| Date | Type | Address | Description | Value |
|---|---|---|---|---|
| 2026-03-03 | RES | 7444 E ABILENE AVE E ABILENE | Residential primary bathroom remodel: Demolish existing shower, glass enclosure,… | - |
| 2026-02-17 | RES | 1441 S QUINN S QUINN | Demolish existing master bath shower, window, and related finishes, then install… | - |
| 2026-02-12 | RES | 4700 E MAIN ST 1235 E MAIN | Residential guest bathroom remodel. Shower to shower – replace shower pan and fi… | - |
| 2026-02-10 | RES | 713 W EMELITA AVE W EMELITA | Residential master and guest bathrooms remodel: Guest bathroom: Demo existing fi… | - |
| 2026-02-06 | RES | 7740 E NOPAL AVE E NOPAL | Residential bathroom remodel: To include demolition of existing tile shower, sho… | - |
| 2026-02-04 | RES | 7758 E CORALBELL AVE E CORALBELL | Residential bathroom remodel: Remove existing fixtures and finishes and install … | - |
| 2026-02-02 | RES | 5850 E LELAND ST E LELAND | Residential bathroom remodel of both bathroom vanity areas at existing SFR. No c… | - |
| 2026-01-08 | RES | 3741 E CLOVIS AVE E CLOVIS | Residential primary bathroom remodel. Tub-to-Shower Conversion: Removal of exist… | - |
| 2026-01-07 | RES | 1654 E HERMOSA VISTA DR E HERMOSA VISTA | Shower to shower – replace shower pan and fixtures at existing SFR. No change to… | - |
| 2025-12-30 | RES | 1861 S LOMA DEL SUR CIR S LOMA DEL SUR | Primary Bathroom: Shower to shower – replace shower pan and fixtures at existing… | - |
| 2025-12-29 | RES | 1720 W DECATUR ST W DECATUR | Residential guest bathroom remodel. Tub-to-shower: Remove existing tub, faucet, … | - |
| 2025-12-26 | RES | 5056 E EDGEWOOD AVE E EDGEWOOD | Residential guest bathroom remodel. Tub/shower to a stand-alone shower: Remove e… | - |
| 2025-12-23 | RES | 4620 E GRANDVIEW ST E GRANDVIEW | Interior master and guest bathroom remodel. Primary: Shower to shower – replace … | - |
| 2025-12-17 | RES | 7750 E SANDIA CIR E SANDIA | Tub to Tub | - |
| 2025-12-17 | RES | 319 E HILLSIDE ST E HILLSIDE | Replace vanity/sink (plumbing work required) | - |
| 2025-12-08 | RES | 2607 N DUFFUS CT N DUFFUS | Shower to shower – replace shower pan and fixtures. | - |
| 2025-12-03 | RES | 7538 E NIDO AVE E NIDO | This project involves the removal of the existing bathtub, tub surround, and ass… | - |
| 2025-11-19 | RES | 918 E KRAMER ST E KRAMER | Primary & guest baths – demo shower/tub units, trim kits, p-traps, drains, and p… | - |
| 2025-11-13 | RES | 10456 E LAGUNA AZUL AVE E LAGUNA AZUL | Phase 1 involves the complete demolition and renovation of two bathrooms. In the… | - |
Phone numbers, websites, license status, and CSV export — for all Mesa contractors.
Subscribe — $149/mo