| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-06-12 | Building | 1902 S WILKESON ST UNIT B | 10X7 ENCLOSURE FOR BIKES | - |
| 2026-06-12 | Utility Connection | 813 MARTIN LUTHER KING JR WAY | This is for the side sewer connection for the project. The project is a renovati… | - |
| 2026-06-12 | Utility Connection | 813 MARTIN LUTHER KING JR WAY | Water connection for the project. This is a renovation of an existing building t… | - |
| 2026-06-10 | Building | 1507 S DURANGO ST | CONSTRUCTION OF 728 SQ FT ADU | - |
| 2026-06-10 | Utility Connection | 1452 S FERDINAND DR | sewerline replacement from dig pit at the current clean out downstream towards c… | - |
| 2026-06-10 | Utility Connection | 655 N HAWTHORNE ST | Repair/replacement of concrete side sewer with new 4" pvc sewer pipe. | $3,400 |
| 2026-06-10 | Utility Connection | 6837 S THOMPSON AVE | sewerline replacement from home to main approximately 60ft CIPP method | - |
| 2026-06-10 | Building | 655 N HAWTHORNE ST | Back water valve replacement | $3,400 |
| 2026-06-09 | Building | 1902 S WILKESON ST UNIT B | DUPLEX WITH GARAGES ATTACHED | - |
| 2026-06-09 | Building | 1902 S WILKESON ST UNIT B | DUPLEX | - |
| 2026-06-09 | ePermit | 620 S SHIRLEY ST | commercial strip and re-roof section G and H. | $35,995 |
| 2026-06-09 | Pre-Application | 701 E 72ND ST | Residential - Repair | - |
| 2026-06-08 | Right-of-Way | 1705 DOCK ST # 100 | Setting generator near esplanade | - |
| 2026-06-05 | Building | 4102 N 35TH ST | We plan to build a 24' wide by 26' deep detached garage (624 sq ft). The garage … | $65,000 |
| 2026-06-05 | Utility Connection | 105 S 70TH ST | shoe string water service line replacement from to meter located at corner of S … | - |
| 2026-06-04 | Building | 414 S 50TH ST | Removing failed equipment installed under MECHR25-1269. Installing new system (T… | $18,000 |
| 2026-06-03 | Building | 5330 N 48TH ST | INSTALL DUCTED DUCTLESS | $13,742 |
| 2026-06-02 | Land Use | 5950 N 9TH ST | Zoning Designation: Please specify the current zoning designation for the proper… | - |
| 2026-06-02 | Special Event | 925 TACOMA AVE S | A Community Event for the Justice Impacted and Homeless Populations | - |
| 2026-06-02 | Right-of-Way | 5908 S J ST | Sidewalk Replacement UBI 605575896 A2 Concrete LLC | - |
| 2026-06-01 | Right-of-Way | 725 E 25TH ST | Using location of nearest parcel to this transit bus stop to pick up and drop of… | - |
| 2026-06-01 | Land Use | 5400 N PEARL ST | null | - |
| 2026-06-01 | Right-of-Way | 5920 BROWNS POINT BLVD | "RTRE tree planting permit for SDEV24-0399" Related to SDEV24-0399 Watchtower | - |
| 2026-05-29 | Site | 2227 E 38TH ST | Site development for 2227 & 2231 E 38th St. (2) new SFR's and (2) DADU duplexes … | $60,000 |
| 2026-05-29 | Building | 4539 S J ST | Fire damage restoration Electrical, drywall, paint, flooring, cabinets | $136,000 |
| 2026-05-29 | Building | 2227 E 38TH ST +1 more on this street | Construct a two-story 1,486SF 3bed/3ba SFR. Includes plumbing and mechanical sco… | $258,768 |
| 2026-05-29 | Building | 2227 E 38TH ST +1 more on this street | Construct a 2-story duplex with (2) 1,000sqft 3bed/2ba DADU's. Includes plumbing… | $346,453 |
| 2026-05-28 | Utility Connection | 819 S PROSPECT ST | sewerline replacement from home to riser CIPP method | - |
| 2026-05-27 | Right-of-Way | 901 BROADWAY | parking for Convencion Latinas de exito | - |
| 2026-05-27 | Building | 5912 S I ST | REPLACE GAS FURNACE, INSTALL NEW HEAT PUMP | $11,560 |
| 2026-05-26 | Right-of-Way | 2106 MARTIN LUTHER KING JR WAY | place a dumpster for 30 days | - |
| 2026-05-26 | Building | 1157 THORNE RD | 1,532 SF interior alteration - establishment of sales display area in existing o… | $150,000 |
| 2026-05-26 | Right-of-Way | 2106 MARTIN LUTHER KING JR WAY | extended use for dumpster in right of way | - |
| 2026-05-26 | Building | 1121 E 35TH ST | After-the-face permit: Convert part of detached garage to art studio. Install he… | $500 |
| 2026-05-22 | Building | 4522 N 10TH ST | Construct a two-story 1,000SF 3bed/2ba DADU. Includes plumbing and mechanical sc… | $175,901 |
| 2026-05-22 | Utility Connection | 923 N JUNETT ST | sewerline replacement from home to main in alley Pipe burst method. Currently li… | - |
| 2026-05-22 | Building | 3506 S 35TH ST | Install plumbing systems and equipment per plans. Previously reviewed under buil… | $726,235 |
| 2026-05-22 | Land Use | 2725 HENRY RD | The Henry Road Plat project site is comprised of four undeveloped parcels locate… | $2,700,000 |
| 2026-05-22 | Building | 4418 N 24TH ST | Construct a two-story 1,000SF 3bed/2ba DADU. Includes plumbing and mechanical sc… | $172,620 |
| 2026-05-22 | Utility Connection | 2914 N 10TH ST | sewerline replacement - open trench to separate from shared system Tapping main | - |
| 2026-05-22 | Site | 4522 N 10TH ST | Site development for 4522 N 10th St DADU 1 & 2 (submitted under two separate bui… | $63,000 |
| 2026-05-22 | Building | 6443 S WARNER ST | Construct a two-story 962SF 3bed/2ba DADU. Includes plumbing and mechanical scop… | $166,130 |
Phone numbers, websites, license status, and CSV export — for all Tacoma contractors.
Subscribe — $149/mo