| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-07-20 | Residential | 2554 CASTLEWOOD DR, SACRAMENTO, CA 95821 | Electrical service panel replacement or emergency repair only. No additional ele… | $4,650 |
| 2026-07-14 | Residential Electrical | 6430 14TH AVE, SACRAMENTO CA 95820 | Electrical Permit: Demolition of 2 existing electrical duplex panels and replaci… | $6,580 |
| 2026-07-09 | OTC Electrical | 2741 RICE AVE | Single Family - REMOVING (E)125A ELECTRICAL PANEL. REPLACING WITH (N)200A ELECTR… | $4,451 |
| 2026-07-07 | Residential Remodel | 77 WATERGLEN CIR, SACRAMENTO CA 95826 | EPC - Install 50-amp breaker run 6/3 Romex wire from panel to EV charger locatio… | $1,248 |
| 2026-06-03 | Residential Electrical | 212 WAUNITA WAY, SACRAMENTO CA 95838 | E-Permit: existing panel 100 Amps - Overhead service, new main panel 100 Amps, R… | $3,950 |
| 2026-06-03 | Residential Electrical | 60 STARLIT CIR, SACRAMENTO CA 95831 | E-Permit: existing panel 100 Amps - Underground service, new main panel 200 Amps… | $5,000 |
| 2026-06-03 | Residential Electrical | 710 7TH AVE, SACRAMENTO CA 95818 | AA: existing panel 100 Amps - Overhead service, new main panel 200 Amps, N/A wea… | $5,400 |
| 2026-05-27 | Residential Electrical | 518 S ST, SACRAMENTO CA 95811 | AA: existing panel 200 Amps - Overhead service, N/A weather head/masthead work, … | - |
| 2026-05-21 | Residential | 1079 SAN MATEO WAY | Run new #8 AWG wire from the panel to EV charger Install new 2 pole 40breaker In… | $2,355 |
| 2026-05-18 | Residential | 6825 GREENHAVEN DR | Electrical Permit: Whole house re-wire. Carbon monoxide & Smoke alarms required.… | $14,260 |
| 2026-05-15 | Residential | 518 S ST | CONVERTING EXISTING 200 AMP METER PANEL TO 200AMP SUB PANEL, RELOCATING THE MAIN… | $10,000 |
| 2026-05-11 | Residential | 3012 MULVANEY AVE | Install new box and Ev outlet on the back of the panel run wire from a panel to … | $990 |
| 2026-05-11 | Residential | 2601 D ST | Electrical Permit-Add new circuit for induction stove. Install new breaker. Carb… | $2,501 |
| 2026-05-06 | Commercial | 3200 TRUXEL RD | EPC - Remove existing 400 amp 3 phase disconnect and 9 meters Replace with new 4… | $18,705 |
| 2026-05-04 | Residential | 700 ROBERTSON WAY | E-Permit: existing panel 100 Amps - Overhead service, new main panel 100 Amps, R… | $1,485 |
Phone numbers, websites, license status, and CSV export — for all Sacramento contractors.
Subscribe — $149/mo