| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-07-20 | Plumbing | 2021 GRAND CONCOURSE | Plumbing | $45,000 |
| 2026-07-17 | Plumbing | 18-28 STEINWAY STREET | Plumbing | $90,000 |
| 2026-07-17 | Sprinklers | 18-26 STEINWAY STREET | Sprinklers | $90,000 |
| 2026-07-08 | Plumbing No Plan Review | 50 Cascade Ky | A Single Family Residential New Structure None Project Involving (4 Toilet, 6 Ba… | - |
| 2026-07-06 | Plumbing | 1290 AVENUE OF THE AMERICAS | Plumbing | $106,442 |
| 2026-07-02 | Sprinklers | 89 NORTH 6 STREET | Sprinklers | - |
| 2026-06-26 | Plumbing Permit | 1218 HOWELL ST, MISSOULA MT 59802 | New build single family residence | - |
| 2026-06-23 | Plumbing | 1540 | Plumbing | $137,294 |
| 2026-06-23 | Plumbing | 1651 BARNES AVENUE | Plumbing | $65,000 |
| 2026-06-23 | Plumbing | 1540 BROADWAY | Plumbing | $137,294 |
| 2026-06-22 | Standpipe | 1540 | Standpipe | $18,000 |
| 2026-06-18 | Plumbing | BROADWAY | Propose to perform plumbing and sprinkler work. No change in use, egress or occ… | $137,294 |
| 2026-06-18 | Standpipe | BROADWAY | Propose standpipe work as per drawings filed herewith. No change in use, egress … | $18,000 |
| 2026-06-17 | Plumbing | 268 | Plumbing | $193,000 |
| 2026-06-17 | Plumbing | WEST 47 STREET | MODIFICATION OF EXISTING PLUMBING SYSTEM FOR EATING OR DRINKING ESTABLISHMENT WI… | $193,000 |
| 2026-06-10 | Plumbing | BARNES AVENUE | Filing to supersede LAA #X01323679: Replace (1) Weil-McLain CGa-8 boiler and (1)… | $65,000 |
| 2026-06-08 | Plumbing | 499 PRESIDENT STREET | Plumbing | $69,000 |
| 2026-06-01 | Plumbing | 50 | Plumbing | $9,000 |
| 2026-05-20 | Plumbing | WEST 150 STREET | Install new plumbing fixtures as per plan. There is no change of use, egress, o… | $15,000 |
| 2026-05-15 | Plumbing | GRAND CONCOURSE | INSTALL NEW DISTRIBUTION OF DOMESTIC AND SANITARY PIPING THROUGHOUT THE SPACE TO… | $45,000 |
| 2026-05-13 | Plumbing | 1 | Plumbing | $10,000 |
| 2026-05-13 | Sprinklers | 1 | Sprinklers | $9,000 |
| 2026-05-13 | Sprinklers | 178 | Sprinklers | $33,500 |
| 2026-05-11 | Plumbing | 360 | Plumbing | $40,000 |
| 2026-05-06 | Plumbing | GRAMERCY PARK NORTH | Interior renovation of apartment 2A on the second floor as indicated on plans to… | $9,000 |
| 2026-05-01 | Plumbing | PARK AVENUE SOUTH | Modification/addition to plumbing fixtures and related piping as shown on drawin… | $40,000 |
| 2026-04-30 | Plumbing | 3900-16 CASTOR AVE | Plumbing Permit | - |
| 2026-04-27 | Sprinklers | SPRING STREET | PROVIDE NEW SPRINKLERS FOR ALTERATED COMMERCIAL SPACE AS PER PLANS FILED HEREWIT… | $33,500 |
| 2026-04-24 | Sprinklers | 125 | Sprinklers | $13,000 |
| 2026-04-14 | Sprinklers | BROAD STREET | ALTERATION OF THE EXISTING SPRINKLER SYSTEM ON 10TH FLOOR AS PER NEW ARCHITECTUR… | $13,000 |
| 2026-04-14 | Plumbing | PARK AVENUE | Plumbing changes on the 1st floor as indicated on drawings. | $10,000 |
| 2026-04-14 | Sprinklers | PARK AVENUE | Sprinkler changes on the 1st floor as indicated on drawings. | $9,000 |
| 2026-04-09 | Sprinklers | NORTH 6 STREET | Sprinkler work for tenant build-out as shown on plans, filed subsequent to #B013… | - |
| 2026-03-26 | Plumbing | AVENUE OF THE AMERICAS | Plumbing work on part of the 9th floor (Portage Point Partners) as indicated on … | $106,442 |
| 2025-10-28 | Plumbing | PRESIDENT STREET | Plumbing: includes all fixtures and equipment shown on plan (sinks and restroom)… | $69,000 |
| 2025-08-27 | Plumbing | 215 | Plumbing | $32,500 |
| 2025-08-22 | Sprinklers | 100 RIVERSIDE BOULEVARD | Sprinklers | $25,000 |
| 2024-09-19 | Plumbing | STEINWAY STREET | INSTALL PLUMBING FIXTURES, STORM DRAINAGE SYSTEM AND RELATED PIPING. INSTALL SPR… | $90,000 |
Phone numbers, websites, license status, and CSV export — for all Missoula contractors.
Subscribe — $149/moIs this your business? Get your free verified-permits badge →