| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-04-29 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $27,460 |
| 2026-04-09 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $72,756 |
| 2026-03-31 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $9,789 |
| 2026-03-26 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_077 | POWER APPARATUS | $1,100 |
| 2026-03-26 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_077 | POWER APPARATUS | $1,100 |
| 2026-03-25 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $22,680 |
| 2026-03-09 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $10,738 |
| 2026-03-05 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_077 | POWER APPARATUS 3D_082 | PHOTOVOLTAIC SYSTEM… | $31,350 |
| 2026-03-05 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $21,937 |
| 2026-02-26 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $33,423 |
| 2026-02-25 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $26,286 |
| 2026-02-18 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $28,093 |
| 2026-02-18 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $38,270 |
| 2026-01-22 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $6,640 |
| 2026-01-16 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $16,754 |
| 2025-12-11 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_098 | MISCELLANEOUS APPARATUS CONDUITS AND CONDUCT… | $30,800 |
| 2025-12-10 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_077 | POWER APPARATUS 3D_082 | PHOTOVOLTAIC SYSTEM… | $18,046 |
| 2025-12-08 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $107,295 |
| 2025-11-26 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_077 | POWER APPARATUS | $12,474 |
| 2025-11-26 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $6,519 |
| 2025-11-25 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $42,496 |
| 2025-11-25 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $45,499 |
| 2025-11-24 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_104 | ELECTRIC METER TAG PANEL CHANGE OR SERVICE C… | $500 |
| 2025-10-31 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $25,571 |
| 2025-10-30 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $19,797 |
| 2025-10-30 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $92,449 |
| 2025-10-29 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $49,342 |
| 2025-10-29 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $27,612 |
| 2025-10-29 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $60,781 |
| 2025-10-29 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $42,352 |
| 2025-10-28 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $71,005 |
| 2025-10-28 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $62,179 |
| 2025-10-28 | Res | 4305 Dean Martin Dr Ste 150 Las Vegas | BLDGANALYSIS | DESCRIPTION 3D_082 | PHOTOVOLTAIC SYSTEM PER KW (Enter total KW a… | $59,955 |
Phone numbers, websites, license status, and CSV export — for all Las Vegas contractors.
Subscribe — $149/mo