| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-07-29 | Utility Connection | 509 S 45TH ST | 4 to 6 Inch Transition CIPP Liner (upto 100ft) - ADD ON - Does not include diggi… | - |
| 2026-07-28 | Right-of-Way | 5618 S MULLEN ST | Pipe Burst New 4 Inch Sewer - w/Asphalt Patch (upto 10ft Deep). Add On: 6 Inch B… | $32,000 |
| 2026-07-27 | Utility Connection | 5127 GALLEON DR NE | Repair of water line at SFD, no ROW | - |
| 2026-07-24 | Utility Connection | 5021 S TRAFTON ST | Open trench repair of sanitary sewer line at SFD. No barricades, all on private … | - |
| 2026-07-24 | Utility Connection | 4316 S M ST | 1. Excavate approximately 8 feet deep using an excavator to expose the damaged s… | - |
| 2026-07-24 | Building | 804 S L ST | The new gas piping system will be designed and routed to accommodate the future … | $12,500 |
| 2026-07-21 | Utility Connection | 7607 S CUSHMAN AVE | 4 to 6 Inch Transition CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as … | - |
| 2026-07-16 | Utility Connection | 402 96TH ST S | Excavation Dig - Water Main upto 50ft, 2ft Deep. | - |
| 2026-07-14 | Utility Connection | 3724 E I ST | We then will hand dig a 4x4 area in backyard at fence line up to 5ft deep to exp… | - |
| 2026-07-09 | Utility Connection | 1540 S MOUNTAIN VIEW AVE | Repair water connection at SFD. No barricades, all on private property | - |
| 2026-07-09 | Building | 4927 HARBOR VIEW DR NE | Install new mini split system | $15,000 |
| 2026-07-03 | Utility Connection | 5917 N 46TH ST | For this project we would dig up to 8’ deep through a 4x4’ hole to expose collap… | - |
| 2026-07-01 | Utility Connection | 4311 N 33RD ST | 4 Inch CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as needed | - |
| 2026-07-01 | Utility Connection | 7225 E E ST | 4 to 6 Inch Transition CIPP Liner (upto 100ft) - Includes Hand Dig up to 4 ft as… | - |
| 2026-07-01 | Utility Connection | 4611 N LEXINGTON ST | 4 to 6 Inch Transition CIPP Liner (upto 100ft) - Includes Hand Dig up to 4 ft as… | - |
| 2026-06-24 | Building | 5108 S WAPATO ST | We will be installing an ac and furnce with panel surge protection and ac discon… | $17,000 |
| 2026-06-24 | Utility Connection | 8429 S G ST | Repair of sanitary sewer line at SFD. Open trench pending field approval of the … | - |
| 2026-06-22 | Utility Connection | 1442 E 29TH ST | Spot repair-Private Property (upto 10ft Deep) (HS-8). Does NOT Include ROW Permi… | $10,700 |
| 2026-06-18 | Building | 1215 S M ST | We will be installing a single head 18,000 BTU system entra Daikin and removing … | $12,000 |
| 2026-06-18 | Utility Connection | 4318 S 73RD ST | Repair of sanitary sewer line at SFD. Open trench method. No ROW. | $10,000 |
| 2026-06-17 | Utility Connection | 2317 S 15TH ST | We would dig up to 7’ deep through a 4x4’ hole using a bobcat to dig, once concr… | - |
| 2026-06-16 | Building | 5508 STONEGATE AVE NE | Will be installing new heat pump with a new concrete pad equipment disconnect se… | $12,000 |
| 2026-06-15 | Utility Connection | 4628 S BELL ST | spot repair in homeowners backyard approximately 5 feet long and 3 feet deep to … | $18,000 |
| 2026-06-10 | Utility Connection | 3508 N BENNETT ST | Open trench repair of sanitary sewer line at SFD. No barricades, all on private … | - |
| 2026-06-05 | Utility Connection | 5019 N 15TH ST | Spot Repair-Private Property (upto 4ft Deep) | - |
