Bethesda Building Permits & Contractor Leads

Live municipal building-permit feed for Bethesda, Maryland.

PermitGrab tracks 0 active contractors who pulled 702 building permits in Bethesda, MD as of 2026-06-09. Updated periodically.

Up to date · Updated daily • newest record from 1d ago

PermitGrab is a $149/mo subscription that surfaces every Bethesda building permit, contractor record, and code violation from the official municipal feed within 12-24 hours of filing — used by solar installers, roofers, HVAC contractors, real-estate investors, and insurance restoration teams to acquire leads at the moment a homeowner commits to a project. 14-day free trial below — cancel anytime in one click.

Filter Bethesda leads by trade: solar · roofing · HVAC · electrical · fire protection · new construction.

702
Indexed Permits
0
Active Contractors
2026-06-09
Last Updated
Updated recently · 2026-06-09
📊 View Bethesda live permit pulse →
Bethesda had 152 new building permits filed in the last 30 days, led by 91 electrical, 26 hvac and 15 general construction.

🔔 Get Daily Bethesda Permit Alerts

New permits, violations, and contractor activity delivered to your inbox.

📥 Export CSV 📊 Report

All permits

702 records — permits and code violations sorted by date

Date Type Value Address Details Contractor / Status Save
2026-01-07 Roofing 5213 Revision 1 4/30/2026 - structural revision, add LVL headers to roof for bracing,…
2026-01-06 General Construction 7022 Customer Wants To Use ePlans,AMALYN lot 2M CHATWAL
2026-01-06 General Construction 5206 Reconfigure existing powder room to add a new shower
2026-01-05 Pool/Spa 6303 Building inground swimming pool with automatic safety cover.
2026-01-05 General Construction 9001 Addition and alterations to existing detached single family home ALTERATIONS: 66…
2026-01-05 General Construction 6903 ROCKLEDGE DR Please do not request inspections under this permit until 2 business days after …
2025-12-31 General Construction 9109 SCOPE ADD ADDITIONAL FRAME AND SUPPORT FOR NEW TREATED PORCH WITH COMPOSITE DECK…
2025-12-31 General Construction 7101 WISCONSIN AVE Please do not request inspections under this permit until 2 business days after …
2025-12-30 Solar 9839 Customer Wants To Use ePlans,Temporary removal and reinstallation of 31 existing…
2025-12-30 General Construction 7312 Customer Wants To Use ePlans,Construct new detached single family home Customer …
2025-12-30 Windows/Doors 111 Revision 1141070 - Modification to the front porch.Build front and rear porch.En…
2025-12-30 General Construction 5103 2F bath: replace shower/tub trim & valve. 3F bath: replace floor & wall …
2025-12-30 General Construction 8707 Revision 1144515 - Length is changing from 18' to 26-1/2' and we are adding 4 ad…
2025-12-29 General Construction 8301 WISCONSIN AVE Please do not request inspections under this permit until 2 business days after …
2025-12-29 Demolition 5919 Customer Wants To Use ePlans,Demolishing the existing house and building a new t…
2025-12-29 General Construction 8307 Customer Wants To Use ePlans,We are adding a dry-stack retaining wall with a max…
2025-12-29 Structural 6306 Interior work only,Interior renovation with structural alterations. Installation…
2025-12-26 HVAC/Mech 8908 LEVEL 2 IEBC ALTERATION IMPACTING 600 SF TO AN EXISTING 11,568 SF DETACHED SINGL…
2025-12-26 General Construction 6417 Customer Wants To Use ePlans Interior work only,Interior renovation only. Remode…
2025-12-26 General Construction 10109 Interior work only, The Owner had an elevator installed, the contractor advised …
2025-12-24 Solar 9623 Customer Wants To Use ePlans,Temporary removal and reinstallation of 18 existing…
2025-12-24 Solar 5009 Revision 1 - Switch out JA Panels to QCells and amend kW to 8.265 kW,Customer Wa…
2025-12-24 General Construction 9702 Customer Wants To Use ePlans,EXG SFD TO HAVE REAR ADDITION, FRONT PORCH, 2ND STO…
2025-12-24 General Construction 5827 New Detached 12 by 12 screened porch,
2025-12-24 Windows/Doors 4507 Pull and replace kitchen remodel, pull and replace second floor hall bath remode…
2025-12-23 General Construction 9712 Interior work only, Master Batroom Renovation and Laundry Room Renovation
