, 2ft Deep. Does NOT Include Hard Surface Restora… | - |
| 2026-05-07 | Utility Connection | 4917 N DEFIANCE ST | Water Main upto 100ft | - |
| 2026-05-05 | Building | 2717 N SHIRLEY ST | Removing Old Furnace and installing brand new furnace and heat pump at SFD | $16,000 |
| 2026-04-30 | Building | 4826 N HUSON ST | Install Midea - 3 ton, R454B EVOX G3 4t Extreme Heat Pump at SFD | $20,000 |
| 2026-04-29 | Utility Connection | 826 E 48TH ST | Repair of sanitary sewer line at SFD. Open trench pending field approval of the … | - |
| 2026-04-28 | Building | 1106 N JACKSON AVE | Complete installation of Daikin Aurora 9k BTU outdoor heat pump and indoor high-… | $7,600 |
| 2026-04-28 | Building | 1706 S FIFE ST | Vent connector on furnace needs to be repaired , not connected at all - need gas… | $3,000 |
| 2026-04-24 | Utility Connection | 517 E 78TH ST | Repair of sanitary sewer line at SFD. Open trench, pending field approval of the… | - |
| 2026-04-23 | Utility Connection | 424 E 46TH ST | Repair of sanitary sewer line at SFD. Open trench method. No barricades, no ROW … | - |
| 2026-04-22 | Utility Connection | 5837 S LAWRENCE ST | Repair of sanitary sewer line at SFD. Open trench pending field approval of the … | - |
| 2026-04-20 | Utility Connection | 1422 E 67TH ST | Repair of sanitary sewer line. Open trench pending field approval of CIPP method… | $17,000 |
| 2026-04-08 | Utility Connection | 3535 S AINSWORTH AVE | Replacement of water line at SFD. No ROW. | - |
| 2026-04-06 | Building | 6425 S FIFE ST | Upgrading from an existing gas furnace system to a heat pump system with air han… | $20,000 |
| 2026-04-02 | Utility Connection | 5128 N DEFIANCE ST | Repair of sanitary sewer line at SFD. Open trench pending field approval of pipe… | - |
| 2026-02-20 | Building | 5810 S GOVE ST | Remove existing Mitsubishi single head mini split and install a brand new Daikin… | $25,000 |
| 2026-02-16 | Utility Connection | 1422 N 10TH ST | Repair of SANITARY SEWER at SFD, CIPP Method . All in private property. No work … | $21,000 |
| 2026-02-11 | Utility Connection | 4702 S 66TH ST | Repair of Sanitary Sewer line at SFD. No ROW work. NO patch needed, all on priva… | $9,500 |
| 2026-02-10 | Utility Connection | 1415 S 9TH ST | Repair of Sanitary Sewer line at SFD. Pipe bursting method. No ROW work. NO patc… | $5,000 |
| 2026-02-05 | Utility Connection | 2508 N CEDAR ST | Repair of sanitary sewer line at SFD. Open trench, pending field approval of the… | $18,800 |
| 2026-02-03 | Building | 3849 N BRISTOL ST | swapping 80% furnace out on 80/hp system at SFD | $8,000 |
| 2026-01-29 | Utility Connection | 2407 N ORCHARD ST | REPLACE of Water Connection at SFD, No work on the ROW, or Patch inspection need… | $19,500 |
| 2026-01-29 | Utility Connection | 1676 S 41ST ST | Pipe Burst – 70 ft (4’ House Hole to 8’ Gravel Strip) to replace length of orang… | - |
| 2026-01-28 | Building | 3309 S AINSWORTH AVE | Daikin 4-Zone Ductless Heat Pump Installation at SFD Installation of New Daikin … | $23,000 |
| 2026-01-28 | Utility Connection | 3922 N DEFIANCE ST | REPLACE of SANITARY SEWER at SFD, Open Trench. No work on the ROW, or Patch insp… | - |
| 2026-01-23 | Utility Connection | 5616 E L ST | excavating a 4x4 area in alley right away, 3 feet in depth to expose existing se… | - |
| 2026-01-22 | Right-of-Way | 2407 N ORCHARD ST | Pipe Bore - Water Main upto 100ft, (HS-8). | $19,500 |
| 2026-01-21 | Building | 3127 N BENNETT ST | Install Midea - 2 ton, R454B EVOX G3 2t Extreme Heat Pump. Model: MO1HE H24B 2A … | $15,000 |
| 2025-12-04 | Utility Connection | 4619 SLAYDEN RD NE | Replacement main water line via pipe bore method at SFD. 2 days barricade per ap… | $24,300 |
| 2025-12-03 | Utility Connection | 7655 6TH AVE | Water line repair at SFD. No patch, no barricade. | $17,500 |
| 2025-12-01 | Building | 4827 S BELL ST | Replace existing gas furnace & air conditioner with new electric air handler & h… | $12,700 |
| 2025-11-26 | Utility Connection | 1285 HUSON DR | Open trench repair of sanitary sewer at SFD. No patch, no barricade. | $5,200 |
| 2025-11-20 | Utility Connection | 1232 VENTURA DR | Repair of water line at SFD.1 days Barricade per approved TCP. | $15,400 |
| 2025-11-20 | Utility Connection | 618 E 32ND ST | Repair of sanitary sewer line at SFD. Open trench method pending field approval … | $12,400 |
| 2025-11-20 | Building | 2336 S HOSMER ST | Replace HVAC Equipment with similar system of the same efficiency. Install Ameri… | $11,600 |
| 2025-11-14 | Utility Connection | 1306 E 60TH ST | Repair of Sanitary Sewer line at SFD. Pipe bursting method. No ROW work. NO patc… | $13,400 |
Phone numbers, websites, license status, and CSV export — for all Tacoma contractors.
Subscribe — $149/mo