Bethesda Building Permits & Contractor Leads

Live municipal building-permit feed for Bethesda, Maryland.

PermitGrab tracks 0 active contractors who pulled 696 building permits in Bethesda, MD as of 2026-06-09. Updated periodically.

Up to date · Updated daily • newest record from 1d ago

PermitGrab is a $149/mo subscription that surfaces every Bethesda building permit, contractor record, and code violation from the official municipal feed within 12-24 hours of filing — used by solar installers, roofers, HVAC contractors, real-estate investors, and insurance restoration teams to acquire leads at the moment a homeowner commits to a project. 14-day free trial below — cancel anytime in one click.

Filter Bethesda leads by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

696
Indexed Permits
0
Active Contractors
2026-06-09
Last Updated
Updated recently · 2026-06-09
📊 View Bethesda live permit pulse →
Bethesda had 152 new building permits filed in the last 30 days, led by 91 electrical, 26 hvac and 15 general construction.

🔔 Get Daily Bethesda Permit Alerts

New permits, violations, and contractor activity delivered to your inbox.

📥 Export CSV 📊 Report

All permits

696 records — permits and code violations sorted by date

Date Type Value Address Details Contractor / Status Save
2025-12-11 Plumbing 9207 Interior work only,THE EXISITING STRUCTURE WAS FIRE DAMAGED. THE OWNER WOULD LIK…
2025-12-10 General Construction 4605 Customer Wants To Use ePlans,Demo rebuild. 5239 sf including garage and front po…
2025-12-10 General Construction 7604 Retaining Wall Permit
2025-12-10 Solar 6004 Customer Wants To Use ePlans,SFD / INSTALL [14] Roof Mounted Solar Install of 6.…
2025-12-10 General Construction 6929 Customer Wants To Use ePlans,AMALYN lot 4A FAIRLANE
2025-12-10 General Construction 5115 Customer Wants To Use ePlans,New detached single family home
2025-12-09 Solar 8514 Revision 1 - Changed interconnection from Breaker Tap to Line Side Tap,Customer …
2025-12-09 HVAC/Mech 6305 Finish basement to include laundry area, family area, half bathroom, storage and…
2025-12-09 Roofing 7100 Revision 1 - INTERIOR RENOVATION & MAIN LEVEL ADDITION - THE SCOPE OF WORK INCLU…
2025-12-09 General Construction 7926 Customer Wants To Use ePlans Interior work only to an existing 2-story home&nbsp…
2025-12-09 Roofing 4505 Customer Wants To Use ePlans, To install 5.72kw dc(13 modules) on roof of the bu…
2025-12-08 General Construction 5506 Customer Wants To Use ePlans,Add a 5x9 covered front porch on the entrance of th…
2025-12-08 General Construction 6530 Replace existing metal railing with wood railing and black balusters., Repair Ex…
2025-12-06 Solar 9300 Revision 1 - SWITCHED QCELLS TO JA SOLAR PANELS (JAM54D41) ,Customer Wants To Us…
2025-12-06 Solar 7212 Customer Wants To Use ePlans,INSTALL (36) ROOF MOUNTED SOLAR PANELS, 14.58 KW
2025-12-05 Solar 5108 Customer Wants To Use ePlans,Install (14) Roof Mounted Solar Panels. System Size…
2025-12-04 Solar 5928 Customer Wants To Use ePlans,Installation of 48 solar panels on the roof top in …
2025-12-04 General Construction 7026 TO CONSTRUCT (4) 4' W STEPS TO GRADE PER CO TYPICAL DECK DETAILS W/ TREX RAILS ,…
2025-12-04 Demolition 6010 Customer Wants To Use ePlans,Demolish existing single family home and build a ne…
2025-12-04 General Construction 8505 CONSTRUCT 434 SQ/FT COMPOSITE DECK NO STEPS,New Deck
2025-12-04 Solar 5128 Customer Wants To Use ePlans,INSTALL (49) ROOF-MOUNTED SOLAR PANELS FOR 20.09 KW
2025-12-04 General Construction 7607 Interior work only,Remodel Existing Kitchen and Mudroom on First Floor, Re-locat…
2025-12-04 Roofing 4 Addition of a new master bedroom and study on the first floor and a new studio i…
2025-12-04 Solar 7820 Revision 2 - Relocation as noted by the planset ,Customer Wants To Use ePlansRev…
2025-12-04 Solar 6205 Revision 1 - SWITCHING QCELLS TO JA PANELS (JAM54D41) 6.160 kW ,Customer Wants T…
2025-12-03 Demolition 7404 Addition of a new mud room, powder room, dining room and TV room with the whole …
2025-12-03 General Construction 5410 Replace a rear deck creating a 15x10 new deck and a set of stand alone stairs le…
2025-12-03 Roofing 5020 Customer Wants To Use ePlans, To install 9.68kw dc(22 modules) on roof of the bu…
2025-12-02 Windows/Doors 8017 Customer Wants To Use ePlans,New screened porch addition with electrical fixture…
2025-12-02 Solar 5311 Revision 1 - Updating the system controller location from the left panel instead…
2025-12-02 Solar 4608 Revision 1 - SWITCHED QCELLS TO JA SOLAR PANELS (JAM54D41) ,Customer Wants To Us…
2025-12-02 General Construction 6301 Customer Wants To Use ePlans Interior work only,NEW POWDER ROOM @ BASEMENT
2025-12-01 General Construction 9001 Screened porch addition to rear.
2025-12-01 General Construction 9712 Building new lower level (23' x 16') open deck with stairs alongside a (7' x 9')…
2025-11-28 General Construction 5816 Customer Wants To Use ePlans,Remove existing driveway and restore curb, construc…
2025-11-28 Solar 5307 Customer Wants To Use ePlans,Install (43) Roof Mounted Solar Panels. System Size…
2025-11-26 Solar 6400 Customer Wants To Use ePlans,Temporary removal and reinstallation of 26 existing…
2025-11-26 General Construction 6834 Remove screens from existing covered porch and replace with 4 season sunroom wal…
2025-11-26 Fire Protection 4506 Customer Wants To Use ePlans Interior work only,CONVERT EXISTING GARAGE SPACE IN…
2025-11-26 Solar 7301 Customer Wants To Use ePlans,Installation of [35] roof mounted solar panels on t…
2025-11-26 General Construction 7916 Customer Wants To Use ePlans,Addition to existing detached single family home De…
2025-11-26 General Construction 5812 Install new 14'x16' Louvered Pergola on a an existing patio APPROVED AS DETACHED…
2025-11-26 Solar 7608 Customer Wants To Use ePlans,Install (28) panel rooftop solar system 12.04KW
2025-11-26 General Construction 5532 NEW SINGLE FAMILY HOME
2025-11-25 General Construction 6001 Construct new retaining walls
2025-11-25 Pool/Spa 6010 Construct a 14' x 28' inground concrete pool, 600 sq. ft pool patio
2025-11-25 General Construction 7805 Add a screened in porch.
2025-11-25 General Construction 6962 Customer Wants To Use ePlans,AMALYN DECA lot 8M
2025-11-24 General Construction 10200 Customer Wants To Use ePlans,Install (1) Tesla Powerwall 3
2025-11-24 Windows/Doors 5336 Interior work only, Per Preliminary Inspection for ADU Licensing: - Replace curr…
Page 13 of 14 ← Prev 1 2 12 13 14 Next →