2025-12-23 General Construction 5819 Customer Wants To Use ePlans,Replace existing deck with a screen porch and new d…
2025-12-22 Solar 6005 Revision 1 - Installation of 17 roof mounted solar panels.,Customer Wants To Use…
2025-12-22 General Construction 8711 Finished basement to provide new full Bathroom with pre fab Sauna
2025-12-22 General Construction 9100 CONSTRUCTION OF A NEW 2 STORY ADDITION AND INTERIOR RENOVATION TO AN EXISTING SI…
2025-12-19 General Construction 9313 Customer Wants To Use ePlans,Tear down existing single family detached dwelling …
2025-12-19 General Construction 6204 Installation of foundation piers
2025-12-18 Solar 8520 Customer Wants To Use ePlans,INSTALLING 39 ASPHALT ROOF MOUNTED SOLAR PANELS - 1…
2025-12-18 Solar 6821 Revision 1 - Design change resulted in different solar panels being used for ins…
2025-12-18 Battery Storage 5208 Customer Wants To Use ePlans, To install 22kw dc(50 modules) on roof of the buil…
2025-12-18 General Construction 6000 Fire damage repair to garage header, subfloor, and 2x4 framing in upstairs bedro…
2025-12-18 Solar 9500 Revision 1 - SWITCHING QCELL PANELS TO JA SOLAR (JAM54D41) PANELS 5.28kW ,Custom…
2025-12-18 Solar 6112 Customer Wants To Use ePlans,Installation of 2 energy storage systems (20kWh) Ad…
2025-12-18 General Construction 9408 Customer Wants To Use ePlans,THE CONSTRUCTION OF A PROPOSED SINGLE FAMILY RESIDE…
2025-12-18 General Construction 5912 New deck.,New Deck DECK DETAILS
2025-12-17 Windows/Doors 5320 We are relocating the front door and extending the portico & landing, adding…
2025-12-17 General Construction 6515 Customer Wants To Use ePlans,This project is the interior renovation of two exis…
2025-12-17 General Construction 6927 Customer Wants To Use ePlans,Amalyn lot 15A DECAhouse- 8420porches- 667customer …
2025-12-16 General Construction 5408 The project will consist of an addition to and the remodeling of the existing si…
2025-12-16 Solar 8012 Customer Wants To Use ePlans,Installation of 46 445w solar panels on the rooftop…
2025-12-16 Solar 5920 Customer Wants To Use ePlans,Installation of 25 roof mounted solar panels.
2025-12-16 Windows/Doors 9903 Customer Wants To Use ePlans,Remove non bearing wall between kitchen and dining …
2025-12-16 Structural 5523 Customer Wants To Use ePlans,Construct new portico per code, matching house styl…
2025-12-16 Solar 6430 INSTALL (45) ROOF MOUNTED SOLAR PANELS, 19.80 KW
2025-12-15 General Construction 9512 Customer Wants To Use ePlans,BEAUTIFUL NEW SINGLE FAMILY HOME
Page 12 of 15 ← Prev 1 2 11 12 13 14 15 Next →

No contractor lead data available for Bethesda. The city's permit feed publishes addresses and project values but doesn't expose contractor names. Property-owner and permit details are still available below.

Permit Types in Bethesda
Construction Activity in Bethesda

New building permits in Bethesda, Maryland indicate upcoming construction projects. Contractors can identify subcontracting opportunities by monitoring recently issued permits for residential renovations, commercial buildouts, and new construction. Early outreach to permit holders often results in higher close rates before projects go to competitive bid.

About Bethesda Building Permits

Bethesda, Maryland processes thousands of building permits covering residential construction, commercial buildouts, renovations, and specialty trade work. PermitGrab tracks 702+ Bethesda building permits — updated periodically from official city sources.

Every new construction project in Bethesda requires a building permit before work can begin. These public records include the project address, scope of work, estimated cost, and often the general contractor's name — making them valuable leads for subcontractors looking for new projects in Bethesda.

How Contractors Use Bethesda Permit Data

HVAC contractors, electricians, plumbers, and roofers in Bethesda use building permit data to find projects before they hit traditional lead services. When a new commercial buildout or residential renovation permit is filed, it signals upcoming work that needs subcontractors.

