| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-02-19 | Individual | 50-23 TWENTY THIRD STREET | Install New 100Amp panel utilizing existing feeder and branch circuits in Apt 15… | - |
| 2026-02-16 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 8B - Install (2) sets feeder for (1) Panel. Install (1) stove circuit,… | - |
| 2026-02-12 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 6B - Install (1) 3 phase panel. Install new circuit for electric stove… | - |
| 2026-02-12 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 11AB - Remove and install (1) panel in the same location. Reconnect ex… | - |
| 2026-02-12 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 8A - Install (1) Panel. Install (1) stove circuit. Install (1) 4 wire … | - |
| 2026-02-12 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 5A - Install (1) Panel. Install (3) appliance circuits. Reconnect exis… | - |
| 2026-02-12 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 3A - Install (1) Panel. Install (1) feeder. Reconnect existing circuit… | - |
| 2026-02-12 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 3B - Install (1) panel. Install (2) feeder. Install (1) main breaker i… | - |
| 2026-02-12 | Condo Unit Owner or Co-Op Tenant-Shareholder | 50-23 TWENTY THIRD STREET | Apartment 2A - Install (1) panel. Install (1) feeder. Install (1) Main breaker i… | - |
| 2026-02-12 | Corporation | 50-23 TWENTY THIRD STREET | relocate (1) ceiling junction box at Dining Room replace exiting ceiling mount l… | - |
| 2026-02-12 | Corporation | 50-23 TWENTY THIRD STREET | Utilizing existing feeders and circuits, Retrofit fuse boxes with circuit breake… | - |
| 2026-02-12 | Individual | 50-23 TWENTY THIRD STREET | Installation of New Riser and Panel for apartment #46 | - |
| 2026-02-11 | Corporation | 50-23 TWENTY THIRD STREET | 333 E 30th Apt #21F - Install new circuit breaker panel retrofit | - |
| 2026-02-11 | Corporation | 50-23 TWENTY THIRD STREET | 343 E 30th #20G - Install new circuit breaker panel retrofit | - |
| 2026-02-06 | Corporation | 50-23 TWENTY THIRD STREET | Power and Lighting in Gas Meter Room, outdoor room and basement hallway | - |
| 2026-02-05 | Corporation | 50-23 TWENTY THIRD STREET | Wiring of (3) 1/6 HP Pumps in boiler room. | - |
| 2026-02-02 | Corporation | 50-23 TWENTY THIRD STREET | Remove (1) existing federal pacific panel- Single phase, and install (1) new Eat… | - |
| 2026-02-02 | Corporation | 50-23 TWENTY THIRD STREET | Install new 100A, 3 phase subpanel and install (4) new dedicated outlets in laun… | - |
| 2026-01-29 | Individual | 50-23 TWENTY THIRD STREET | Run new circuits to both (2) bedrooms and install convenience receptacles. Insta… | - |
| 2026-01-29 | Corporation | 50-23 TWENTY THIRD STREET | Utilizing existing feeders and circuits, Retrofit fuse boxes with circuit break… | - |
| 2026-01-29 | Individual | 50-23 TWENTY THIRD STREET | Run new riser for 100amps, Install new 30 position panel, relocate old panel to … | - |
| 2026-01-29 | Individual | 50-23 TWENTY THIRD STREET | Air-to-water heat pump wiring | - |
| 2026-01-29 | Corporation | 50-23 TWENTY THIRD STREET | Replacement chiller wiring | - |
| 2026-01-29 | Corporation | 50-23 TWENTY THIRD STREET | Disconnect and reconnect replacement roof top HVAC unit | - |
| 2026-01-23 | Corporation | 50-23 TWENTY THIRD STREET | Replacement of existing meter bank. | - |
| 2026-01-22 | Individual | 50-23 TWENTY THIRD STREET | Utilizing existing feeder and brunch circuits install new 100amp Panel for Apt 1… | - |
| 2026-01-21 | Corporation | 50-23 TWENTY THIRD STREET | Install temp wiring in basement | - |
Phone numbers, websites, license status, and CSV export — for all Balance of Richmondville contractors.
Subscribe — $149/mo