| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-04-01 | Sidewalk Shed | 12-11 REDFERN AVENUE | Filing for the installation of sidewalk shed on behalf of contractor | $84,000 |
| 2026-03-31 | Sidewalk Shed | 50-52 49TH STREET | SH/PS57M - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SHED)SUBMITTING ON BEHALF OF CO… | $20,000 |
| 2026-03-30 | Plumbing | 6202 17TH AVENUE, 1ST FLOOR | Provide drinking fountains at two locations. | $16,000 |
| 2026-03-30 | Sidewalk Shed | 379 FIFTH AVENUE 4TH FLOOR | INSTALLATION OF NEW SIDEWALK SHED AT 215 WEST 114TH STREET, MANHATTAN AS INDICAT… | $20,000 |
| 2026-03-30 | Plumbing | 69-43 76TH STREET | Plumbing work for this filing. | $100,000 |
| 2026-03-27 | Sidewalk Shed | 288 BAY 38TH STREET 1D | INSTALLATION OF NEW SIDEWALK SHED FOR HS 560M AT 16 CLARKSON STREET, MANHATTAN A… | $20,000 |
| 2026-03-26 | Plumbing | 165 SECOND AVENUE | Remove and replace roof drains & assoc. storm piping & Reflash vent stacks on th… | $350,000 |
| 2026-03-26 | General Construction | 351 DENTON AVENUE | Total windows replacement and caulking. As per plans . | $2,000,000 |
| 2026-03-26 | General Construction | 58-09 28TH AVENUE | Full Program Accessibility and Flood Elimination | $11,300,000 |
| 2026-03-26 | Mechanical Systems | 2060 EASTERN PARKWAY | AUDITORIUM UPGRADE, AUDITORIUM ROOF, PATH OF TRAVEL, AND EXTERIOR MASONRY. | $14,112,000 |
| 2026-03-26 | Structural | 50-52 49TH STREET | Remove & provide new lintel and clip angles. | $50,250 |
| 2026-03-25 | Support of Excavation | 589 JOHNSON AVENUE | SOE/IS293M - FOR SUPPORT OF EXCAVATION SUBMITTING ON BEHALF OF CONTRACTOR, RELAT… | $20,000 |
| 2026-03-25 | Sidewalk Shed | 50-52 49TH STREET | SH/PS129M - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SHED)SUBMITTING ON BEHALF OF C… | $20,000 |
| 2026-03-25 | Plumbing | 62-43 30TH AVENUE | New 3 Gas Meter/Pipes/Valves/Controls to be installed. New 3 Gas pipe to be conn… | $20,000 |
| 2026-03-25 | Sidewalk Shed | 299 MAIN STREET | Install 546LF of Temporary Sidewalk Shed around PS 126 School Building in conjun… | $10,000 |
| 2026-03-25 | Mechanical Systems | 61-20 71ST AVENUE #E2C | Removing and reinstall roof exhaust fan due to parapet and roof replacements. In… | $36,000 |
| 2026-03-24 | General Construction | 25 LAFAYETTE ST | M152-REPLACEMENT OF PARAPET COPING, ROOF, EXTERIOR MASONRY, WINDOW & WINDOW GUAR… | $15,000,000 |
| 2026-03-24 | Plumbing | 14-24 118TH STREET | Removal and replacement of sump pump in the cellar, replacement of roof drains a… | $22,000 |
| 2026-03-23 | Supported Scaffold | 50-40 69TH PLACE | PS 102M, INSTALLATION OF CHAIN LINK FENCE, SIDEWALK SHED, AND SCAFFOLD IN CONJUN… | $15,000 |
| 2026-03-23 | General Construction | 589 JOHNSON AVENUE | M052- Window Replacement, Parapet Replacement, Masonry Repair, Stairs and Ramp C… | $20,000,000 |
| 2026-03-23 | Sidewalk Shed | 34-35 56TH STREET | SH/PS123M - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SHED) SUBMITTING ON BEHALF OF … | $20,000 |
| 2026-03-23 | Sidewalk Shed | 2060 EASTERN PARKWAY | PS 911M, INSTALLATION OF +/- 122 LINEAR FEET OF TEMPORARY SIDEWALK SHED SUBMITTI… | $25,000 |
| 2026-03-20 | General Construction | 589 JOHNSON AVENUE | Foundation, exterior ramp, and parapet repair | $1,102,347 |
| 2026-03-19 | Plumbing | 31-99 123RD STREET | NEW FRAME & ADA GRATING FOR CATCH BASINS, REPLACE CLEAN OUT DECK PLATES WITH NEW… | $50,000 |
| Supported Scaffold | 50-40 69TH PLACE | PS 102M, INSTALLATION OF CHAIN LINK FENCE, SIDEWALK SHED, AND SCAFFOLD IN CONJUN… | $15,000 | |
| Sidewalk Shed | 2060 EASTERN PARKWAY | PS 911M, INSTALLATION OF +/- 122 LINEAR FEET OF TEMPORARY SIDEWALK SHED SUBMITTI… | $25,000 |