Bethesda Building Permits & Property Data

798 indexed permits · Bethesda, Maryland.

Not shared leads. Not a marketplace. Every record is a public permit filing you can verify yourself — your competitors aren't handed the same list. One closed job typically covers the whole year. Cancel anytime in one click — no retention call.

PermitGrab tracks 798 building permits in Bethesda, MD as of 2026-06-11. Updated periodically.

Lagging · Expected daily • newest record 3d old

PermitGrab is a $149/mo subscription that surfaces every Bethesda building permit, contractor record, and code violation from the official municipal feed within 12-24 hours of filing — used by solar installers, roofers, HVAC contractors, real-estate investors, and insurance restoration teams to acquire leads at the moment a homeowner commits to a project. 14-day free trial below — cancel anytime in one click.

Filter Bethesda leads by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

798
Indexed Permits
0
Active Contractors
2026-06-11
Last Updated
Updated recently · 2026-06-18
📊 View Bethesda live permit pulse →
Bethesda had 209 new building permits filed in the last 30 days, led by 93 electrical, 26 landscaping & exterior and 24 hvac. The average project value is $189,949.

🔔 Get Daily Bethesda Permit Alerts

New permits, violations, and contractor activity delivered to your inbox.

📥 Export CSV 📊 Report

All permits

🔎 See for yourself — free: click any Reveal button to unmask up to 10 real contractor phone numbers. No account needed.