Instead of competing for shared leads on HomeAdvisor or Angi, contractors who monitor Bethesda building permits can reach out to general contractors the day a permit is issued — before anyone else calls. This first-mover advantage leads to higher close rates and better project selection.

PermitGrab sends daily email alerts filtered by trade, so Bethesda electrical contractors only see electrical permits, HVAC contractors only see mechanical permits, and so on.

Reviewed by Marcus Reeves · Page data current as of · Sources: official Bethesda open data portal.

Who pulled permits in Bethesda this week?

PermitGrab tracks 0 active contractors in Bethesda, with new permit filings indexed from the city's open data portal on every refresh.

How fresh is Bethesda permit data?

The most recent permit indexed for Bethesda is dated 2026-06-09. Updated daily • newest record from 1d ago. Permit records carry filing date, address, project value, contractor name (where the source publishes it), and permit type, so a fresh row means a fresh lead.

What construction is happening in Bethesda right now?

In the last 30 days, Bethesda permitting activity covers 152 new building permits. The mix spans new construction, residential renovations, mechanical/electrical/plumbing upgrades, roof replacements, demolitions, and tenant improvements — every record is a buying signal for a different contractor or supplier persona.

Nearby Maryland Cities — explore building permits in other Maryland cities

Turn Bethesda permits into leads

Daily email digest of new permits, plus verified contractor phone & website data. 14-day trial for alerts; $149/mo unlocks full contractor contacts.

See Pricing Set Up Free Alerts

Frequently Asked Questions about Bethesda Building Permits

How many building permits does PermitGrab track in Bethesda?

PermitGrab currently tracks 702 building permits in Bethesda, Maryland. Data is pulled directly from the official municipal open-data source on every collection cycle and includes permit number, address, permit type, contractor, status, and estimated value where available.

How fresh is the Bethesda permit data?

PermitGrab collects Bethesda on every daemon cycle. Its municipal source is currently updated periodically, so new permits appear here within 1–3 days of the source publishing them. The count above reflects the complete current record from that source.

How can contractors find construction leads in Bethesda?

Contractors find leads in Bethesda by filtering PermitGrab by trade and ZIP code, then contacting the permit applicant (owner or general contractor) directly. Pro subscribers get verified phone numbers and can set up saved-search email alerts so new matches land in their inbox the same day they’re filed.

What’s included in the 14-day trial?

The 14-day trial includes full Pro access to Bethesda — unlimited phone and website reveals, CSV export, trade and value-tier filters, lead scoring, and violation cross-reference flags. Card required to start; cancel anytime before day 14.

Can I cancel anytime?

Yes. Cancel any time from your account page — no contracts, no cancellation fees. Your subscription stays active through the end of the current billing period.

Who buys this data?

Bethesda permit & owner data, by use case

Same data, different angle. Pick the playbook that matches what you sell.

Real estate investors
Code violations in Bethesda = motivated sellers. Out-of-state landlord + active citation = top of the wholesale call list.
Contractors & subs
Every Bethesda GC who pulled a permit this week is sourcing labor and materials right now. Phone numbers included.
Home service companies
A Bethesda addition or remodel signals an HVAC, plumbing, or warranty upsell window. Reach owners while the project is fresh.
Solar installers
Roof permits and electrical upgrades in Bethesda are the highest-intent solar lead signals. Owner-occupant filter built in.
Insurance agents
Bethesda renovations trigger updated dwelling-coverage limits. Get the address-level signal before the renewal cycle does.
Material suppliers
Lumber, drywall, roofing, fixtures — every Bethesda permit is a parts list. Build a route by job type and value tier.
Developers & new construction
Ground-up builds in Bethesda mean a long runway of subcontractor and material orders. Sort new-construction permits by project value and reach the GC before the trades are locked.
Free resources

More on Bethesda & U.S. construction activity

U.S. Construction Permit Pulse
Our 90-day data report: permit volume by metro, hottest trades, and average project values. Free to read and cite.
Free permit tools
Live permit checker, national pulse dashboard, and a free city-by-city volume lookup — no signup required.
Permit activity badge
Show clients you track live Bethesda permit activity — copy one line of HTML for your website.
Start 14-Day Trial →
14-day
14-day trial