No contractor lead data available for Bethesda. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Bethesda
Construction Activity in Bethesda

New building permits in Bethesda, Maryland indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Bethesda Building Permits

Bethesda, Maryland processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 696+ Bethesda building permits — updated periodically from official city sources.

Every new construction project in Bethesda requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Bethesda.

How Contractors Use Bethesda Permit Data

HVAC contractors, electricians, plumbers, and roofers in Bethesda use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Bethesda building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Bethesda electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Reviewed by Marcus Reeves · Page data current as of · Sources: official Bethesda open data portal.

Who pulled permits in Bethesda this week?

PermitGrab tracks 0 active contractors in Bethesda, with new permit filings indexed from the city's open data portal on every refresh.

How fresh is Bethesda permit data?

The most recent permit indexed for Bethesda is dated 2026-06-09. Updated daily • newest record from 1d ago. Permit records carry filing date, address, project value, contractor name (where the source publishes it), and permit type, so a fresh row means a fresh lead.

What construction is happening in Bethesda right now?

In the last 30 days, Bethesda permitting activity covers 152 new building permits. The mix spans new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, and tenant improvements — every record is a buying signal for a different contractor or supplier persona.

Nearby Maryland Cities — explore building permits in other Maryland cities

Turn Bethesda permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. 14-day trial for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Bethesda Building Permits

How many building permits does PermitGrab track in Bethesda?

PermitGrab currently tracks 696 building permits in Bethesda, Maryland. Data is pulled directly from the official municipal open-data source on every collection cycle and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Bethesda permit data?

PermitGrab collects Bethesda on every daemon cycle. Its municipal source is currently updated periodically, so new permits appear here within 1–3 days of the source publishing them. The count above reflects the complete current record from that source.

How can contractors find construction leads in Bethesda?

Contractors find leads in Bethesda by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Bethesda — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Bethesda permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Code violations in Bethesda = motivated sellers. Out-of-state landlord + active citation = top of the wholesale call list.
Contractors & subs
Every Bethesda GC who pulled a permit this week is sourcing labor and materials right now. Phone numbers included.
Home service companies
A Bethesda addition or remodel signals an HVAC, plumbing, or warranty upsell window. Reach owners while the project is fresh.
Solar installers
Roof permits and electrical upgrades in Bethesda are the highest-intent solar lead signals. Owner-occupant filter built in.
Insurance agents
Bethesda renovations trigger updated dwelling-coverage limits. Get the address-level signal before the renewal cycle does.
Material suppliers
Lumber, drywall, roofing, fixtures — every Bethesda permit is a parts list. Build a route by job type and value tier.
Developers & new construction
Ground-up builds in Bethesda mean a long runway of subcontractor and material orders. Sort new-construction permits by project value and reach the GC before the trades are locked.
Free resources

More on Bethesda & U.S. construction activity

U.S. Construction Permit Pulse
Our 90-day data report: permit volume by metro, hottest trades, and average project values. Free to read and cite.
Free permit tools
Live permit checker, national pulse dashboard, and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients you track live Bethesda permit activity — copy one line of HTML for your website.
Start 14-Day Trial →
14-day
14-day trial