How Much Does a Building Permit Cost in Phoenix, AZ? (2026 Guide)
Phoenix uses a tiered fee structure with same-day over-the-counter permits for simple projects. Here's what to expect in 2026.
Are you a contractor? See live permit data for Phoenix.
Skip the permit-cost research — get daily alerts on new homeowner projects, contractor names, and permit values. Free trial.
View Phoenix Permits →Phoenix is one of the fastest-growing construction markets in the country, and the city's permitting system reflects that with electronic plan review and over-the-counter permits for simple projects. Here's what contractors and builders need to know about permit costs in Phoenix for 2026.
Phoenix Building Permit Costs at a Glance
Phoenix uses a tiered fee structure based on project valuation. The Building Valuation Table was most recently updated on January 20, 2026.
Residential permit costs:
- Projects under $1,000 in value: $150 minimum
- Projects $1,001–$10,000: $150 plus $9.00 per additional $1,000 in value
- Example: A $50,000 remodel would cost approximately $551 in base permit fees
- Plan review fee: 80–100% of the building permit fee (separate charge)
- Swimming pool permits: $180 minimum plus a $30 aquatics program surcharge
Commercial permit costs:
- New construction: $5,000–$50,000+ depending on project size
- Tenant improvements: $1,500–$10,000 depending on scope
- Development impact fees: $2,000–$20,000+ depending on location and building size
Where to Apply for a Building Permit in Phoenix
Permits go through the City of Phoenix Planning and Development Department (PDD).
- Online system: ePlans electronic plan review system
- Over-the-counter permits available for simple residential projects
How Long Does It Take to Get a Building Permit in Phoenix?
- Simple residential projects: Same-day issuance available over the counter
- Standard residential: 2–4 weeks
- Commercial projects: 8–14 weeks total (including typical 2–3 correction cycles)
Special Requirements to Know About
Swimming pool permits carry an additional $30 aquatics program surcharge.
Reinspection fees are $150 per inspection for projects under $1,000 that require more than 2 inspections.
Development impact fees can be $2,000 to $20,000+ depending on location and building size.