2026-05-18
Electrical
—
SPRING VALLEY
Michael and son electrical - replace 200amp main panel/meter combo with new 200a…
200A
replacement
—
☆ Save
2026-05-18
Electrical
—
PARKWOOD
Wire master bedroom, sunroom and kitchen
—
☆ Save
2026-05-18
HVAC/Mech
—
BARNESMORE
Install One 20kw Kohler Air-Cooled Generator. Install Approx. 45' of ACR Gas Pip…
new
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On Permit for units 15, 16, 18 - 23 (Section B), 2…
—
☆ Save
2026-05-18
General Construction
$287,857
SELWIN
new sfr townhouse
residential
—
☆ Save
2026-05-18
HVAC/Mech
$847,215
MEDICAL CENTER
Interior Finish and partial exterior renovation of an existing 1-story building.…
—
☆ Save
2026-05-18
Electrical
—
WATERSTONE
Installing whole home generator and completing gas piping from generator to gas …
—
☆ Save
2026-05-18
HVAC/Mech
—
FAIRFIELD
Installation of in ground fiberglass swimming pool ,and pool barrier.
new
—
☆ Save
2026-05-18
General Construction
—
CAPE FEAR
Stand Alone
—
☆ Save
2026-05-18
Electrical
$166,780
TECHNOLOGY
UPFIT FROM SHELL 25-00873 - Commercial upfit of flex unit (office + warehouse) -…
—
☆ Save
2026-05-18
General Construction
—
CHANNEL HAVEN
FLOODPLAIN/Deck general repairs- add opening in deck framing for exterior elevat…
—
☆ Save
2026-05-18
Electrical
—
HANOVER LAKES
Installing whole home generator and completing gas piping from generator to gas …
—
☆ Save
2026-05-18
General Construction
$266,686
COLLEGE
Do not invoice untial we recieve updated COI for GC/up-fit
—
☆ Save
2026-05-18
Solar
$18,400
DENLY
Solar Installation of 10.725 KW Residential Roof-Mounted PV System at 7317 Denly…
10.725 kW
solar
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On Permit for units 163 - 169 (Section D). Constru…
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On Permit for units 84 - 87 (Section C), 88 - 93 (…
—
☆ Save
2026-05-18
HVAC/Mech
$92,644
RENOVAH
OWNER/Add attached garage
new
—
☆ Save
2026-05-18
Electrical
$2,800
ROBERT E LEE
Provide a 20 amp circuit to the shed and wire the shed with outside lights , ins…
20A
—
☆ Save
2026-05-18
General Construction
$1,500
42ND
Wire for bathroom remodel/20AMPS
20A
—
☆ Save
2026-05-18
HVAC/Mech
—
BANYAN
BURY UNDERGROUND TANK ONLY
—
☆ Save
2026-05-18
HVAC/Mech
—
POSSUM
FLOODPLAIN / Install Inground Swimming Pool
new
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On for units 94 - 100 (Section D). Construction of…
—
☆ Save
2026-05-18
General Construction
$293,261
SELWIN
new sfr townhouse
residential
—
☆ Save
2026-05-18
General Construction
—
CAPE FEAR
Pizza
—
☆ Save
2026-05-18
Electrical
—
PELICAN POINT
Remove and replace main panel exterior of home. No work done to meter base or ov…
replacement
—
☆ Save
2026-05-18
Plumbing
—
ESSEX
Milam Gas piping from existing meter to a new lantern location
new
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On Permit for units 133 - 142 (Section B). Constru…
—
☆ Save
2026-05-18
HVAC/Mech
—
WAYNICK
Installation of a gas fireplace with venting. Gas line, tank, framing, finishing…
new
—
☆ Save
2026-05-18
Signage
$9,154
JETTYS REACH
Remodeling Interior Design Moving Upstairs Bathroom into existing Closet
—
☆ Save
2026-05-18
General Construction
$90,438
SADDLEWORTH
Finish build-out of 4 rooms left unfinished during construction
—
☆ Save
2026-05-18
Electrical
—
BARNESMORE
Install One 20kw Kohler Air-Cooled Generator. Install One 200amp Automatic Trans…
200A
new
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On Permit for units 27 - 29 (Section C), units 30 …
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On Permit for units 64 - 73 (Section B). Construct…
—
☆ Save
2026-05-18
HVAC/Mech
—
OAKLEY
Replacing a 1.5 ton heat pump split system with 5KW heat strips
1.5 tons
heat_pump
—
☆ Save
2026-05-18
General Construction
—
CHAPRA
New well for residential
new_construction
—
☆ Save
2026-05-18
Pool/Spa
—
HEARTHSIDE
annual pool permit
—
☆ Save
2026-05-18
HVAC/Mech
—
HERON
change-out (one) 3 Ton s/s heat pump "like for like" 10kw
3 tons
heat_pump
replacement
—
☆ Save
2026-05-18
Electrical
$5,000
MARVIN
Installation of pool equipment and bonding/200AMPS
200A
new
—
☆ Save
2026-05-18
Electrical
—
WATERSTONE
Installing whole home generator with 200 amp ATS
200A
—
☆ Save
2026-05-18
Plumbing
—
MCRAE
Install NG 2psi 1/2 copper gas line in trench from meter to firepit location. In…
line work
new
—
☆ Save
2026-05-18
Fire Protection
—
GINGERWOOD
INSTALL NEW DUAL PTH CELLULAR COMMUNICATOR TO EXISTING FIRE ALARM SYSTEM
new
—
☆ Save
2026-05-18
Electrical
$3,500
LUNAR
Installation of pool sub panel and associated branch circuits and equipotential …
new
—
☆ Save
2026-05-18
HVAC/Mech
—
TIDEWATER
Replace existing system with a 2.5 Ton 8 KW heat pump split system.
2.5 tons
heat_pump
replacement
—
☆ Save
2026-05-18
HVAC/Mech
—
TALON
Like for like replacement of 3 Ton HP w/8-10 KW Heat Kit including Ductwork.
3 tons
replacement
—
☆ Save
2026-05-18
Pool/Spa
—
BRIDGE
Year Round Pool Permit
—
☆ Save
2026-05-18
Electrical
$30,395,105
GOVERNMENT CENTER
Live Wire Electric: Prior Cut On Permit for units 202 - 211 (Section B). Constru…
—
☆ Save
2026-05-18
HVAC/Mech
—
PARK
Like for like replacement of 2 Ton HP w/5 KW Heat Kit.
2 tons
replacement
—
☆ Save
2026-05-18
General Construction
$279,034
SELWIN
new sfr townhouse
residential
—
☆ Save
2026-05-18
HVAC/Mech
—
BREEZEWOOD
HVAC Equipment changeout, reconnect at the disconnect. 3 ton 7.5 KW
3 tons
replacement
—
☆ Save
2026-05-18
HVAC/Mech
—
PEDEN POINT
FLOODPLAIN / Like for like package heat pump change out.
heat_pump
replacement
—
☆ Save