798 records — permits and code violations sorted by date

Date Type Value Address Details Contractor / Status Save
2025-11-24 General Construction 10200
Owner: LAN··· 🔒
Customer Wants To Use ePlans,Install (1) Tesla Powerwall 3
2025-11-24 Roofing 5600
Owner: ROC··· 🔒
Customer Wants To Use ePlans,NEW SINGLE FAMILY HOME, NEW CONCRETE FOUNDATION W/ …
2025-11-24 Windows/Doors 5336
Owner: MOR··· 🔒
Interior work only, Per Preliminary Inspection for ADU Licensing: - Replace curr…
2025-11-24 HVAC/Mech 9308
Owner: WES··· 🔒
Interior work only,Finish existing basement with new framing, insulation, drywal…
2025-11-24 General Construction 6208
Owner: 620··· 🔒
Revision 1 - add 14 surface mounted LED floodlights. Replace 6 existing lights w…
2025-11-24 General Construction 5807
Owner: BLU··· 🔒
2nd floor addition on top of existing 1st floor. Minor MPE as required.
2025-11-24 General Construction 5910
Owner: OWC··· 🔒
Front porch renovation extension
2025-11-24 General Construction 6101
Owner: HEU··· 🔒
This project consists of enlarging existing master bathroom and re-do master clo…
2025-11-22 Solar 7614
Owner: BAU··· 🔒
Customer Wants To Use ePlans,INSTALL (11) ROOF MOUNTED SOLAR PANELS, 4.45 KW
2025-11-21 General Construction 5519 Customer Wants To Use ePlans,Build Single Family dwelling with attached 2 car ga…
2025-11-21 Solar 9306
Owner: MCC··· 🔒
Customer Wants To Use ePlans,Install (18) Roof Mounted Solar Panels. System Size…
2025-11-21 Roofing 5527
Owner: SAM··· 🔒
Customer Wants To Use ePlans,NEW SINGLE FAMILY HOME, NEW CONCRETE FOUNDATION W/ …
2025-11-21 General Construction 7709
Owner: SCH··· 🔒
This is for the installation of a 14' x 20' concrete pad, covered in flagstone f…
2025-11-20 General Construction 6205
Owner: SCH··· 🔒
NEW PRE-FAB 12' X 14' SHED ON 4"" CONCRETE SLAB,New ShedMaximum height cannot ex…
2025-11-20 General Construction 9505
Owner: CIT··· 🔒
Customer Wants To Use ePlans Interior work only,Interior alterations and repair …
2025-11-20 General Construction 5214
Owner: CIT··· 🔒
Renovation and second floor additioncustomer states 4269.  Add 2463 Alt 220…
2025-11-20 Solar 6417
Owner: LES··· 🔒
Revision 1 - REVISING THE PANELS FROM QCELLS TO JAM54D41 PANELS,Customer Wants T…
2025-11-19 Roofing 6212
Owner: MCG··· 🔒
Customer Wants To Use ePlans,To install 9.24kW dc (21 modules) on roof of buildi…
2025-11-19 General Construction 6908
Owner: RIV··· 🔒
Revision 1 - Revision needed to address Bannockburn Covenants,Customer Wants To …
2025-11-19 Windows/Doors 8308
Owner: NUL··· 🔒
Customer Wants To Use ePlans,We are proposing to cut the existing upper level re…
2025-11-19 Solar 4623
Owner: FZ ··· 🔒
Customer Wants To Use ePlans,INSTALL (10) ROOF MOUNTED SOLAR PANELS, 4.40 KW
2025-11-19 General Construction 5435
Owner: SME··· 🔒
Customer Wants To Use ePlans,THE CONSTRUCTION OF A PROPOSED SINGLE FAMILY RESIDE…
2025-11-19 Solar 8114
Owner: RIT··· 🔒
Customer Wants To Use ePlans,Installation of 17 (445w) solar panels on the roof …
2025-11-19 Solar 6422
Owner: DUV··· 🔒
Revision 1 - Length of trench decreased from 85ft to ft 30ft,Customer Wants To U…
2025-11-19 Solar 4101
Owner: KMI··· 🔒
Customer Wants To Use ePlans,INSTALL (29) ROOF MOUNTED SOLAR PANELS, 12.76 KW
2025-11-19 Solar 5028
Owner: YOC··· 🔒
Revision 1 - Removed the EV charger from the scope of work and plan set. We are …
2025-11-17 General Construction 9200
Owner: FRA··· 🔒
Addition of a garage to the existing house. Special Exception
2025-11-17 General Construction 9602
Owner: PON··· 🔒
Customer Wants To Use ePlans,New construction of a single family house.
2025-11-17 General Construction 9211
Owner: HOL··· 🔒
Repair damage to garage and breezeway due to tree strike. Replace damaged 2x6 ra…
2025-11-17 General Construction 6962
Owner: BUC··· 🔒
Revision 2 Approved 4/13/2026 - REVISION RECEIVED 4/8/2026- TO CONSTRUCT 14'-3""…
2025-11-14 General Construction 5105
Owner: ALS··· 🔒
Customer Wants To Use ePlans,THE CONSTRUCTION OF A PROPOSED SINGLE FAMILY RESIDE…
2025-11-14 Roofing 5614
Owner: ADA··· 🔒
Revision 1 - Changed first floor ceiling height to 9ft Raised house 1ft and adju…
2025-11-14 Solar 9417
Owner: KAV··· 🔒
Revision 1 - Wire ID 2 on the electrical diagram has been updated to be #10 THHN…
2025-11-13 General Construction 7019
Owner: ALM··· 🔒
Interior work only, Remodel existing kitchen.
2025-11-13 Solar 5303
Owner: MUL··· 🔒
Customer Wants To Use ePlans,INSTALLING 37 ASPHALT ROOF MOUNTED SOLAR PANELS - 1…
2025-11-12 Solar 9815
Owner: STE··· 🔒
Customer Wants To Use ePlans,Install (30) Roof Mounted Solar Panels. System Size…
2025-11-12 HVAC/Mech 9203
Owner: JOH··· 🔒
CONSTRUCT A TWO STORY REAR ADDITION. REMODEL THE EXISTING KITCHEN AND EXISTING B…
2025-11-12 General Construction 5514
Owner: KOO··· 🔒
Expand rear of house for new kitchen. Raise rec. room floor. Add second floor ad…
2025-10-09 General Construction 5600 BROOKSIDE DR
Owner: 560··· 🔒
Please do not request inspections under this permit until 2 business days after …
2025-10-02 General Construction 7220 WISCONSIN AVE Please do not request inspections under this permit until 2 business days after …
2025-10-01 General Construction 5632 BROOKSIDE DR Please do not request inspections under this permit until 2 business days after …
2025-09-30 General Construction 5620 BROOKSIDE DR Please do not request inspections under this permit until 2 business days after …
2025-09-30 General Construction 5624 BROOKSIDE DR Please do not request inspections under this permit until 2 business days after …
2025-09-29 General Construction 5612 BROOKSIDE DR
Owner: FIT··· 🔒
Please do not request inspections under this permit until 2 business days after …
2025-09-29 General Construction 7101 DEMOCRACY BLVD Please do not request inspections under this permit until 2 business days after …
2025-09-29 General Construction 5604 BROOKSIDE DR
Owner: SWE··· 🔒
Please do not request inspections under this permit until 2 business days after …
2025-09-17 General Construction 5616 BROOKSIDE DR
Owner: LYO··· 🔒
Please do not request inspections under this permit until 2 business days after …
2025-09-17 General Construction 5640 BROOKSIDE DR Please do not request inspections under this permit until 2 business days after …
Page 16 of 16 ← Prev 1 2 15 16

No contractor lead data available for Bethesda. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Bethesda
Construction Activity in Bethesda

New building permits in Bethesda, Maryland indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Bethesda Building Permits

Bethesda, Maryland processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 798+ Bethesda building permits — updated periodically from official city sources.