| 2026-06-04 | Building | 1721 S 46TH ST | Insulation of multi zone mini split system with 20 4K air handler 7K high wall a… | $40,000 |
| 2026-06-02 | Building | 1810 S 92ND ST | HVAC Scope of Work: • Install Bosch 2-ton heat pump system • Install (1) 1-ton 4… | $15,000 |
| 2026-06-02 | Utility Connection | 3123 N FERDINAND ST | 4 Inch CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as needed | - |
| 2026-06-01 | Building | 3316 N 29TH ST | Whole House Water Repipe for 1 Bathroom Home (H-1.5). Replace all water lines fr… | $14,500 |
| 2026-06-01 | Utility Connection | 2710 S 12TH ST | Spot Repair-Private Property (upto 4ft Deep) (HS-8). | - |
| 2026-05-28 | Utility Connection | 909 N WASHINGTON ST | We would dig up to 9’ deep through a 4x4’ hole to expose old concrete sewer line… | - |
| 2026-05-28 | Utility Connection | 6036 S WAPATO LAKE DR | Hand Dig - Water Main upto 50ft, 2ft Deep. Does NOT Include Hard Surface Restora… | - |
| 2026-05-27 | Building | 2108 N ANDERSON ST | We will be cutting up the concrete in the basement around the sewer stack and ou… | $12,900 |
| 2026-05-25 | Utility Connection | 3314 N 29TH ST | 4 to 6 Inch Transition CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as … | - |
| 2026-05-25 | Utility Connection | 1427 S 53RD ST | 4 to 6 Inch Transition CIPP Liner (upto 50ft) - Includes Hand Dig up to 4 ft as … | - |
| 2026-05-15 | Utility Connection | 1718 BRIDGEVIEW DR | 4 to 6 Inch Transition CIPP Liner (upto 100ft) - Excavate | - |
| 2026-05-12 | Building | 3305 N 8TH ST | We will be installing a floor mounted ductless mini split and Henry's bedroom up… | $9,000 |
| 2026-05-12 | Building | 418 E 50TH ST | Installation of new heat pump and air handler | $21,000 |
| 2026-05-08 | Utility Connection | 6155 S WAPATO LAKE DR | Hand Dig - Water Main upto 50ft, 2ft Deep. Does NOT Include Hard Surface Restora… | - |
| 2026-05-07 | Utility Connection | 4917 N DEFIANCE ST | Water Main upto 100ft | - |
| 2026-05-05 | Building | 2717 N SHIRLEY ST | Removing Old Furnace and installing brand new furnace and heat pump at SFD | $16,000 |
| 2026-04-30 | Building | 4826 N HUSON ST | Install Midea - 3 ton, R454B EVOX G3 4t Extreme Heat Pump at SFD | $20,000 |
| 2026-04-29 | Utility Connection | 826 E 48TH ST | Repair of sanitary sewer line at SFD. Open trench pending field approval of the … | - |
| 2026-04-28 | Building | 1706 S FIFE ST | Vent connector on furnace needs to be repaired , not connected at all - need gas… | $3,000 |
| 2026-04-28 | Building | 1106 N JACKSON AVE | Complete installation of Daikin Aurora 9k BTU outdoor heat pump and indoor high-… | $7,600 |
| 2026-04-24 | Utility Connection | 517 E 78TH ST | Repair of sanitary sewer line at SFD. Open trench, pending field approval of the… | - |
| 2026-04-23 | Utility Connection | 424 E 46TH ST | Repair of sanitary sewer line at SFD. Open trench method. No barricades, no ROW … | - |
| 2026-04-22 | Utility Connection | 5837 S LAWRENCE ST | Repair of sanitary sewer line at SFD. Open trench pending field approval of the … | - |
| 2026-04-20 | Utility Connection | 1422 E 67TH ST | Repair of sanitary sewer line. Open trench pending field approval of CIPP method… | $17,000 |
| 2026-04-08 | Utility Connection | 3535 S AINSWORTH AVE | Replacement of water line at SFD. No ROW. | - |
Phone numbers, websites, license status, and CSV export — for all Tacoma contractors.
Subscribe — $149/mo