Every new construction project in Bethesda requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Bethesda.

How Contractors Use Bethesda Permit Data

HVAC contractors, electricians, plumbers, and roofers in Bethesda use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Bethesda building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Bethesda electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Reviewed by Marcus Reeves · Page data current as of · Sources: official Bethesda open data portal.

Who pulled permits in Bethesda this week?

PermitGrab indexes 798 building permits in Bethesda, with new filings from the city's permit feed on every refresh.

How fresh is Bethesda permit data?

The most recent permit indexed for Bethesda is dated 2026-06-18. Expected daily • newest record 3d old. Permit records carry filing date, address, project value, contractor name (where the source publishes it), and permit type, so a fresh row means a fresh lead.

What construction is happening in Bethesda right now?

In the last 30 days, Bethesda permitting activity covers 209 new building permits. The mix spans new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, and tenant improvements — every record is a buying signal for a different contractor or supplier persona.

Three plays that win in Bethesda

Lists are for mailing. Phones are for closing.

📞

The same-day call

Filter Bethesda to your trade each morning. Every fresh permit shows the contractor with a verified phone — call the GC to sub, call the owner to upsell the next phase, while competitors are still printing postcards.

🕵️

The competitor watch

Search any competitor's name and see every job they pulled in Bethesda — where they're working, what they're charging the city in declared value, and which neighborhoods they own. Pitch the follow-on work at each address.

🚨

The motivated-seller list

Code violations matched to property owners. An owner facing a citation is the warmest restoration, repair, or wholesale-offer lead there is — and no marketplace sells this list.

Run these plays in Bethesda — $149/mo
Nearby Maryland Cities — explore building permits in other Maryland cities

Turn Bethesda permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. 14-day trial for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Bethesda Building Permits

How many building permits does PermitGrab track in Bethesda?

PermitGrab currently tracks 798 building permits in Bethesda, Maryland. Data is pulled directly from the official municipal open-data source on every collection cycle and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Bethesda permit data?

PermitGrab collects Bethesda on every daemon cycle. Its municipal source is currently updated periodically, so new permits appear here within 1–3 days of the source publishing them. The count above reflects the complete current record from that source.

How can contractors find construction leads in Bethesda?

Contractors find leads in Bethesda by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Bethesda — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Bethesda permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Code violations in Bethesda = motivated sellers. Out-of-state landlord + active citation = top of the wholesale call list.
Contractors & subs
Every Bethesda GC who pulled a permit this week is sourcing labor and materials right now. Phone numbers included.
Home service companies
A Bethesda addition or remodel signals an HVAC, plumbing, or warranty upsell window. Reach owners while the project is fresh.
Solar installers
Roof permits and electrical upgrades in Bethesda are the highest-intent solar lead signals. Owner-occupant filter built in.
Insurance agents
Bethesda renovations trigger updated dwelling-coverage limits. Get the address-level signal before the renewal cycle does.
Material suppliers
Lumber, drywall, roofing, fixtures — every Bethesda permit is a parts list. Build a route by job type and value tier.
Developers & new construction
Ground-up builds in Bethesda mean a long runway of subcontractor and material orders. Sort new-construction permits by project value and reach the GC before the trades are locked.
Free resources

More on Bethesda & U.S. construction activity

U.S. Construction Permit Pulse
Our 90-day data report: permit volume by metro, hottest trades, and average project values. Free to read and cite.
Free permit tools
Live permit checker, national pulse dashboard, and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients you track live Bethesda permit activity — copy one line of HTML for your website.

More Maryland permit data

Anne Arundel County permits Montgomery County permits Silver Spring permits Silver Spring permits Rockville permits Gaithersburg permits Potomac permits Germantown permits Chevy Chase permits Chevy Chase permits

Bethesda by trade

Bethesda roofing permits Bethesda hvac permits Bethesda electrical permits Bethesda plumbing permits Bethesda solar permits
Start 14-Day Trial →
14-day
14-day trial